2016, 04-04 Permit App: APR-2016-0041 Approach $61(
Community Development Department
Permit Center (Staff Use Only)
11703 East Sprague Avenue,Suite B-3 PERMIT NUMBER:
Spokane Valley,WA 99206
Valley,1ey� PERMIT FEE:
Fax:Tel:((550099))762808--5020430
(509)(509) 68720-5240&0037
4000
permitcenternspokaneval ley.org
APPROACH PERMIT APPLICATION
PROJECT ADDRESS: / 0 ,2 Z e . 20,,..
�
START DATE: I -- g--- ANTICIPATED COMPLETION DATE: V
BUILDING OWNER NAME:: __ ` /A
MAILING ADDRESS:GGF lir J/�"C CD'v ' 7"--�,Qf. v 9
CITY:77 pacci os p /,ST,ATE: I/`�" ZIP: ` ?0 Z
CONTACT PERSON NAME: (Com(r V v V �7 / /
PHONE: 'f / -i�D b FAX: (i 7C�J^//c? CELL:
,—,..c,..--z
AME: 7t14 C / = ''tG
MAILING ADDRESS: �179Z-2
,(Z� // L 2 E' 2 2
CITY: ?/ 4'4' (/v`1 ! STATE: ZIP:
PHONE: Z! - Z 2_9�1i 7 FAX: CELL:
CONTRACTOR LICENSE#: EXPIRES: CITY BUSINESS LICENSE#:
PROJECT DESCRIPTION(Please Provide Site Sketch)
El Residential Driveway El Commercial/Industrial Driveway
0 Existing Curb&Gutter 0 Rural Road Section
0 Culvert Installation El Sidewalk Repair/Construction
El Other Conditions:
Bond/Insurance certification must be on file with the Ciry.
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the
dwelling is/will be served by potable water. 2)Ownership of this City of Spokane Valley permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional informatio• --ay be required to be submitted and subsequently approved
before this application can be processed.
Signatur: Date:
i
� t
.4ft-204_ aG el 1
DE-001:V-1 , /y .... _ _.._..._. __.-. ___ Page 1 of 2
APPROACH PERMIT APPLICATION
REQUIRED SKETCH INFORMATION
Provide required measurements(in sketch boxes),and include street name.
Check all existing conditions that apply:
Ili Sidewalk 13Drainage Ditch
ft wide DDrywell(show location on sketch)
ft from back of curb ro Other(please describe below)
OStreetside Swale
I DISTANCE FROM
NEAREST PROPERTY LINE
AY BE LEFT OR RIGHT SIDE)
FT(SEE TABLE)
w
a
aE CONCRETE
APPROACH CURB
RETURN
CURB/ I—4' THROAT WIDTHill FT 4'
WING (SEE TABU WINO \1F CORNER LAT,
DISTANCE FROM
STREET NAME Z Z w RETURN
FT(SEE TABLE)
STREET WITH CURB
DISTANCE FROM
NEAREST PROPERTY LINE
AY BE LEFT OR RIGHT SIDE)
Dill FT(SEE TABLE)
15 RADIUS
0:7)
ASPHALT RADIUS
APPROACH RETURN
EDGE OF WIDTH FT
ASPHALT (SEE TABI W CODER LAT,
DISTANCE FROM
STREET NAME RADIUS FT(RETURNSEE EE)
STREET WITH ASPHALT EDGE
Approach Requirements:
• Maximum 2 approaches per property frontage;one on arterials.
• Total width of approaches not to exceed 50%of frontage width.
Residential Approaches Commercial
Approaches
Distance from Curb/Radius Retum 15'minimum 75'minimum
Separation between Approaches(measured from centerline to centerline of See Page 7-27
each approach) None specified in City Street Standards
Throat Width(flat portion) 16'min.,30'max. 30'min.,40'max.
Wing Width(at curb line) 4 feet typical 4 feet typical
Minimum Distance from Side Property Line(@ r/w) 5.0' 5.0'
Minimum Distance from Crosswalk 5' 5'
DE-001:V-1 Page 2 of 2
SpÔ1 \hhhhhh1h1
Development Engineering
►Ail
\Ti11ey i 1 6 • Spokane ValleyWA 99206
11707E Sprague Ave Suite 0 ♦ p
509.921.1000 ♦ Fax: 509.921.1008 ♦ cityhall®spokanevalley.org
Design Deviation Request
Date: 4/4/16 Project: DeForge Approach Construction
Requestor:
Name(print): Signature:
Chip Mohr
Explanation of Issue:
Requesting additional access point(total of 3)for duplex lot
Standard or Guideline from which deviation is requested:
Maximum of 2 access points per lot
Deviation being requested:
3 access points
Justification and Engineering Design benefit:
Utilize existing drives and still provide more off street parking
Supporting Documents(attached)
Site Plan 411-704-
1� ZOl`- 0G4I
777_
Requestor not to write below.
Development Engineering Recommendation:
WApproved as submitted Comment(s):
❑ Approved with Changes
❑ Request Denied
-74V#IX-CW
Signed-Development Engineer(for project) Date
ilivAk.• �
ned-Senior Development ngineer D.
c
w