Loading...
1990, 11-07 Permit: 90005445 Sewer SPOKANE COUNTY DEPARTMENTOF BUILDINGS W. 1303 BROADWAY AVENUE SPOKANE,WASHINGTON 99260 (509)456-3675 I certify that I have examined this permit/application,state that the information contained in it and submitted by me or my agent to compile said permit/application permit/applicationis true and correct, and authorize Spokane County to mm with processing. In addition, I have read and understand the INSPECTION REQUIREMENTS/NOTICE provisions included herein and agree to comply with same.All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not.I understand that the issuance of this permit/application and any subsequent inspection approvals or Certificates of Occupancy shall not be construed to give authority to violate or cancel the provisions of any state or local law regulating construction,or as a warranty of conformance with the provisions of any state or local laws regulating construction. SIGNATURE OF APPLICATION OWNER OR AGENT _--___— DATE ^.; _ _ _ _ — __ —' _ � PROJECT NUMBER= 90005445 DATE= ii /07/90 PAGE= 01 ISSUED PERMIT **************************** PERMIT INFORMATION **************************** SITE STREET= 11406 E i7TH AVE PARCEL4= 28542-2010 ADDRESS= SPOKANE WA 99206 PERMIT USE= SEWER CONNECTION - KOKOMO *** SEE NOTE *** PLAT4= 001393 PLAT NAME= KOKOMO TOWN%ITE CLCC�= 4 LOT= ZONE= AG%UB DI%TO= F/A= F �-~- ' DEPTH= R/W= 70 � � -- 4 OF BLDG%= � DWELLINGS= OWNER= HATCHER, DON PHONE= 509 928 2763 STREET= 11406 E 17TH AVE ADDRESS= SPOKANE WA 99206 CONTACT AME= JODI - A \ V PHONE NUMBER= 509 924 6182 BUILDING SETBACKS : FRONT= NA LEFT= NA RIGHT= NA REAR= NA ***************************** SEWER PERMIT ****************************** CONTRACTOR= A & V CONSTRUCTION PHONE= 509 924 6182 STREET= 1425 N UNIVERSITY RD ADDRESS= SPOKANE WA 99206 ITEM DESCRIPTION QUANTITY FEE AMOUNT ------------------------- -------- PROCESSING FEE FEE Y 10,00 SEWER CONNECTION i 40.00 ******************************* PAYMENT SUMMARY **************************** PAYMENT DATE RECEIPT4 PAYMENT AMOUNT 11 /07/90 7058 50.00 TOTAL DUE=DUE= .00 TOTAL PAID= 50 .00 PERMIT TYPE FEE AMOUNT AMOUNT PAID AMOUNT OWING --------------- ------------- ------------ ------------- %EWER PERMIT 50.00 5O.00 .00 ------------- ------------ 50,00 50 ,00 5O .00 .00 PROCESSED BY : JULIE %HATTO PRINTED BY : JULIE %HATTO SEWER STUB A%-BUILT INFORMATION IS AVAILABLE AT THE COUNTY UTILITIES DEPARTMENT (456-3604) CONTRACTOR OR APPLICANT I% TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION TO LOCATE BURIED CABLES, GAS PIPING, WATER LINES, ECT. CALL BEFORE YOU DIG (456-8000) SEWER STUBS ARE TO BE CHECKED PRIORTO CONNECTION TO INSURE THAT THEY ARE C FR AND UNOBSTRUCTED TO THE SEWER MAIN ********* CALL FOR INSPECTION PRIOR TO COVER ********** ********* 24 HOUR NOTICE REQUIRED ********** ********* 456-3604 ********** ******************************** THANK YOU ********************************* SPECIAL CONDITION CHECKLIST Project Address: —___—_ —__ ____Project# ______ ____ Use: Dept: Date: Condition: Init: Appr: (in) (out) Dept.of Bldgs. _--- ___.______ .____._—_--_— _ Special Insp. Final Report_ ____________ -- _ _____ — Hydrant( ) __________ ---._ Lock Box _ —_—_. -- _.-- _______ _ Engineer's-_._.__-- --.__.____-- RID/CRP ----_�____--__u._-- - •_________________ ________ Easements Road Plans/Improvements — --_.—_ __.._._---___-- — Bonds • • Planning. . _ Bonds.- — — -- —_-- —�_ • Utilities__ Double Plumbing ULID • Other """"""""""""THIS SPACE FOR COMMERCIAL PLANS TRACKING,CERTIFICATE OF OCCUPANCY ONLY"""" '" """ '" Date received for C/O processing:,•—_ Plans pulled for final processing:_.: _______ _ _________ Temporary C/O issued: .Certificate of Occupancy issued: Office file review by: .Date: Filed map finaled by._------ _—___.__ ____. Date:. -- __________ Ninety days after GIO issuance: Owner/contractor called regarding the return of plans: ____—_. ______ Date: Plans returned: --_-_-_______ _ Received by: ___ No response from owner/contractor-plans destroyed:_______________ ________