SPOKANE COUNTY DEPARTMENT OF BUILDINGi AND SAFETY Z. Z- Z.Jr--A/j
'q
w.1a09 BROADWAY AVENUE
' SPOKANE, WABHINOTON 98260
(540) 456-9875
i cerdty that 1 have ex~mtned thEs parn+tt snd sttte tfut the Intotmatbn aontalnw tn ft and submittN by me ar mys8entto camplloseld pwfnlt letrue and cornecL ln
additlon, 1 hivs mad nnd understartd the INBPECTION REOUTAEM6NTS/NOTlCEprvvistonsiricluded fmrefnand agreeto complywhhswn& All provislorp otlRws
and ordinanoas povsmtn Ihb pn ot warR wiU be comPli~ withwh~thersp0aliied herein or noL 1 ur~deratarid that ths bsu~ae o! thls permkandany svba~uent
Inapeattan ~rpovtls or ~t ty~ta af Occupancy shaq not ee coristru80 to phr~e authority to vfofate o► oanoof thep~rtelor~s ot any stete or Iocat law repulatinp
~ oo~at►uctbn, or as a warnnt~r of conbrmtRCe w A the praviNorts a1 any etate or lo~t taw~ repulatirtp conatructton.
~ 81CiNATURE OF APPLICATION
OWNER OR AGENT I1ATF
e
fr
~ t
~
PROJEcT NuMBER= ee002641 ~ATE= 09i06i88 PnGE= 01
AFPLxcATxoN
APPLICATTClN
S1TE STREET= 12312 E SF'14AGUE: AVE PARCELIV= 22542-0408
ADDRESS= SPt7KANE WA 99216-
F'f RMTT USE= 4 SZGNS (PQLE SZGi~ 2-9 FEET HIGW )
PLA7^W= 002504 PLAT NAME= ST'EWART' S SUB.BLK. R64 OF OF'P.
BLOCK= L.OT= ZONE= CQMM DIST*= F
~ AREA= 00000040 F/A= F WIDYH= DEF'T'H= R/W=
0 QF BLDGS= i ~ DWELL I NGS=
L
OWNEfiiw CNEVRON U.S.A. INL PHONE= 2-06 62.8 5192
~ STREET= P CJ BQX 220
~ ADDRESS= SEATTLG WA 98111
~
~CONTACT NAME= MR FtRIGGS F'HpNE NUMBER= 206 628 5201
BUIL.DIWG SET'BACKS FR(3NT= NA L.EFT= NA ftIGHT= NA REAR= NA
,
REVIEW INFORMATICIN
~ DATE
` ~EPARTMENT NAME REVIEW COMMENTS IN/OUT INITIALS
--_-__w_.~__.._-_
' PU Tl-DI NG & SAFETY P'LAN REV I EW REQL! IRED 880906 JEF
-----w wr -w ww w w -Mu uu ur MN M-----Mw ---4 W- M M rr ~ ~ ww w~ -w ------w Iw w ---rr -w Ar -M w ~ w ---r -W 1~w
~
CCIUN? Y CNG INEEk S T TE PLAN REVIEW REQU x RED 880906 JEF
I
vaom.. _ -tL' _ CAA.. . _
COUNTY F'l.ANNlNG SITE PLAA! REVIEW REQUIRED 880906 JEF
..q4-88
~_A
~
SIGN PERMIT
CUNTRACTaR= PNONE=-
SYFtEET=
aDDF;ES'S"=
PRocESsEn gY w~NDEL, rLoRIA
F'RINTED BY FORRY, JEF'F
THANK YQU
- - . . _ _ ~
INFORMATION WORKSHSB'1'
PARCBL NUN~ER: 2 2-0 S + Zw. 0+0 _
STR138T ADDRBSS : 31 Z F ~
CITY/STA3~'E/ZIP: ~
SUBDIVISION:
BL+OCK: IAT: ZONS: DISTRICT:
LOT AREA: F/A: WIDTB: DBPTB: R/W: ,
# OF BUILDINGS: OF DWLLLINGS: WATSR DISTRICT:
OWNFR:. afezoopdp,~&PHONE : - - ,
~
MAI LING ls►DDRSSS :
CITY/STATS/ZIP:~
QONTACT:~~L PHOIIIE:
.
SETBACRS: - FR0NT: LEFT: RIGM: ItSM:
,
PERNIIT US$ :
*:***lt~it:*~~lt*~lt~~*~tA~~t*s*~tlts~t~~ts*~tl~*~*****:*~t7t~t*~t**s**lt:sr*~~t~s:*~e**~t~tit~tlt~t~*!t~
Bvii.nrrTG rxFOxJVTZON
CONTRAClOR LICENSE NUMBER:
9t
~ OONTRAG'TOR:,~tE-A PHONE:
~
MAILING ADDRESS : 7 v1o
0 "A
42 A
41- v .
ARCAITBCT/ENGINgSR: PHONS: - -
MAILING ADDRESS:
NSW: `RF.MODEL: ADDITION: - CErANGE OF USE i
DWELL iTNITS: OCCUPANT LOAD: BUILDING gGT: STORIES:
BUILDII+IG DT14ENSIONS: _ R (WIDTH X DEPTH) SQ. FT.:
REQUIRED PARKING: VHANDICAP: SBWSR (Y/N):_ BYDRANT.
K Z F
~ ~
M
1
~
' - !
cpN~~j
,
T44
Ch+~v ~ea ~
~
~ t1
y8
~
-
PvtAP ~s LAAID
~
.
o~
"
1
Area Sign & Ltghtin' Semice
3806 E. Columbie, P.O. Box 0
Spokane, Washington 99206
- (509) 487•3920
7_ JZ JZ F~ va..
~ E D Cha~relY N~ c~$~Qox~ ~
.
g
~ w
Sea-A&E_.5.a' LuMAI ~i
z
~ ~ ~ ~ v`,tsyav ~ j ~ ~
1
tteS
r~ ~
t y
~
~
~
~ - -
SPRmv vE , ~ _ . - - - _ _ ~ - . - - - - CCN'TFR.
I ~
,
~
.
s~9N
:
t '
N ,
~4s4
~
S w
- iVnr ro scAL t~"
1>
r
NI ~
Spokane County
, Departmcnt of Building & Safet;~
.
JAMES L. MANSON, DIRECrOR
r
LETTER OF TRANSMT TTAL
Tp: Air Pollution Control Authority
A Eng'nee r' s 0 f fice RECEIVED
~
Environmental Health ~ 19~
Planning Department JU{~ Z
Utilities Department
in d Saf e t SPOKANE CDUNN EN~INEER ~
FR0~1: Department of Build g an y
DATE: June 21, 1988
RE: East 12312 Sprague Avenue - Chevron Convenience Store
As required at the Pre-application Conference dated
3/2/88 , a revised site plan has been submitted for
distribution to all conference participants. The revised
plan contains this department's stamp with the date of
6/20/88 noted.
Please advise us if you have all the necessary information
to release the building permit.
TLO:db ~
NOR'IH 811 jEFFEMN ~ SPOKANE. WASMNGTON 99260*0050 • TaEPHONE (509) 456•5675
~ ► . .2z-- ~ .
-
a f Spokane County
De ariment af Buildin & Safet
p ~ Y
. ,
3 JAMES L. MANSON, DIRECTOR
. RFCFjt/EO
14qR
~
TO : Bob McCann, Engineer' s Of fice '100Nf Cp~~~•;~~ ~
John Pederson, Planninq Department
Tom Postlewait, Building and Safety
Daryl Way, Health District
~
Ft20 Tom Davis, Code Compliance C~ordinator
Department of Building and Safety
DATE: March 8, 1988
RE : March 7, 1988 - Pre-Construction Conference
East 12312 Sprague Avenue - Chevron USA, Inc.
Enclosed is your copy of the minutes to the referenced meeting.
Should you have any questions or need additional information,
please feel free to contact me.
TLD:mak
cc: Sob Downs, Chevron USA, Inc.
Robert Nehren, Chevron USA, Inc.
Gary Williamson, Chevron USA, Inc.
Dean Fowler, Utilities Department
NORTH 911 JEFFERSON • SPOKANE, WASHWGTON 99860•0050 • TELEPHONE (509) 486-3675
MINV li:s5
PRE-A►PPLICATION CONFBRSNCE
$AST 12312 SPRAG►UE AVENUS CAEVRON USA, INC.
MARCH 7, 1988
` CALL TO ORDBIt: The meeting was called to crder at approxi.mately
10:00 a.m. by Building and Safety's Code Compliance Coordinator
Tom Davis, with the following in attendance.
PERMIT REVIEW PARTICZPANTS:
Tom Davis, Building and Safety
Marla Rerr, Building and Safety
Bob NicCann, Engineer's office
John Pederson, Planning Department
Tom Postlewait, Building and Safety
Daryl Way, Health District
AFPLICANTS:
Bob Downs, Chevron USA, Inc.
Robert Plehren, Chevron USA, Inc.
Gary Williamson, Chevron USA, Inc.
SCOPE/PROJ$CT DBSCRIPTION:
I. General Overview - Chevron USA, Inc., is proposing the
purchase and subsequent demolition of the existing structures and
the construction of a new service station/fvod mart located on
the southeast corner of Sprague Avenue and Pines Road. The food
mart portion of the structure will consist of approximately 932
square feet. The total square footage for the lot is 47,000
square feet. There will he no food service, strictly sales.
Eight fueling positions are proposed. The building will be
setback approximately 50 feet from Sprague in order to allow free
traf f ic f low.
The applicant distributed to all participants a brochure prepared
by Chevron USA, Inc. which identified the proposal.
II. Construction Schedule - At this time the purchase of the
property is under option. The option period will end April 30.
Therefore, the applicant would like to know the possibility of
obtaining a permit before that time. Construction drawings,
along with the drainage plan will be submitted the week of March
21, 1988. The lease for the current property will expire in
August, 1988 therefore, the applicant would like complete
construction by that time. .
- 1 -
a 0
. SUIMMARY OF DEPARZMENTAL REQUIRENTS :
I. Planning Department (456-2205)
:
A. Discussion/Requirements ,
1. It was stated that this proposed property is
within a Commercial zone, which is adequate for the proposal.
2. John Pederson indicated that he had been in
contact with John Hicks of R. Lee Architect for the
project regardiag setbacks and other information
pertinent to the project.
3. It was noted that setbacks as inda.cated on the
site plan are adequate for the project.
B. Permit Release Requirements
1. A Certificate of Exemption is required to be
completed in order to combine all parcels. The
applicant was ga.ven the Certif icate of Exemption
application to fill out and return to the Planning
Department. This completion of the Certificate of
Exemption will be required prior to issuance of
Certificate of Occupancy.
2. Although landscaping is not a requirement, it was
noted that the Planning Department will need plans for
any landscaping installed, along with a letter of
intent to install the proposed landscaping.
3. The signaqe is adequate however, should the
apglicant choose to install signs on Pines Road, the
Department of Transportation has jurisdiction and will
need to approve signage.
II. Engineering (456-3600)
A. Discussion/Requirements
1. A cogy of comments was given to the applicant and
Building and Safety by Bob McCann.
2. Your contact person at the Engineer's Office will
be Jerry Sims.
B. Permit Release Requirements
1. A drainage plan including calculati.ons is required
to be submitted.
- 2 -
. a ~
.
, A'copy of Spokane County drainage plan calculation
requirements was given to the applicant. The applicant
indicated that the complete drainage plan with
calculatioris would be'submitted the week of March 21,
1988.
2. Copies of approach permits obtained from the State
, Department of Transportation for approaches from Pines
Road are required to be submitted to the Engineer's
Of f ice .
3. Approach permits for approaches from Sprague
Avenue are required to be obtained from the Spokane
County Engineer's Office.
III. Health District (456-6040)
A. Discussion/Requirements
1. It was stated that the Department of Building and
Safety would require demolition permits for all
buildings demolished. It was suggested that all
materials be deposited in a licensed landfill.
2. It was noted that this property has several
on-site sewage systems and upon demolition of the
existing structures the tanks should be pumped out and
either removed or filled.
3. If food preparation is to be done on site a full
menu is required to be submitted. The applicant
indicated that no food preparation will be done. It
was noted that there will be no grill or roaster on
site. Only coffee pots, popcorn popper and other items
of this nature will be used.
4. A operational permit is required to be obtained vn
an annual basis for the operation of the food mart.
The fee for this will be prorated on a 6 month basis
should the food mart open after July 1, 1988.
B. Permit Release Requirements
l. A full set of construction plans is required to be
submitted for review and approval by Health District.
IV. Utilities Department (456-3604)
A. Discussion/Requirements
1. The Utilities Department'was not present, however
comments were submitted prior to the conference.
- 3 -
~ . . ~ ~
. 2. This project will connect to Valley sewer.
B. Permit Release Requirements
1. The applicant must exercise their option on the
property before Utilities can qo ahead with plans for a
specific type of side sewer to be constructed. The
.
applicant should contact Dean Fowler, of the Utilities
Department regarding this matter.
V. Building and Safety (456-3675)
A. Discussion/Requirements
1. Tom Postlewait has conducted an initial plan
review for the proposal.
2. Paul Chase of Fire District No. 1 has been
contacted regarding fire flow requirements.
3. It was noted that the building and canopy are
required to meet a 30 pound snow load, 70 mph wind load
and a seismic zone of 2.
4. It was noted that the plans should comply with the
1985 Edition of the Uniform Building Code, the 1985
edition of the Uniform Mechanical Code, the 1985
edition of the Uniform Plumbinq Code, the Regulations
for Barrier Free Facilities, the Washington State
Energy Code and the lightinq budget and switching
conform to the requirements of the Northwest Energy
Code Chapter 5.
5. It was stated that the tanks are required to be
double containment tanks.
6. Fire District 1 has indicated in order to meet
fire f low requirements, a fire hydrant will be required
to be installed at the second approach on Sprague
Avenue.
7. The required handicap parking space is required to
be positioned so as not to cross traffic in order to
enter the building.
B. Permit Release Requirements
1. A critical materials list was given to the
applicant for completion. It was stated that there
will be no critical materials used for this project,
however, the critical materials list is required to be
submitted to Building and Safety for their files.
- 4 -
i
o • •
♦ •
2.' Two complete sets of engineer or architectural '
prepared plans are required to be submitted for
completion of the pla4 review and approval of the
project. •
' APPLICANT' S CONKOTS/ACRN :
~ The applicant acknowledged that all comments/requirements were
understood. The applicant had no further questions at this time
regarding permit requirements. The applicant indicated that
complete plans would be submitted the week of March 21, 1988, and
requested the number of plans required be noted separately in the
minutes for clarification.
The number of plans to be submitted are as follows:
A. 2 complete sets of construction plans, alonq with 5
additional site plans to 8uilding and Safety.
B. 2 landscape plans to Building and Safety.
C. 1 complete set of construction plans to Health
District.
D. 1 landscape plan to Planning Department.
CORRBCTIONS:
To minutes or changes from what appears in the minutes, we should
be notified within one day of your receipt of these minutes.
To plans as required by any or all of the above-listed
departments shall be submi.tted in sets of 7 to Building and
Safety who will then distribute accordingly to each department.
AW0 : There being no further business, Tom Davis thanked
the applicant and the departments for their participation and
reminded all that he should be contacted if there are any
unforeseen problems which may arise.
The meeting was adjourned at approximately 10:30 a.m.
Copies of Minutes to: All participants
File - East 12312 Sprague Avenue
Chevron USA, Inc.
Spokane County
Department of Building & SafeCy
JANIES L. MANSON, DIRECTOR
LEYTER OF TRANSMITTAL
T0: Engineer's Office
Environmental Health
Planning Department
Utilities Department
FROM: Department of Building and Safety
DATE February 25, 1988
RE: East 12312 Saraque Avenue - Chevron
Please note the pre-construction conference for the above
referenced project scheduled for 3-2-88 at
10:00 a.m, has been changed to 3-7-77
at 10:00 a.m.
TLO:db
?
.
~ ~i~ - _
B4 Vt.
~ I,- & &f~
oa:t Lpe a n4k,~ e, qo ~
~~~.b
i ~
~
ti
T ~
3d
*U p P°~I ~'.VRAel ~
cwp
~
~
~
NORTH 811 ~
JEFFERSON ~ SPOKANE. WASHIlVGTON 9986000050 •
TELEPHONE (gflg) 456-3675
r
OFFICE OF THE COUNTY ENGINEER
SPOKANE COUNTY, WASH I PIGTON
,
I-1_Ir UfiON STAT I0N D.-tle _'w''- ~f3~„ r_
~Z.._..~!~---i'_SPrenGrJF~~,vFa
~
r
ai;Cel : ; ~^5~=~-t:%~.~~0
~hc~ Ga_►fl° 1•= rUlT1pla'~ ~d -A reVieW Gf the
it~?9 '!'',1"i..o'~7~ f3iG~L-~ , Tii-e tL+11..?4V1nq fif'_,t i .<< ~G,-i iZvtisE. 1~e pf'0`o].t~h?C~ l.Ci
I L.4-1 p1 vv ith7 C3'»d 1 _ l-J .
,
V c ' l j r , ! I ` ► a . q[: ~ s t 1 ti , t : ~ i&w pf' epzt I' ed 1 t 1
t10 ~L vJ _f1 cp o i+ci l~ti~ COLtl'1t 9-0 7 dO I I4'1C?S +7#, S Liti'ii1~W-A I C-- r rlaflalgeti1,~f1t~~ ~ ~•i~
L .bs on
A (1-N qr' c I L.L! Za~t 1 Ei'-i5 ~+J~ irlo ~I° t10 lh& ~ L^.•i '1Qar --At•ef'i
~ i-i ~ C= ~ i ~ ct .L ~ ~ ~ ~ ~ ~ I ~ : ~ ~ i ' ~ ' t ~ ~ ~ l_ ' ~ ~ E~S a! 1-1. ' d w I
eitn- A-t L~ bL- currt,t; uc
~ . F : 1 1 e-Cj Lj i atJ m t=' I t l l! I 1 - 11,3 •1 i`I t i L+ a 44. t U (Ti 1~ T L ~l C.a 7-2
1 , ~ { v (1 i_ ~-t l t: r o-sS 5 c-t t I C t C i £.1 1, wet 1 .
Ca7 C±1 i c4f _LJr15 tQ USLLfy "It' 13Ld:11DiPI <1r7d i_;~pc- C1f drywx_l1,_x,
E1 ev~~_i c.~n a f carywe ll 3,1~-~L.c~ d~,t~llc:a
f~3~.
B) The following improvements withxn adjacent Right of Way are
required prior to the release oi a building permit:
1. Approach permits musi. Ue ~szJr ~-~a n~~f from Lhc rounty
Engyncer iiict Departmeiit {or dr io~e-way c.-,prr,..~acWhcs t,.5 tht, f ol lowing streei:,
a„ SFRArUE AUCNLlE
l~~~pr~oach p~,~r~its mLtst ti~~ ~~(~~.a lrseol Sr•om lh►e Statz of
W.--~s;-lii-►,t--)s-s Dc-partrtSent av TransportakiL,r= f_r- %J;P,vew=iy aGproaches to S~'e-,^r
l r 7!ie5 r' oad
E) Insufficzent information was submitted wYth the proposal. We are
unable ta proceed with our review. We will need the following before we
c an p r oc eed :
le Drainage plan as specif a.eda
Your contact person at the County Engineering Department may be
contacted by calling 456-3600. Your contact person is JERRY 3IMS.
Spokaiie Couiity
Departhicnt• of Iiuildin~ & Safety
!i4 t_ •i ~„wj~"
e~-
D,~u
~ JAMES L MANSON, DIRECTOR
~
r. . - - OF TRrANSiUTTAL,
FEBRUARY 24, 19$8
TO : Engineer' s Of f ice
Environmental Health
Planning Department
Utilities Department
FROM: Department of Building and Safety
At the request of JOHN HICKS , the Department of
Buildinq and Safety is conducting an initial review for the
following described proposal prior to completion of final plans:
PROJECT DESCRIPTION: CHEVRON
LOCATION:E. 12312 SPRAGUE AVEIdUE ,
PARCEL NUMBER: 22542-0408, 04090 0410, 0411, 0437
This review has been scheduled for 3-2-88 at
10:00 a.m. in the Building and Safety conference room.
If you wish to attend or want to give input at this time, your
comments will be welcomed.
Enclosed for your preliminary review is a draft plot plan.
TLD:pjk
cc: Dennis Scott, P.E.
~ ~
NdRTH 811 JEFFERSON • SPOKANE. WASHiIVGT'ON 99260•0050 • IELEPHONE (509) 456-3675
A TloNs
cv~ ~
NC~►~
•T ~'~1'6
~ * 7l} ~ ~ •
Y f gVC 4
~ d. ~ ~L. ,t~ ~ \ ~ qn~l~'•~ r~ s j ry 4~t'' kv. f
~ +R"aS"'~•~~. ~4~ ~'}~~`~Sf`•J4{~ w ~~fi7eN 4 ~dg~ y~t~+~y A
~i y~ ti ~ ~c~ p~ v ..ti • a a~~i" r
i
~ • 'rp '~'-0 • ~ ~ ' h'~ri , B ` ~ A ~b„S r~~6 r~ :
4
tA
S
~ ; 0 ~~~\~~n~,~Z~GF~ ~ v . ~ ~f 1
~h
f '
~ ~'1 v I w ~h , ~
~ ~ 4~,~1s~ ~ ~ ° , ~ c '~a • ~ ~i
~ a ~
♦ ! ~ ti+, ~ h o' ~ ~ 4.
~ ~b ~ ~ ~ ~ .r ' ~ ~ I'
~ ~ ~ ~'r~ ~ . ~ ~ b
~ p ~ • ~ ~ a`~ ~ , t ' "a~~ ~~g~~,~
~ i ~ • ~ ~
I ' . ~ ~ •
~
~ ~ ~ • ' _ ~ ~ 1
i ` ~ ~~~,y ~r ~ •U~~ R ~ ~
~
,
~ ,t D
~ i9 ._,,,ry r'r► .f
wD
Q ~
~ U~~ ~ / ~ " (~y►* A~ ~~W6~qtN~
` ~ M eN ,aaa
~~Sqea
0