Loading...
2009, 11-20 Permit App: 09003707 Residence Project Number: 09003707 Inv: I Application Date: 11/20/2009 Page 1 of 3 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Inf r o matron: Permit Use: SFR W/ATT GAR Contact: LINDSEY CONST Address: PO BOX 30792 C-S-Z: SPOKANE,WA 99223 Setbacks:Front Left: Right: Rear: Phone: (509)568-1013 Group Name: Site Information Project Name: : ,. ... - ',T,�-.._ ""'"5 45. .i.., R '°X"..:.-.. iH^.a'' .. .';45,E-..:.. _.,. E,. ., .45M,::, Plat Key: Name: Range District: Sout Parcel Number: 45271.3807 Block: Lot: SiteAddress: 13806 E 22ND LN Owner:Name: LINDSEY CONST Address: PO BOX 30792 Location::CSV SPOKANE,WA 99223 Zoning: R-2 SF Res Suburban District Water District: 010 VERA Hold: 1-1 Area: .00 Acres Width: 0 Depth: 0 Right Of Way(ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: ,. ,,3 .. r .. Review Building Plan Review Released By: Originally Released: 11/19/2009 By: tmelbourn Landuse/Zoning/HE Conditions Released By: Approved with the condition to hardpave the driveway Originally Released: 11/19/2009 By: lbarlow Sewer Review Released By: Originally Released: 11/20/2009 By: JLMain Operator: JD Printed By: jmm Print Date: 11/20/2009 Project Number: 09003707 Inv: I Application Date: 11/20/2009 Page 2 of 3 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Building Permit Contractor: LINDSEY CONSTRUCTION INC Firm: LINDSEY CONSTRUCTION INC Address: PO BOX 30792 Phone: (509)879-3420 SPOKANE,WA 99223 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation 1&2 FAMILY R-3 VB 1,149 $111,257.67 1,149 $111,257.67 2ND FLOOR R-3 VB 478 $35,697.04 478 $35,697.04 BASEMENT U R-3 VB 1,139 $17,085.00 1,139 $17,085.00 COV DECK R-3 VB 133 $1,995.00 133 $1,995.00 GARAGE U-1 VB 664 $12,616.00 664 $12,616.00 Totals: 3,563 $178,650.71 3,563 $178,650.71 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $1,436.15 WSBCC SURCHARGE 1 SELECT $4.50 SF PLNS RVW<7999 SQ FT 1 SELECT $574.46 Permit Total Fees: $2,015.11 Mechanical Permit Contractor: A J HEATING&AIR Firm: A J HEATING&AIR CONDITIONI Address: 1235 E 36TH AVE Phone: (509)838-6223 SPOKANE,WA 99203 Item Description Units Unit Desc Fee Amount GAS APPLIANCE<=100,000BTU 1 NUMBER OF $13.00 GAS PIPING 1 #OF UNITS $1.00 HEAT PUMP OR A/C 0-3 TONS 1 NUMBER OF $13.00 VENTILATING FANS 1 DUCT 5 NUMBER OF $55.00 GAS LOG OR GAS INSERT 1 NUMBER OF $11.00 Permit Total Fees: $93.00 Operator: JD Printed By: jinni Print Date: 11/20/2009 Project Number: 09003707 Inv: I Application Date: 11/20/2009 Page 3 of 3 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Plumbing Permit Contractor: END PLUMBING INC Firm: END PLUMBING INC Address: 12503 E 4TH Phone: (509)981-4407 SPOKANE WA 99216 Item Description Units Unit Desc Fee Amount TOILETS/BIDETS 4 NUMBER OF $24.00 SINKS 6 NUMBER OF $36.00 SHOWERS 2 NUMBER OF $12.00 TUBS 2 NUMBER OF $12.00 DISH WASHERS 1 NUMBER OF $6.00 GARBAGE DISPOSAL 1 NUMBER OF $6.00 CLOTHES WASHER 1 NUMBER OF $6.00 MISCELLANEOUS FIXTURES 3 NUMBER OF $18.00 Permit Total Fees: $120.00 The driveway shall be hardpaved from the right of way up to the garage. The hardpaved area shall minimally cover the areas that are intended to be driven on to access the garage,and shall be not less than 20'X 30'area indicated on the site plan. A 10'wide utility easment and a 10'wide drainage easement lie adjacent to the front property line. Due to the easements no construction may occur within 20'of the front property line.This is informational only. Payment Summary: , , . ._._, a_.. m,r. ,, AsnAU M.sew„ Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $2,015.11 $2,015.11 $567.74 $1,447.37 Mechanical Permit $93.00 $93.00 $0.00 $93.00 Plumbing Permit $120.00 $120.00 $0.00 $120.00 $2,228.11 $2,228.11 $567.74 $1,660.37 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: jmm Print Date: 11/20/2009 Sc�TY c (Staff Use Only) pokane PERMIT NUMBER: I O� lley PERMIT FEE: CITY OF SPOKANE VALLEY Community Development Department CSV Permit Center r. ,n 11703 East Sprague Avenue, Suite B-3 NO r_�'4 2CC3 Spokane Valley, WA 99206 Project# ctAN3 1071 Tel: (509) 688-0036 Fax: (509) 688-0037 Name--- _ �ermitcenter@spokanevalley.org Submittal# _------- RESIDENTIAL CONSTRUCTION PERMIT APPLICATION 12- NEW CONSTRUCTION 0 ADDITION/REMODEL 0 ACCESSORY BUILDING DECK 0 OTHER SITE ADDRESS: 8Q6 a 22' AO ASSESSORS PARCEL NO.:45271.9051 LEGAL DESCRIPTION:L4 B2 SHP-03-08 BUILDING OWNER NAME:LINDSEYCONSTRUCTION INC NAME:LINDSEY CONSTRUCTION INC ADDRESS:PO BOX 30792 CITv:SPOKAN E STATE:WA ZIP:99223 PHONE:509-568-1013 FAx:509-443-1013 CELL: CONTACT NAME:PAM MCKAY PHONE:509-218-8953 FAx:509-443-1013 CELL: CONTRACTOR NAME:LINDSEY CONSTRUCTION INC MAILING ADDRESS:PO BOX 30792 CITY:SPOKANE STATE:WA Zip:99223 PHONE:509-568-1013 FAx:509-443-1013 CELL: CONTRACTOR LICENSE No.:LINDSCI066OW EXPIRES:9/4/11 CITY BUSINESS LICENSE NO.. DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE: CONSTRUCTION OF ONE SINGLE FAMILY RESIDENCE WITH ATTACHED GARAGE PROPOSED USE: RESIDENCE Effective October 28, 2007 Page 1 of 2 http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/Residential Construction Permit App.1.doc �- 3 74-7 • ****YOU MUST COMPLETE THE FOLLOWING**** MARK N/A IF NOT APPLICABLE Height to Peak:25 Dimensions:55X46 No. of Stories:2 Total Habitable Space:?,762' Z7 G Main Floor SQ Upper Floor SQ Unfinished Basement Finished Basement FT:11.93" ( 1 9 FT:.46O1 1+7 K SQ FT:1 5'6 11 .3 7 SQ FT: Garage SQ FT80 Deck/ vered Pati Impervious Surface 30% Slopes on 6.4 if SQ FT: /33 Area:2757 Property:0 No. of Bedrooms:3 Construc Heat Source:NAT GAS Sewer or Type:FRAME Septic:SEWER TOTAL COST OF PROJECT: $,j irr7/ l 6 OZi DISCLAIMER The permitted verifies,acknowledges and agrees by their signature that: 1)if this permit is for construction or on a dwelling,the dwelling is/will be served by potable water. 2)Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be ubmitted and subsequently approved before this application can be processed. Signature Date: Method of payment: 0 Cash ❑ Check 0 Visa 0 Mastercard Bankcard #: EXP: VIN#: Authorized Signature: Effective October 28, 2007 Page 2 of 2 http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/Residential Construction Permit App.1.doc Permit Center WY 01. 110.111.1.e\ E Sprague Ave,Suite B-3 Valley' Spokane Valley,WA 99206 PERMIT NUMBER: 400011! Val ' (509)688-0036 FAX:(509)688-0037 Community Development permitcenter@spokancvallev.org PERMIT FEE: Mechanical Permit Application ❑ Commercial n Residential SITE ADDRESS: /� b e-22-116) Building Owner Name:LINDSEY CONSTRUCTION INC Phone:509-568-1013 Fax:509-443-1013 Address:PO BOX 30792 City:SPOKANE State:WA Zip:99223 Contractor Name:AJ HEATING AND AIR CONDITIONING Phone:838-6223 Fax:838-6223 Address: 1322 S PARK AVE City:SPOKANE VALLEY State:WA Zip:99212 License No:AJHEAACO55NB City Business Lic: Contact/Project Manager; Name:PAM MCKAY Phone:509-218-8953 #UNITS FURNACES&SUSPENDED HEATERS-INSTALLATION OR RELOCATION Up to&including 100,000 BTU 1 FURNACES&SUSPENDED HEATERS-INSTALLATION OR RELOCATION Over 100,000 BTU DUCT WORK SYSTEM HEAT PUMP/AIR CONDITIONER 0-3 TON 1 AIR CONDITIONER Over 3-15 TON AIR CONDITIONER Over 15-30 TON AIR CONDITIONER Over 30-50 TON AIR CONDITIONER Over 50 TON GAS WATER HEATER GAS PIPING SYSTEM(each outlet) 1 GAS LOG,FIREPLACE,&GAS INSERT 1 APPLIANCE VENTS INSTALLATION,RELOCATION,REPLACEMENT REPAIRS OR ADDITIONS BOILER,COMPRESSORS,ABSORPTIONS SYSTEM 0 to 3 hp-100,000 BTU or less BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 3-15 hp—100,001 to 500,000 BTU BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 15—30 hp -500,001 to 1,000,000 BTU BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 30 hp—1,000,001 to 1,750,000 BTU BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 50 hp—over 1,750,000 BTU AIR HANDLER(DOES NOT include ducting) Each unit up to 10,000 cfm,including ducts AIR HANDLER(DOES NOT include ducting) Each unit over 10,000 cfm EVAPORATIVE COOLERS(other than portables) VENTILATION AND EXHAUST Each fan connected to a singe duct 5 VENTILATION AND EXHAUST Each ventilation system VENTILATION AND EXHAUST Each hood served by mechanical exhaust INCINERATORS Installation or relocation of residential INCINERATORS Installation or relocation of commercial APPLIANCES Range,Clothes Washer UNLISTED APPLIANCES Under 400,000 BTU UNLISTED APPLIANCES Over 400,000 BTU HOOD Type I HOOD Type II L P STORAGE TANK WOOD OR PELLET STOVE INSERT WOOD STOVE SYSTEM—FREE STANDING ¢ j ['CASH ❑CHECK ❑VISA ❑MC Pi j 7� l ES: _ VIN: CARD it. CSV PERMIT CP�I6URE INOV 1 8 200q Proj act# `j C 7 N;_tme _ Submittal#___i http://www.spokanevalley.org/uploads/Community_Developmen acnnreii'r.. ••.1: ' u'r14 echanicalPermitApplication040309.doc Permit Center rr"* 11703 E Sprague Ave,Suite B-3 PERMIT NUMBER: Spokane Valley,WA 99206 410 Val 1ey, (509)688-0036 FAX:(509)688-0037 PERMIT FEE: Perm tcenteniespokanevalley,org Community Development Plumbing Permit Application n Commercial R1 Residential SITE ADDRESS: —/ /8-d Y 5 2Z/2i3 Building Owner Name:LINDSEY CONSTRUCTION INC Phone:509-568-1013 Fax:509-443-1013 Address:PO BOX 30792 City:SPOKANE State:WASHINGTON Zip:99223 Contractor Name:END PLUMBING Phone:509-981-4407 Fax: Address: City:MILLWOOD State:WA Zip:99206 License No: City Business Lic: Contact/Project Manager: Name:PAM MCKAY Phone:509-218-8953 #OF UNITS PLUMBING FIXTURE ON A TRAP TOILETS 4 URINALS TUBS 2 SHOWERS(per trap) 2 Lav/Basins,Bar,Floor,Kitchen,Laundry,Utility,Janitor,Photo,X-ray,Food, SINKS Prep/Culinary Meat 6 DISHWASHER 1 CLOTHES WASHER 1 GARBAGE DISPOSAL 1 WATER SOFTNER FLOOR DRAIN Area,Case,Coil,Trench,Condensate ROOF DRAIN/OVERFLOW DRAINS FOUNTAIN,DRINKING WATER PIPING/DRAIN-IN WASTE Installation,Alterations,Repair,Reversals WATER USING DEVICE Ice and/or Coffee maker,hose bib,steamer proofer,carbonator,swamp cooler 3 PRIVATE SEWAGE DISPOSAL SYSTEM WATER HEATER If Gas,See Mechanical INDUSTRIAL WASTE PRETREATEMENT INCEPTORS Including traps,vents except kitchen type grease interceptors functioning as fixture traps REPAIR OR ALTERATION Water piping,drainage or vent piping ATMOSPHERIC TYPE VACUUM BREAKER BACK FLOW PROTECTIVE DEVICE Other than atmospheric type vacuum breakers MEDICAL GAS INCEPTORS ❑CASH 0 CHECK 0 VISA 0 MC EXPIRES: �.. 1 Card# VIN: r i SIGNATURE: CSV PEF .sir (_F ''t( 1 261 Project 61110 -7671 Name__ Submit-fa.l 1 CURRENT FEES AVAILABLE AT: htt.://www.s•okaneva e .or. i ertrequiick-links for Forms,Master Fee Schedule. http://www.spokaneval ley.org/uploads/Community—Development/Documents/FormsBui Iding/PlumbingPermitAppl ication040309.doc 0 w . O Proposed Plot Plan oC a Lot 4, Block 2 short plat no. SHP-03-08 �- �c City of Spokane Valley,County of Spokane,State of Washington SCALE 1:201 PUBLIC SEWER AND PUBLIC WATER d W 0 � .__--------,_._._.1 Z 4 — r----7-7—, Z J w J j- Q A. w bCSV :',., -. ,.i I" 2..: *, , ;1 \ ____,„70-7Pray t - . 0 ry ^ L t-5) • cl.. ‹ ) Q` �4 { __ 4� v• r. 32 ) ) �-- % _ _ v -7 t' ) �� � f ) / V % L6 ii(i`ilo/ /op C) 1\Pe r4a �. J 62hc� pa ect ix,7-., kl "Dim.lAvei Pe atn,t to-td-,1161-7 k Imo • :2,0 4A, Lb,,���, For City Use Only CITY OF PLUS Project Number 09(:) .Y.,,-;77(.51 poMne- Project Address 41 .4WVP alle 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 �/ 509.688.0036 ♦ Fax: 509.688.0037 • permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter 'Complete. Your application has been accepted as counter complete. This means all of the required documents,as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE-APPLICANT PINK-BUILDING FILE REV 9/07