2010, 12-19 Permit App: 10004124 Residence Project Number: 10004124 Inv: 1 Application Date: 12/29/2010 Page 1 of 3
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: SFR W/ATT GAR Contact: LINDSAY CONSTRUCTION
Address: PO BOX 30792
C-S-Z: SPOKANE WA 99223
Setbacks:Front Left: Right: Rear: Phone: (509)879-3420
Group Name:
Site Information: Project Name:
Plat Key: Name: Range District: Sout
Parcel Number: 45271.3802 Block: Lot:
SiteAddress: 13717 E 22ND LN Owner:Name: BANK OF FAIRFIELD
Address: 201 W NORTH RIVER DR
Location::CSV SPOKANE,WA 99201-2262
Zoning: R-2 SF Res Suburban District
Water District: 010 VERA Hold: ❑
Area: 10,328 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review
Building Plan Review Released By:
Originally Released: 12/28/2010 By: BDBEBOU
Landuse/Zoning/HE Conditions Released By:
Originally Released: 12/22/2010 By: mharnois
Sewer Review Released By:
Permits: .
Operator: JD Printed By: JD Print Date: 12/29/2010
Project Number: 10004124 Inv: 1 Application Date: 12/29/2010 Page 2 of 3
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Building Permit
Contractor: LINDSEY CONSTRUCTION INC Firm: LINDSEY CONSTRUCTION INC
Address: PO BOX 30792 Phone: (509)879-3420
SPOKANE,WA 99223
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation
1&2 FAMILY R-3 VB 1,491 $147,534.45 1,491 $147,534.45
BASEMENT U R-3 VB 1,453 $21,795.00 1,453 $21,795.00
GAR WOOD U-1 VB 544 $10,336.00 544 $10,336.00
Totals: 3,488 $179,665.45 3,488 $179,665.45
Item Description Units Unit Desc Fee Amount
RESIDENTIAL PERMIT FEE 1 SELECT $1,441.75
WSBCC SURCHARGE 1 SELECT $4.50
SF PLNS RVW<7999 SQ FT 1 SELECT $576.70
Permit Total Fees: $2,022.95
Mechanical Permit
Contractor: A J HEATING&AIR Firm: A J HEATING&AIR CONDITIONI
Address: 1235 E 36TH AVE Phone: (509)838-6223
SPOKANE,WA 99203
Item Description Units Unit Desc Fee Amount
DUCT WORK SYSTEM 1 NUMBER OF $11.00
GAS WATER HEATER 1 NUMBER OF $11.00
GAS APPLIANCE<=100,000BTU 1 NUMBER OF $13.00
GAS PIPING 2 #OF UNITS $2.00
HEAT PUMP OR A/C 0-3 TONS 1 NUMBER OF $13.00
VENTILATING FANS 1 DUCT 4 NUMBER OF $44.00
Permit Total Fees: $94.00
Operator: JD Printed By: JD Print Date: 12/29/2010
Project Number: 10004124 Inv: 1 Application Date: 12/29/2010 Page 3 of 3
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Plumbing Permit
Contractor: END PLUMBING INC Firm: END PLUMBING INC
Address: 3309 N FOWLER RD Phone: (509)328-0261
SPOKANE WA 99206
Item Description Units Unit Desc Fee Amount
TOILETS/BIDETS 2 NUMBER OF $12.00
SINKS 3 NUMBER OF $18.00
SHOWERS 1 NUMBER OF $6.00
TUBS 1 NUMBER OF $6.00
DISH WASHERS 1 NUMBER OF $6.00
GARBAGE DISPOSAL 1 NUMBER OF $6.00
CLOTHES WASHER 1 NUMBER OF $6.00
MISCELLANEOUS FIXTURES 3 NUMBER OF $18.00
Permit Total Fees: $78.00
Notes:
Payment Summary• � � o s�v ,���_. „v , �, . w„ � ��w, � �� � �s ., w_ �
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $2,022.95 $2,022.95 $569.98 $1,452.97
Mechanical Permit $94.00 $94.00 $0.00 $94.00
Plumbing Permit $78.00 $78.00 $0.00 $78.00
$2,194.95 $2,194.95 $569.98 $1,624.97
Disclaimer:
Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information
contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: JD Print Date: 12/29/2010
' Community Development Department (Staff Use Only)
40111°9\SaTYY1a.
► Permit Center
il�r 11703 East Sprague Avenue, Suite B-3 PERMIT NUMBER:
Spokane Valley, WA 99206
Tel: (509) 688-0036 PERMIT FEE:
\Talley Fax: (509) 688-0037
.000permitcenter@spoka neva)lev.orq
RESIDENTIAL CONSTRUCTION PERMIT APPLICATION
a NEW CONS RUCTION ADDITIO OTHER REMODEL ACCESSORY BUILDING
0
El
SITE ADDRESS: 2 «"1 I1 C -V"
ASSESSORS PARCEL NO.: 45271.3802 LEGAL DESCRIPTION: SH 03-08 LT2BLK1
BUILDING OWNER NAME: LINDSEY CONSTRUCTION INC
NAME:
ADDRESS:
CITY: SPOKANE STATE: WA
PHONE:568-1013 FAX: 443-1013 e------QIP___a 2`23 '_"- - ______"+I
CE4L: $
LINDSEY CONSTRUCTION INC `
CONTACT NAME: €
loa, 1 ? <l
Ir I
PHONE: 568-1013 FAX 443-1013
CELL ?i;t. t 0,::41-2J--k____... {
CONTRACTOR NAME: LINDSEY CONSTRUCTION INC _ _. 1
MAILING ADDRESS: PO BOX 30792 ; ,` T,,r 'h _
CITY:
SPOKANE STATE: WA ZIP: 99223
PHONE: 568-1013 FAX: 443-1013 CELL:
CONTRACTOR LICENSE No.: LINDSC1066OW EXPIRES: CITY BUSINESS LICENSE NO.: LINDSC1 Q
DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE:
CONSTRUCTION OF ONE SINGLE FAMILY RESIDENCE WITH ATTACHED GARAGE
CONSTRUCTION OF ONE SINGLE FAMILY RESIDENCE WITH ATTACHED GARAGE
****YOU MUST COMPLETE THE FOLLOWING****
MARK N/A IF NOT APPLICABLE
Height to Peak:20 Dimensions:50X56 No. of Stories: 1 Total Habitable 2906
Space:
Main Floor SQ FT: Upper Floor SQ FT: Unfinished Basement SQ Finished Basement SQ
/411q IFT: 140J FT•145
Garage SQ FT: q- Deck/Covered Patio SQ Impervious Surface 30%Slopes on
`S `j �V T; Area: Property: NO
No. of Bedrooms:3 'Construction Type: Heat Source:HEAT PUMP Sewer or Septic:SEWER
TOTAL COST OF PROJECT: $ e 1 gODOD
DISCLAIMER
The permitted verifies,acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling,the dwelling is/will
be served by potable water. 2)Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may be required to be submitted and subsequently approved before this application can be processed.
Vit- 1 7 7— 1 d
Effective October 28,'2007 Page 1 of 2
P:\Community Development\02 Administration\03 Forms - Official Versions\Permit Center\Residential Construction Permit
App 10.28.07.doc
d/"'\ Permit Center
�r� 11703 E Sprague Ave,Suite B-3
sokane
Valley' Spokane Valley,WA 99206 PERMIT NUMBER:
.000 (509)688-0036 FAX:(509)688-0037 PERMIT FEE:
Community Development permitcenter(n,spokanevalley.org
Mechanical Permit Application? 7 El Commercial ❑■ Residential
SITE ADDRESS: 137) 7 C ZZn)
Building Owner
Name: Phone: Fax:
Address: City: State: Zip:
Contractor /j- 4, n�
Name: , t Phone: Fax:
Address: City: State: Zip:
License No: City Business Lic:
Contact/Project Manager:
Name: Phone:
#UNITS
FURNACES&SUSPENDED HEATERS-INSTALLATION OR RELOCATION Up to&including 100,000 BTU 1
FURNACES&SUSPENDED HEATERS-INSTALLATION OR RELOCATION Over 100,000 BTU
DUCT WORK SYSTEM 1
HEAT PUMP/AIR CONDITIONER 0-3 TON 1
AIR CONDITIONER Over 3-15 TON
AIR CONDITIONER Over 15-30 TON
AIR CONDITIONER Over 30-50 TON
AIR CONDITIONER Over 50 TON
GAS WATER HEATER 1
GAS PIPING SYSTEM(each outlet) 2
GAS LOG,FIREPLACE,&GAS INSERT
APPLIANCE VENTS INSTALLATION,RELOCATION,REPLACEMENT
REPAIRS OR ADDITIONS
BOILER,COMPRESSORS,ABSORPTIONS SYSTEM 0 to 3 hp-100,000 BTU or less
BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 3-15 hp-100,001 to 500,000 BTU
BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 15-30 hp -500,001 to 1,000,000 BTU
BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 30 hp-1,000,001 to 1,750,000 BTU
BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 50 hp-over 1,750,000 BTU
AIR HANDLER(DOES NOT include ducting) Each unit up to 10,000 cfm,including ducts
AIR HANDLER(DOES NOT include ducting) Each unit over 10,000 cfm
EVAPORATIVE COOLERS(other than portables)
VENTILATION AND EXHAUST Each fan connected to a singe duct 4
VENTILATION AND EXHAUST Each ventilation system
VENTILATION AND EXHAUST Each hood served by mechanical exhaust
INCINERATORS Installation or relocation of residential
INCINERATORS Installation or relocation of commercial
APPLIANCES Range,Clothes Washer
UNLISTED APPLIANCES Under 400,000 BTU
UNLISTED APPLIANCES Over 400,000 BTU
HOOD Type I
HOOD Type II
L P STORAGE TANK
WOOD OR PELLET STOVE INSERT
WOOD STOVE SYSTEM-FREE STANDING
EXPIRES: VIN:
❑CASH 0 CHECK ❑VISA ❑MC
CARD#: SIGNATURE
P:\Community Development\02 Administration\03 Forms-Official Versions\Permit Center\Mechanical Permit Application 04-03-09 dg.doc
Permit Center
11703 E Sprague Ave,Suite B-3 PERMIT NUMBER:
Spokane Valley,WA 99206
(509)688-0036 FAX:(509)688-0037 PERMIT FEE:
p ermitc entera sookanevallev.org
Community Development
Plumbing Permit Application ❑ Commercial ❑ Residential
SITE ADDRESS: 13717 E 22ND
Building Owner
Name: Phone: Fax:
Address: City: State: Zip:
Contractor m,/)1 n Gr
Name: D / Phone: Fax:
Address: City: State: Zip:
License No: City Business Lic:
Contact/Project Manager:
Name: Phone:
#OF UNITS
PLUMBING FIXTURE ON A TRAP
TOILETS 2
URINALS
TUBS 1
SHOWERS(per trap) 1
Lav/Basins,Bar,Floor,Kitchen,Laundry,Utility,Janitor,Photo,X-ray,Food,
SINKS Prep/Culinary Meat
DISHWASHER 1
CLOTHES WASHER 1
GARBAGE DISPOSAL 1
WATER SOFTNER
FLOOR DRAIN Area,Case,Coil,Trench,Condensate
ROOF DRAIN/OVERFLOW DRAINS
FOUNTAIN,DRINKING
WATER PIPING/DRAIN-IN WASTE Installation,Alterations,Repair,Reversals
WATER USING DEVICE Ice and/or Coffee maker,hose bib,steamer proofer,carbonator,swamp cooler 3
PRIVATE SEWAGE DISPOSAL SYSTEM
WATER HEATER If Gas,See Mechanical
INDUSTRIAL WASTE PRETREATEMENT
INCEPTORS Including traps,vents except kitchen type grease interceptors functioning as fixture traps
REPAIR OR ALTERATION Water piping,drainage or vent piping
ATMOSPHERIC TYPE VACUUM BREAKER
BACK FLOW PROTECTIVE DEVICE Other than atmospheric type vacuum breakers
MEDICAL GAS
INCEPTORS
OCASH 0 CHECK 0 VISA 0 MC EXPIRES:
Card# VIN:
SIGNATURE:
P:\Community Development\02 Administration\03 Forms-Official Versions\Permit Center\Plumbing Permit Application 04-03-09 dg.doc
Washington State Energy Code:Component Performance Worksheet,Type R-3 Occupancies
Project Information:
13717 E 22nd Lane
A home built for David Star
Heating System Size
Ducts are located in unconditioned space_____,
Conditioned Floor Area 2906 Equipment size over design load; 15o%j V
Conditioned Building Volume 23248 Btu/hour output 53,996
Weather Station Lspokane co KW 15.8
Component Performance,R-3 occupancies Code Target Values Proposed Design Values
Area UA Area UA
Vertical Glazing U= 0.300 436 130.8 190 66.5
Overhead Glazing U= 0.500 0 0.0 0 0.0
Doors U= 0.200 18 3.6 18 8.2
FlatNaulted Ceilings U= 0.027 1453 39.2 1453 49.0
Wall(above grade) U= 0.056 900 50.4 1146 65.3
Floors U= 0.029 0 0.0 0 0.0
Slab on Grade F= 0.360 0 0.0 0 0.0
Below Grade
2'depth,wall U= 0.042 0 0.0 0 0.0
2'depth,slab F= 0.590 0 0.0 0 0.0
3.5'depth,wall U= 0.041 0 0.0 0 0.0
3.5'depth, slab F= 0.640 0 0.0 0 0.0
7'depth,wall U=0.037 1344 49.7 1344 49.7
7'depth,slab F= 0.570 168 95.8 168 95.8
Target UA Total 369.5 Proposed UA Total 334.5
Target Credits from Chpt. 9 1.0 Proposed Credits from Chpt.9 0.0
If the Proposed UA 5 the Target UA,and the Proposed Credits From Chpt. 9 are z 1 than the home meets the 2009 WSEC.
Check other code requirements
Copyright 2010,WSUEEPIO-009(Version 10)Copied by permission from Washington State University Extension Energy Program. (see copyright restrictions)
12/22/2010 1 of 6
Washington State Energy Code:Component Performance Worksheet,Type R-3 Occupancies '
Vertical Glazing
Plan Component Glazing Width Height
ID Description Ref. U Qt. - Feet Inch Feet Inch Area UA
LR 2g1 Wood/vinyl,Low-el 1/2" V 10-6B 0.350 1 6 0 5 ° 30.0 10.5
BD 3 291 Wood/vinyl,Low-el' " V 10-6B 0.350 1 4 ° 4 ° 16.0 5.6
BD 2 291 Wood/vinyl,Low-el Y2" v 10-6B 0.350 1 4 ° 4 ° 16.0 5.6
DIN 291 Wood/vinyl,Low-el 1/" V 10-6B 0.350 1 6 ° 6 t0 41.0 14.4
KIT 291 Wood/vinyl,Low-el 1/2" v. 10-6B 0.350 1 _ 4 0 3 6 14.0 4.9
BD 1 291 Wood/vinyl,Low-el 1/2" V 10-6B 0.350 1 6 ° 5 ° 30.0 10.5
BTH 291 Wood/vinyl,Low-el 1/2" V 10-6B 0.350 2 1 ° 3 ° 6.0 2.1
BSM- 291 Wood/vinyl,Low-el 1/2" V 10-6B 0.350 2 4 0 4 ° 32.0 11.2
LR 291 Wood/vinyl,Low-el vz' V 10-6B 0.350 1 1 ° 5 ° 5.0 1.8
• 0 0.000 0.0 0.0
0 0.000 0.0 0.0
v 0 0.000 0.0 0.0
V 0 0.000 0.0 0.0
V 0 0.000 0.0 0.0
V 0 0.000 0.0 0.0
I- . 0 0.000 0.0 0.0
v 0 0.000 0.0 0.0
V 0 0.000 0.0 0.0
V 0 0.000 0.0 0.0
V0 0.000 0.0 0.0
V 0 0.000 0.0 0.0
V 0 0.000 0.0 0.0
V 0 0.000 0.0 0.0
V ' 0 0.000 0.0 0.0
_ 0 0.000 0.0 0.0
V ' 0 0.000 0.0 0.0
V 0 0.000 0.0 0.0
V 0 0.000 0.0 0.0
V 0 0.000 0.0 0.0
V 0 0.000 0.0 0.0
V 0 0.000 0.0 0.0
• 0 0.000 0.0 0.0
V 0 0.000 0.0 0.0
V 0 0.000 0.0 0.0
V 0 0.000 0.0 0.0
V 0 0.000 0.0 0.0
• 0 0.000 0.0 0.0
V 0 0.000 0.0 0.0
• v 0 0.000 0.0 0.0
V 0 0.000 0.0 0.0
0 0.000 0.0 0.0
iv 0 0.000 0.0 0.0
V 0 0.000 0.0 0.0
r-
V 0 0.000 _ 0.0 0.0
V 0 0.000 0.0 0.0
Copyright 2010,WSUEEP10-009(Version 10)Copied by permission from Washington State University Extension Energy Program. (see copyright restrictions)
12/22/2010 2 of 6
Washington State Energy Code:Component Performance Worksheet,Type R-3 Occupancies
--- - 0 0.000 0.0 0.0
------------- -- - -- v 0 0.000 0.0 0.0
v 0 0.000 0.0 0.0
V 0 0.000 0.0 0.0
V 0 0.000 0.0 0.0
v 0 0.000 0.0 0.0
-------- --- ---- - 0 0.000 0.0 0.0
Sum of Area and UA 190.0 66.5
Glazing Area Weighted U 0.350
Exterior Doors
Plan Component Door Width Height
ID Description Ref. U Qt. Feet Inch Feet inch Area UA
1 Exempt Door if less than 24 SF #NIA NA 1 3 ° 6 8 20.0
Wood slab in wood frame(WoodSWF) lir 10-6C 0.460 1 _ 2 8 6 8 17.8 8.2
-- 0 0.000 0.0 0.0
-- - 0 0.000 0.0 0.0
V 0 0.000 0.0 0.0
V 0 0.000 0.0 0.0
V 0 0.000 _
0.0 0.0
- - - - V 0 0.000 0.0 0.0
- - - DIIIII 0 0.000 0.0 0.0
- -- - v 0 0.000 0.0 0.0
-- -= 0 0.000 0.0 0.0
If exempt door is selected, must be s 24 SF.
Sum of Area and UA 17.8 8.2
Copyright 2010,WSUEEP10-009(Version 10)Copied by permission from Washington State University Extension Energy Program. (see copy 2htt r01sOtricti3 of 6
Washington State Energy Code:Component Performance Worksheet,Type R-3 Occupancies
Overhead Glazing:
Plan Component Glazing Width Height
ID - Description Ref. U Qt. Feet Inth Feet Inch Area UA
--- • 0 0.000 0.0 0.0
-- — • 0 0.000 0.0 0.0
---- • 0 0.000 0.0 0.0
• 0 0.000 0.0 0.0
•. 0 0.000 0.0 0.0
- — • 0 0.000 0.0 0.0
• 0 0.000 0.0 0.0
Sum of Area and UA 0.0 0.0
FlatNaulted Ceilings
Plan Component Attic
ID Descripon Ref. U Area UA
R38 blown Attic STD baffled • 10-7 0.031 1015.0 31.5
R38 blown Scissor 4:12 STD baffled • 10-7 0.040 438.0 17.5
• 0 0.000 0.0
• 0 0.000 0.0
Sum of Area and UA 1453.0 49.0
Copyright 2010,WSUEEPI0-009(Version 10)Copied by permission from Washington State University Extension Energy Program. (see copyright restrictions)
12/22/2010 4 of 6
Washington State Energy Code:Component Performance Worksheet,Type R-3 Occupancies
Walls(Above Grade)
Plan Component Wall
ID _ Description -_ Ref. U Net Area UA
R21 cavity+RO foam STD 2X6W Lap V 10-5 0.057 1146.0 65.3
0 0.000 0.0
— — 0 0.000 0.0
- 0 0.000 0.0
0 0.000 0.0
0 0.000 0.0
-- --- ---- � 0 0.000 0.0
- 0 0.000 0.0
0 0.000 0.0
- 0 0.000 0.0
0 0.000 0.0
0 0.000 0.0
-- -- ------—--- - 0 0.000 0.0
Sum of Net Wall Area and UA 1146.0 65.3
Floor(over crawl or exterior)
Plan Component Floor
ID Description -- Ref. U Area UA
0 0.000 0.0
0 0.000 0.0
0 0.000 0.0
0 0.000 0.0
Sum of Area and UA 0.0 0.0
Slab on Grade(less than 2 feet below grade)
Plan Component Slab Slab
ID _ Description _ Ref. F Length UA
0 0.000 0.0
- -- - - ---- --- � 0 0.000 0.0
0 0.000 0.0
0 0.000 0.0
Sum of Area and UA 0.0 0.0
Copyright 2010,WSUEEP10-009(Version 10)Copied by permission from Washington State University Extension Energy Program. (see copyright restrictions)
12/22/2010 5 of 6
Washington State Energy Code:Component Performance Worksheet,Type R-3 Occupancies '
Below Grade Wall:2 foot depth
Plan Component Wall Wall Wall Slab Slab Slab
ID Description Ref. U Area UA F Length UA
r-
V 0 0.000 0.0 0.000 0.0
v 0 0.000 0.0 0.000 0.0
--- - v 0 0.000 0.0 0.000 0.0
v 0 0.000 0.0 0.000 0.0
Sum of Area, Length and UA 0.0 0.0 0.0 0.0
Below Grade Wall:3.5 foot depth
Plan Component Wall Wall Wall Slab Slab Slab
ID Description Ref. U Area UA F Length UA
v 0 0.000 0.0 0.000 0.0
V 0 0.000 0.0 0.000 0.0
V 0 0.000 0.0 0.000 0.0
V 0 0.000 0.0 0.000 0.0
Sum of Area,Length and UA 0.0 0.0 0.0 0.0
Below Grade Wall:7 foot depth
Plan Component Wall Wall Wall Slab Slab Slab
ID Description__ Ref. U Area UA F Length UA
R19 Batt 7'depth V 10-1 0.037 1344.0 49.7 0.570 168.0 95.8
V 0 0.000 0.0 0.000 0.0
- - v 0 0.000 0.0 0.000 0.0
v 0 0.000 0.0 0.000 0.0
Sum of Area, Length and UA 1344.0 49.7 168.0 95.8
Chapter 9 Options Total of 1 Credit.Required
Opt. Opt. Description
la High Efficiency HVAC Equipment 1 ❑
lb High Efficiency HVAC Equipment 2 - - ❑
1c High Efficiency HVAC Equipment 3 ❑
2 High Efficiency HVAC Distribution System ❑
3a Efficient Building Envelope 1 ❑
3b Efficient Building Envelope 2 ❑
3c Super-Efficient Building Envelope 3 ❑
4a Air Leakage Control and Efficient Ventilation ❑
• 4b Additional Air Leakage Control and Efficient Ventilation ❑
5a Efficient Water Heating ❑
5b High Effieciency Water Heating ❑
6 Small Dwelling Unit ❑
7 Large Dwelling Unit ❑
8 Renewable Electric Energy ❑ *1200 kwh
Total Credits 0.00
Copyright 2010,WSUEEP10-009(Version 10)Copied by permission from Washington State University Extension Energy Program. (see copyright restrictions)
12/22/2010 6 of 6
Washington State Energy Code:Component Performance Worksheet,Type R-3 Occupancies
Project Information:
13717 E 22nd Lane
A home built for David Star
Heating System Size
Ducts are located in unconditioned space
Conditioned Floor Area 2906 Equipment size over design load; 150% •
Conditioned Building Volume 23248 Btu/hour output 53,996
Weather Station j Spokane Co KW 15.8
Component Performance,R-3 occupancies Code Target Values Proposed Design Values
Area UA Area UA
Vertical Glazing U= 0.300 436 130.8 190 66.5
Overhead Glazing U= 0.500 0 0.0 0 0.0
Doors U= 0.200 18 3.6 18 8.2
Flat/Vaulted Ceilings U= 0.027 1453 39.2 1453 49.0
Wall(above grade) U= 0.056 900 50.4 1146 65.3
Floors U= 0.029 0 0.0 0 0.0
Slab on Grade F= 0.360 0 0.0 0 0.0
Below Grade
2'depth,wall U= 0.042 0 0.0 0 0.0
2'depth, slab F= 0.590 0 0.0 0 0.0
3.5'depth,wall U= 0.041 0 0.0 0 0.0
3.5'depth, slab F= 0.640 0 0.0 0 0.0
7'depth,wall U=0.037 1344 49.7 1344 49.7
7'depth,slab F= 0.570 168 95.8 168 95.8
Target UA Total 369.5 Proposed UA Total 334.5
Target Credits from Chpt.9 1.0 Proposed Credits from Chpt.9 0.0
If the Proposed UA s the Target UA, and the Proposed Credits From Chpt.9 are z 1 than the home meets the 2009 WSEC.
Check other code requirements
Copyright 2010,WSUEEP10-009(Version 10)Copied by permission from Washington State University Extension Energy Program. (see copyr 2h2010ricti;s )6
Washington State Energy Code:Component Performance Worksheet,Type R-3 Occupancies
Vertical Glazing
Plan Component Glazing Width Height
ID _ _Description _ Ref. U Qt. Feet InInch
Feet '"ch Area UA
LR 291 Wood/vinyl,Low-el 1/2" v 10-6B 0.350 1 6 ° 5 ° 30.0 10.5
BD 3 2g1 Wood/vinyl,Low-el 1/2" V 10-6B 0.350 1 4 0 4 ° 16.0 5.6
BD 2 2g1 Wood/vinyl,Low-el 1/2" v 10-6B 0.350 1 4 ° 4 ° 16.0 5.6
DIN 291 Wood/vinyl,Low-el 1/2" V 10-66 0.350 1 6 ° 6 t0 41.0 14.4
KIT 291 Wood/vinyl,Low-el 1/2" V, 10-6B 0.350 1 4 0 3 6 14.0 4.9
BD 1 2g1 Wood/vinyl,Low-el 1/2" • 10-6B 0.350 1 6 ° 5 ° 30.0 10.5
BTH 2g1 Wood/vinyl,Low-el 1/2" V 10.68 0.350 2 1 ° 3 0 6.0 2.1
BSM' 291 Wood/vinyl,Low-el 1/2" V 10-6B 0.350 2 4 ° 4 ° 32.0 11.2
LR 2g1 Wood/vinyl,Low-el 1/2" V 10-68 0.350 1 1 0 5 ° 5.0 1.8
V 0 0.000 0.0 0.0
V 0 0.000 0.0, 0.0
V 0 0.000 0.0 0.0
v 0 0.000 0.0 0.0
------- ----_---- ---------- - v 0 0.000 0.0 0.0
El- - 0 0.000 0.0 0.0
V 0 0.000 0.0 0.0
V 0 0.000 0.0 0.0
v 0 0.000 0.0 0.0
V 0 0.000 0.0 0.0
0 0.000 0.0 0.0
V 0 0.000 0.0 0.0
V 0 0.000 0.0 0.0
V 0 0.000 0.0 0.0
V 0 0.000 0.0 0.0
V 0 0.000 0.0 0.0
V 0 0.000 0.0 0.0
V 0 0.000 0.0 0.0
--------- -----------------------------
v 0 0.000 0.0 0.0
-- 0 0 0.000 0.0 0.0
__- - 8 0 0.000 0.0 0.0
0 0.000 0.0 0.0
0 0 0.000 0.0 0.0
0 0.000 0.0 0.0
0 0.000 0.0 0.0
- - _ 0 0 0.000 0.0 0.0
0 0 0.000 0.0 0.0
0 0 0.000 0.0 0.0
0 0.000 0.0 0.0
• 0 0.000 0.0 0.0
- - - 0 0.000 0.0 0.0
I
0 0.000 0.0 0.0
V 0 0.000 0.0 0.0
V 0 0.000 0.0 0.0
0 0.000 0.0 0.0
0 0.000 0.0 0.0
Copyright 2010,WSUEEP10-009(Version 10)Copied by permission from Washington State University Extension Energy Program. (see copyright restrictions)
12/22/2010 2 of 6
Washington State Energy Code:Component Performance Worksheet,Type R-3 Occupancies
- - 0 0.000 0.0 0.0
----------- ----- - v 0 0.000 0.0 0.0
_ v 0 0.000 0.0 0.0
- - V 0 0.000 0.0 0.0
v 0 0.000 0.0 0.0
-- - 0 0.000 0.0 0.0
------- --- - - - 0 0.000 0.0 0.0
Sum of Area and UA 190.0 66.5
Glazing Area Weighted U 0.350
Exterior Doors
Plan Component Door Width Height
ID Description Ref. U Qt. Feet Inch Feet inch Area UA
1 Exempt Door if less than 24 SF #NIA NA 1 3 ° 6 8 20.0
Wood slab in wood frame(WoodSWF) I 10-6C 0.460 1 2 B 6 8 17.8 8.2
v 0 0.000 0.0 0.0
--------------- v 0 0.000
- v 0 0.000 0.0 0.0
- - - - -
v 0 0.000 0.0 0.0
v 0 0.000 - 0.0 0.0
- 0 0.000 0.0 0.0
- - -- v i 0 0.000 0.0 0.0
-- - 0 0.000 0.0 0.0
-- ----- - -- -- ---_ 0 0.000 0.0 0.0
If exempt door is selected, must be<_24 SF.
Sum of Area and UA 17.8 8.2
Copyright 2010,WSUEEP10-009(Version 10)Copied by permission from Washington State University Extension Energy Program. (see copy 2ht res rictio of 6
Washington State Energy Code:Component Performance Worksheet,Type R-3 Occupancies
Overhead Glazing:
Plan Component Glazing Width Height
ID Description Ref. U Qt Feet inch Feet inch Area UA
0 0.000 0.0 0.0
-- — —— — v 0 0.000 0.0 0.0
-- -- v ' 0 0.000 0.0 0.0
V 0 0.000 0.0 0.0
V 0 0.000 0.0 0.0
V 0 0.000 0.0 0.0
v 0 0.000 0.0 0.0
Sum of Area and UA 0.0 0.0
Flat/Vaulted Ceilings
Plan Component Attic
ID Description Ref. U Area UA
R38 blown Attic STD baffled v 10-7 0.031 1015.0 31.5
R38 blown Scissor 4:12 STD baffled v 10-7 0.040 438.0 17.5
V 0 0.000 0.0
v 0 0.000 0.0
Sum of Area and UA 1453.0 49.0
Copyright 2010,WSUEEP10-009(Version 10)Copied by permission from Washington State University Extension Energy Program. (see copyright restrictions)
12/22/2010 4 of 6
Washingtofn State energy Code:Component Performance Worksheet,Type R-3 Occupancies
Walls(Above Grade)
Plan Component Wall
ID _ Description -- Ref. U Net Area UA
P21 cavity+RO foam STD 2X6W Lap 8 10-5 0.057 1146.0 65.3
0 0.000 0.0
0 0.000 0.0
0 0.000 0.0
0 0.000 0.0
0 0.000 0.0
------- - -- _ v 0 0.000 . 0.0
- 0 0.000 0.0
------_- -- ---- - v 0 0.000 0.0
v 0 0.000 0.0
Iv 0 0.000 0.0
— -- — 0 0.000 0.0
--- ------- -- v ' 0 0.000 0.0
Sum of Net Wall Area and UA 1146.0 65.3
Floor(over crawl or exterior)
Plan Component Floor
ID Description Ref. U Area UA
v 0 0.000 0.0
v 0 0.000 0.0
----- --- -- -- - v 0 0.000 0.0
v 0 0.000 0.0
Sum of Area and UA 0.0 0.0
Slab on Grade(less than 2 feet below grade)
Plan Component Slab Slab
ID Description Ref. F Length UA
' 0 0.000 0.0
— --- - ------- v 0 0.000 0.0
-- -- --------- v 0 0.000 0.0
V 0 0.000 0.0
—
Sum of Area and UA 0.0 0.0
Copyright 2010,WSUEEPIO-009(Version 10)Copied by permission from Washington State University Extension Energy Program. (see copyright restrictions)
12/22/2010 5of6
Washington State Energy Code:Component Performance Worksheet,Type R-3 Occupancies
Below Grade Wall:2 foot depth
Plan Component Wall Wall Wall Slab Slab Slab
ID Description Ref. U Area UA F Length UA
V 0 0.000 0.0 0.000 0.0
v 0 0.000 0.0 0.000 0.0
V 0 0.000 0.0 0.000 0.0
V 0 0.000 0.0 0.000 0.0
Sum of Area, Length and UA 0.0 0.0 0.0 0.0
Below Grade Wall:3.5 foot depth
Plan Component Wall Wall Wall Slab Slab Slab
ID Description Ref. U Area UA F Length UA
V 0 0.000 0.0 0.000 0.0
v 0 0.000 0.0 0.000 0.0
v 0 0.000 0.0 0.000 0.0
v 0 0.000 0.0 0.000 0.0
Sum of Area,Length and UA 0.0 0.0 0.0 0.0
Below Grade Wall:7 foot depth
Plan Component Wall Wall Wall Slab Slab Slab
ID Description Ref. U Area UA F Length UA
R19 Batt 7'depth v 10-1 0.037 1344.0 49.7 0.570 168.0 95.8
- - V 0 0.000 0.0 0.000 0.0
- - V 0 0.000 0.0 0.000 0.0
v 0 0.000 0.0 0.000 0.0
Sum of Area, Length and UA 1344.0 49.7 168.0 95.8
Chapter 9 Options Total of 1 Credit.Required
Opt. Opt.Description
1a High Efficiency HVAC Equipment 1 ❑
lb High Efficiency HVAC Equipment 2 ❑
1c High Efficiency HVAC Equipment 3 ❑
2 High Efficiency HVAC Distribution System ❑
3a Efficient Building Envelope 1 ❑
3b Efficient Building Envelope 2 ❑
3c Super-Efficient Building Envelope 3 ❑
4a Air Leakage Control and Efficient Ventilation ❑
• 4b Additional Air Leakage Control and Efficient Ventilation ❑
5a Efficient Water Heating ❑
5b High Effieciency Water Heating ❑
6 Small Dwelling Unit ❑
7 Large Dwelling Unit ❑
8 Renewable Electric Energy ❑ *1200 kwh
Total Credits 0.00
Copyright 2010,WSUEEP10-009(Version 10)Copied by permission from Washington State University Extension Energy Program. (see copyright restrictions)
12/22/2010 6 of 6
Troposed cPlot Plan
. 13717E 22nd Lane
Legal Sgt.03-08 Lot 2, Bfock1
Spokane valley, Spol gne County, Washington
cParce(Num6er 45271.3802
cu6CIc Sewer I Tu6Cu Water I Sea&1:20
ir.
N
r4,7.5
(el
die,LP A.
50 )
0
w
A to
N
2S
0
a
r-
(4
\:\s„.................,
N < 11.
cs,
,-- rkEO 6 7.50
11
EEC 2 " 1 t
r,,E, _:,__ — r" """,G DEPT. APPRO Eta
! _N.i-r,-,_ _ _ _ V__ - -
eft_ _ -- --r Nd 1-rd 17//Ct,'/(/ 1
/ -/ //e0
D, IL.
For City Use Only
Siç
TY OF PLUS Project Number
eProject Address
400.
a e °
y 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
509.688.0036 • Fax: 509.688.0037 • permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re-submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date,please feel free to contact us if.you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure,you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred
submittal.This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone,fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re-
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE-APPLICANT PINK-BUILDING FILE REV 9/07