Loading...
2010, 08-30 Permit App: 10002588 Pole Bldg Addition Project Number: 10002588 Inv: 1 Application Date: 8/30/2010 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: 440 SQFT POLE BLDG ADDITION Contact: SPOKANE STRUCTURES Address: 510 N MULLAN ST C-S-Z: SPOKANE,WA 99206 Setbacks:Front Left: Right: Rear: Phone: (509)927-0655 Group Name: Site Information: Project Name: _.._ ... ,::.:::fir:.,,, tff `"""°�' ;.. -�..,.z 11.3 Plat Key: 003084 Name: EARLY DAWN 02ND ADD District: East Parcel Number: 45262.3406 Block: Lot: SiteAddress: 14604 E 17TH AVE Owner:Name: ROBINSON,RONALD N Address: 14604 E 17TH AVE Location::CSV SPOKANE VALLEY,WA 99037-945 Zoning: R-2 SF Res Suburban District Water District: 010 VERA Hold: ❑ Area: 12,080 Sq Ft Width: 95 Depth: 127 Right Of Way(ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 1 Review Information: �� �. �.. .. ._ . . . : = Review Building Plan Review Released By: Originally Released: 8/25/2010 By: dgpowell Landuse/Zoning/HE Conditions Released By: Originally Released: 8/30/2010 By: kkendall Permits: _ mon "-`` , Aohluarba,AN• Operator: JD Printed By: jmm Print Date: 8/30/2010 Project Number: 10002588 Inv: 1 Application Date: 8/30/2010 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Building Permit Contractor: SPOKANE STRUCTURES INC Firm: SPOKANE STRUCTURES INC Address: 510 N MULLAN RD Phone: (509)927-0655 SPOKANE,WA 99206 Building Characteristics Group: U-1 Type: VB Total Area 440 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Su Ft Valuation POLE BDLG U-1 VB 440 $8,360.00 440 $8,360.00 Totals: 440 $8,360.00 440 $8,360.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT PEE 1 SELECT $167.25 ACCESSORY PLANS REVIEW 1 SELECT $41.81 WSBCC SURCHARGE 1 SELECT $4.50 Permit Total Fees: $213.56 Notes: per_ , : d_. . . Payment Summary: := ANYW :: . ... . m =..,. un Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $213.56 $213.56 $41.81 $171.75 $213.56 $213.56 $41.81 $171.75 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: jmm Print Date: 8/30/2010 Permit Center Scm nF r 11703E Sprague Ave, Suite B-3 PERMIT NL�IBER: z4y:j pOl�ane Spokane Valley, WA 99206 PERMIT FEE: Valle (509)688-0036 FAX: (509)688-0037 www.spokanevalley.or, Community Development Residential Construction New Construction Accessory Bldg Permit Application Addition/Remodel Deck Other: -7 rk SITE ADDRESS: l tl�jO7' 1 7 S/V'D KA-Kr: (1 i -2-1 / k)11... i ! ei 3 / ` J ASSESSORS PARCEL NO: a s . .341d -PP- LEGAL DESCRII'TION: Building Owner: Contractor: Name o �N S0 Name: filo £POKANE STRUCTU4ES, T.:NC. Address:/ /4,6v , Address: 510 N. MULLAN ROAD City:S�0e, 'h0�U#4.4. State:/,;4_ ZipG1l"d 37 City: F. State: WA_ LL SP(1KANVAT,T,RY Q97(1 Phone: Fax: Phone: Fax: '�a 1 !t7 50q-c177-1)655409-977-406? Contractor Lic No:II Exp Date: Contact Person - City BustnesssYLic No: 2 0 6 1 /1 /08 Name: D4-W a4.v.....&---c. Phone: 901--7—OLS c%g i 96-37 do Describe the scope of work in detail: Cost of Project: $ l 1 7- 3- ' X 20 1 1( /0` t-P D Jr,or, re) 61)Cl s T�et-- hL 06— Proposed Use: tg.��i CDC-iv (7/i L 6 4 1-G� **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: D MENSIONS: #OF STORIES: TOTAL HABITABLE SPACE: /31 (), V 7 .0 X /za' ( MAIN FLOOR TO SQ. 2' FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE FTG: ;1 ti AREA: FINISHED BASEMENT GARAGE SQ. FTG: DECK/COV. PATIO SQ. FTG: 30% SLOPES ON SQ. FTG: PROPERTY: #OF BEDROOMS: QPNSTRUQ-TION TYPE: HEAT SOURCE: SEWER OR SEPTIC?_ The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be proc$'se•` SIGNATOR- . '-- i! / / / DATE: 8-d }�._ _ _ / Method of aym t: ❑ Cash ❑ Check i Mastercard ❑ VISA Bankcard #: Expires: VIN#: Authorized Signature: l RE/ISED 2115,27 Sfokane 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ cityhall®spokanevalley.org Residential Plan Submittal Minimums O Completed Building & Mechanical application with: Accurate address, Parcel Number and/or Legal Description, description of work, owner and contractor information, signature, and date. ❑ Two sets of plans including Site Plan, elevations, floor plans, foundation plans With details, roof plan, framing plans & details. O Show the height of any proposed buildings or accessory structures. O Floor plan for each floor: Dimension to scale (minimum 1/8") and label each Room (including sq. footage of house and garage on plans) Show each level of existing house and square footage of any additions. O All braced wall panel types: show locations and details of installation, including engineered design. ❑ Egress windows: Provide at least one window or exterior door approved for Emergency escape or rescue from a basement and in every room for sleeping. O Smoke detector locations O 22" X 30" attic access location ❑ 18" X 24" crawl space access: ❑ One-hour separation detail: between house and garage ❑ Floor framing details: Joist type, size, spacing and installation details ❑ Roof framing plan and details ❑ Furnace and hot water heater location. ❑ All header locations: type, size, and connections O Foundation plan • Insulation information Property Line Agreement \v/ � P. .cy Date4(1H-C-0 02(1) J1I'' (please print name) as owner of ass: sor's par - number alp Ai 3 D . ocated at (address) request valida on from my neighbor(identified below)that my exis ng garage/storage building is at least ve feet or greater from the property line. I r:: .e a e p erty line be mutually marke sy both parties for identification by - ity o e-.•okane buildiin inspector. AsVig•_ ,1 LAIL41111INZEMMINIMMEN.- or Owne Lt-Co Ur" 7 7114 ddress q9-037 City,'State &Zip 6itarcigmie_cm-7-, (please print nage) as owner of assessor's parcel number (o , 3 � ���,, , located at l/%5 ZO /`71- H (address) do validate from m, neighbor(identified above)that the existing garage/storage building is at least five fe-t or greater from the property line. I wi .s : dete"t'i ing the property line . d mutually mark it for identification by t, e Ci Spokane ilding inspector. j �'J1iii�_�i.7/mai Z Owner (Z/ -o?O 1971- - • Address ,i ii)- '9:0/ \ Alley tc 7- City, State &Zip - • - < \Grro-9 foi 1 \ \\\\\\ \ \ IQ \ \ \ \ \ \ "--dTr1/4F› Cbc-, COAr vo.cn — ft � "k�� • LEGAL a SCRI�TON �tkL�. �o ����� � �� ,ix�• TRUCTURE tSC er ^ Yzl • �i ' dwx t i,E, 7914 Sprague,gr - 1' y ��Spokane, Washington, 99212 .1 ,. (509) 927-0655 _� � ��� il•SPOKAS 112606 • - �� Si to Plan - J • \ • \\\ !'/, '1 ; 4),,._ .,,,_':_/,/li.::,....:1,,:i.'.,..':::.'...,.:7.:-..:.,1:' Show 1, -'' , . t , , /•' NORTH , , • V a Y X Show streets/alley W„,O1v Show septic/sewer/drainfield Show existing buildings Show proposed building 30 • Show setbacks-front,sldes,rear 5 • Show lot size 1 zv/ ZONING CRITERIA — SPOKANE y CITY If closer than 3'to property line-need firewall - Out of rear 30'and closer than 5'-need waiver from neighbor < ( Cp�'7 ) > Cant cover more than 50S of rear 25' . / i Corner lot -building must be 20'from side property line '2' 60'minimum setback from front property line Less than 6'from residence-need firewall • 1 COUNTY I.' Maximum lot coverage Inc. septic system -.353 • 5'minimum side yard setback (unless 70 or more back - then 3'minimum) If closer than 3'to property line-need firewall . ' Minimum front setback -25'from property line or 55'from center of road-whichever is greater ii Minimum sidestreet setback - 15'from property line or 45'from center of road- whichever Is greater 16'and over to ridge in height may change setback requirements ' 10' from septic/drainfield ' Less than 6'from residence - need firewall • 1C)\(\ \dpi c O t� , S IA e_ I c \ �c� nz -� 5- 14 , \in 1 WiA CR637 _____ _.....ill 1, - ;)-- 4\ itila o T \4_,I,,. vim. x s -TorvCali ` i . ' ) / - --- ,9—VD , _____4:r f * i ' l 17 CI 1 a_ \\0\Aei 1 . , } W Z ` '"u 8 ____j \) 1 s • • For City Use Only Spokane CITY PLUS Project Number Project Address 4000 alle y 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 • permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete,accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE—APPLICANT PINK—BUILDING FILE REV 9/07