Sprague E 14704 Exxon Station , - 1_o v-
.
/
Contact Pereon Name Bus~~~winess Name FJl~,J
01^.
Addrese Addcess E 1c~c~~ _ 4y-,2
Phone ei Phone -
County Contact Pereon (-2r, N_X7L S 01l Phone yo. 456--3600 Date ~ COMMERCIAL BUILQING PRRMI'T REVIEW
Thie building permi[ review is iatended to appraiae you of the improvements (roadway, side-
walk, curb, stormwatec, etc.) which must be constructed in essoclation with your building
permit. Thie checkliat will be filled out by the Eiigineer's ataff and a copy will be re-
turned to you at the time that the permit is initialed by the Engineering Deparrment. All
requirementa shall be completed prior to issuance of the building permit. All unchecked
boxes require additional reaearch or information to make a determinaCion.
1. Stormwater Draina e Coneiderations
'A. Per gufdeneor ntormwater Management 1981" both on and ofF si te.
l. 20$ Considecations* Yes q No
2. Plood hazard zone coneiderations** a Yes p No
3. Stocm Drainage Plan Yes a No
II. Planuins Action 0
1. Plat, short plat, rezone, Conditional Use or Variance Yes a No
on property. Planning Number Z~ S`1V73 rA~
2. Are requiremente of planning action incorporated Yes q No
into eite plan 1194 G L~~ of
III. U ht of Way c-4~
1. Does permit neceasitate R.O.W. dedication a Yes o
2. Did zone change require R.O.W. dedicetion ~ Yes o
3. Radius at corner ~ Yes No
IV. County Road Improvements
1. Roads need to be improved. How wide Yee ~ No
2. Curb Yes lizIAO
3. CRP/RID agreemen[ (Copy of deed, contract, or p Yes No
title report required.)
4. Plens f or improvements provided es ti No
5. Sidewalk Yee Li No
V. Parking Plan 6 Approach Location
1. Review and sign off by Traffic Yee Li No
2. Approach Permit from Engineer'8 Office 6/Yes ~ No
3. Stare or Gi ty sign of f Li Yes o
4. Ia this road on 6 Year Plan Li Yes VNio
VI. ULID Agreement: Li Yes ~ No
VII. Field Review: Preliminary Commente CZ? 00A/40
7T:Z) d.)& 7 -'0/
* A11 land within the Aquifer Sensitive Acea, where deemed feasible by the Counry Engi-
neer, shall iacorporate stormwater treatment to rnitigate the potential for gcoundwater
degradetion. (See Guidelinee f or Stormwater Management 1981, Spokane Board of County
Commisaioner'e Resolution No. 80-1592, as amended.)
The purpose of f lood hazard zone review is to minimize losses due to f looding in spe-
cific area8 designated by Flood Naaard Boundary maps oa file at the County Engineer's
OFfice. (See Spokane Board of County Commiasioner's kesolution No. 81-0726, as
emended.)
8/22/85
I