Loading...
2012, 04-19 Permit: SW-12001163 Sewer 04/19/2012 15:04 FAX 4777198 SPOKANE CO BLDG. 10001 SPOKANE COUNTY BUILDING AND PLANNING ■ PERMIT Permit Issued Date: Application Number: SW-12001163 04/19/2012 Expiration Date: Project Description: SEWER CONNECTION Primary Contact: NADYUK,PAVEL&LIUBA Applicant: NADYUK,PAVEL&LIUBA Permit Type: SEWER Address: 5814 W RIDGECREST DR SPOKANE,WA 99208 Phone: Email: SITE INFORMATION: Site Address: 13727E 22ND LN Owner: NADYUK, PAVEL&LIUBA Parcel Number: 45271.380.S Address: 5814 W RIDGECREST DR SPOKANE,WA 99208 Subdivision: SP-811-92 Phone: Assessor's Description: (CITY OF SPOKANE VALLEY) SHP 03-08 LT 3 Email: BLK 1 (AUDITORS#5824895 BK 25 PG 73 THRU 75)BEING A PTN OF SP 92-811 LYG WITHIN SE1/4 OF NE1/4 27-25-44 Inspection Area: Water District:Vera Fire District: Fire District 1 Irrigation District#15 Zoning: Land Area:0.2364 acres/10298 sqft CONTRACTOR INFORMATION: -- Owner Acting As Builder RECEIVED OWNER CSI'PER I I CENTER OWNER . NOT KNOWN AT TIME OF ENTRY • APR 2012 UNKNOWN, UK 00000 (ProJcct& Iid_I . 3?' i II Name_JAI. e- uvmit: i ri; I --- --- .. 1116. DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing-Utilities $25.94 Utilities Permit $125.00 Total Fee: $150.94 CONDITIONS: Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOL DIG--AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REDUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed:04/19/2012 14:56:22 Printed by: IIS APPPOOLWSP.NET v4.0 Received Time Apr, 19. 2012 2:42PM No. 7276 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW-12001163 04/19/2012 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. _ SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. _ THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. _ Date Printed:04/19/2012 14:56:22 Printed by:IIS APPPOOL\ASP.NET v4.0