Loading...
2016, 04-04 Permit App: APR-2016-0041 Approach $61( Community Development Department Permit Center (Staff Use Only) 11703 East Sprague Avenue,Suite B-3 PERMIT NUMBER: Spokane Valley,WA 99206 Valley,1ey� PERMIT FEE: Fax:Tel:((550099))762808--5020430 (509)(509) 68720-5240&0037 4000 permitcenternspokaneval ley.org APPROACH PERMIT APPLICATION PROJECT ADDRESS: / 0 ,2 Z e . 20,,.. � START DATE: I -- g--- ANTICIPATED COMPLETION DATE: V BUILDING OWNER NAME:: __ ` /A MAILING ADDRESS:GGF lir J/�"C CD'v ' 7"--�,Qf. v 9 CITY:77 pacci os p /,ST,ATE: I/`�" ZIP: ` ?0 Z CONTACT PERSON NAME: (Com(r V v V �7 / / PHONE: 'f / -i�D b FAX: (i 7C�J^//c? CELL: ,—,..c,..--z AME: 7t14 C / = ''tG MAILING ADDRESS: �179Z-2 ,(Z� // L 2 E' 2 2 CITY: ?/ 4'4' (/v`1 ! STATE: ZIP: PHONE: Z! - Z 2_9�1i 7 FAX: CELL: CONTRACTOR LICENSE#: EXPIRES: CITY BUSINESS LICENSE#: PROJECT DESCRIPTION(Please Provide Site Sketch) El Residential Driveway El Commercial/Industrial Driveway 0 Existing Curb&Gutter 0 Rural Road Section 0 Culvert Installation El Sidewalk Repair/Construction El Other Conditions: Bond/Insurance certification must be on file with the Ciry. DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2)Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional informatio• --ay be required to be submitted and subsequently approved before this application can be processed. Signatur: Date: i � t .4ft-204_ aG el 1 DE-001:V-1 , /y .... _ _.._..._. __.-. ___ Page 1 of 2 APPROACH PERMIT APPLICATION REQUIRED SKETCH INFORMATION Provide required measurements(in sketch boxes),and include street name. Check all existing conditions that apply: Ili Sidewalk 13Drainage Ditch ft wide DDrywell(show location on sketch) ft from back of curb ro Other(please describe below) OStreetside Swale I DISTANCE FROM NEAREST PROPERTY LINE AY BE LEFT OR RIGHT SIDE) FT(SEE TABLE) w a aE CONCRETE APPROACH CURB RETURN CURB/ I—4' THROAT WIDTHill FT 4' WING (SEE TABU WINO \1F CORNER LAT, DISTANCE FROM STREET NAME Z Z w RETURN FT(SEE TABLE) STREET WITH CURB DISTANCE FROM NEAREST PROPERTY LINE AY BE LEFT OR RIGHT SIDE) Dill FT(SEE TABLE) 15 RADIUS 0:7) ASPHALT RADIUS APPROACH RETURN EDGE OF WIDTH FT ASPHALT (SEE TABI W CODER LAT, DISTANCE FROM STREET NAME RADIUS FT(RETURNSEE EE) STREET WITH ASPHALT EDGE Approach Requirements: • Maximum 2 approaches per property frontage;one on arterials. • Total width of approaches not to exceed 50%of frontage width. Residential Approaches Commercial Approaches Distance from Curb/Radius Retum 15'minimum 75'minimum Separation between Approaches(measured from centerline to centerline of See Page 7-27 each approach) None specified in City Street Standards Throat Width(flat portion) 16'min.,30'max. 30'min.,40'max. Wing Width(at curb line) 4 feet typical 4 feet typical Minimum Distance from Side Property Line(@ r/w) 5.0' 5.0' Minimum Distance from Crosswalk 5' 5' DE-001:V-1 Page 2 of 2 SpÔ1 \hhhhhh1h1 Development Engineering ►Ail \Ti11ey i 1 6 • Spokane ValleyWA 99206 11707E Sprague Ave Suite 0 ♦ p 509.921.1000 ♦ Fax: 509.921.1008 ♦ cityhall®spokanevalley.org Design Deviation Request Date: 4/4/16 Project: DeForge Approach Construction Requestor: Name(print): Signature: Chip Mohr Explanation of Issue: Requesting additional access point(total of 3)for duplex lot Standard or Guideline from which deviation is requested: Maximum of 2 access points per lot Deviation being requested: 3 access points Justification and Engineering Design benefit: Utilize existing drives and still provide more off street parking Supporting Documents(attached) Site Plan 411-704- 1� ZOl`- 0G4I 777_ Requestor not to write below. Development Engineering Recommendation: WApproved as submitted Comment(s): ❑ Approved with Changes ❑ Request Denied -74V#IX-CW Signed-Development Engineer(for project) Date ilivAk.• � ned-Senior Development ngineer D. c w