2009, 04-14 Permit App: 09000896 AdditionProject Number: 09000896 Inv: I Application Date: 4/14/2009 Page 1 of 3
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Proiect Information:
Permit Use: 18 X 18 BEDROOM ADDITION/13'10 X 35 Contact: JEREMY MORRIS
GARAGE ADDITION Address: 14100 N DARTFORD DR #23
C - S - Z: SPOKANE WA 99208
Setbacks: Front Left: Right: Rear: Phone: (509) 499-9433
Group Name:
Site Information: Project Name:
Plat Key: 001393 Name: KOKOMO TOWNSITE (FEES) District: Sout
Parcel Number: 45283.2714 Block: Lot:
SiteAddress: 10920 E 24TH AVE Owner: Name: MELIUS ETUX, M
Address: 10920 E 24TH AVE
Location:: CSV SPOKANE VALLEY, WA 99206-568
Zoning: R-3 SF Res District
Water District: 007 MODEL
Area: 13,000 Sq Ft Width: 0
Nbr of Bldgs: 1 Nbr of Dwellings: 1
Review Information:
Review
Building Plan Review
Originally Released:
Landuse/Zoning/HE Conditions
Originally Released:
Permits:
Hold: ❑
Depth: 0 Right Of Way (ft): 70
Released By
4/14/2009 By: TMELBOU
Released By:
4/13/2009 By: mbasinger
Operator: jmm Printed By: jmm Print Date: 4/14/2009
Project Number: 09000896 Inv: 1 Application Date: 4/14/2009 Page 2 of 3
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Building Permit
Contractor: SOLID ROCK CONST & Firm: SOLID ROCK CONST & REMODE
Address: 14100 N DARTFORD DR 23 Phone: (509) 499-7566
SPOKANE WA 99208
Description Gr
DECK OPEN R-3
GARAGE U-1
RES ADD R-3
Item Description
RESIDENTIAL PERMIT FE
WSBCCSURCHARGE
SF PLNS RVW < 7999 SQ F
E
T
Unit Desc
This Application:
Total Project:
Tvpe
Notes
So Ft Valuation
SQ Ft
Valuation
VB
DECK
144 $2,160.00
144
$2,160.00
VB
13'10 X 35
485 $9,215.00
485
$9,215.00
ADDITION
VB
18 X 18
400 $38,732.00
400
$38,732.00
ADDITION
Totals:
1,029 $50,107.00
1,029
$50,107.00
Units
Unit Desc
Fee Amount
1
SELECT
$650.75
1
SELECT
$4.50
1
SELECT
$260.30
Permit Total Fees:
$915.55
Mechanical Permit
Contractor: SOLID ROCK CONST & Firm: SOLID ROCK CONST & REMODE
Address: 14100 N DARTFORD DR 23 Phone: (509) 499-7566
SPOKANE WA 99208
Item Description
DUCT WORK SYSTEM
VENTILATION SYSTEM
Contractor: SOLID ROCK CONST &
Address: 14100 N DARTFORD DR 23
SPOKANE WA 99208
Item Description
TOILETS/BIDETS
SINKS
SHOWERS
CLOTHES WASHER
FLOOR DRAINS
Units Unit Desc Fee Amount
2 NUMBER OF $22.00
1 NUMBER OF $13.00
Permit Total Fees: $35.00
Plumbing Permit
Firm: SOLID ROCK CONST & REMODE
Phone: (509) 499-7566
Units
Unit Desc
1
NUMBER OF
2
NUMBER OF
1
NUMBER OF
1
NUMBER OF
1
NUMBER OF
Permit Total Fees:
Fee Amount
$6.00
$12.00
$6.00
$6.00
$6.00
$36.00
Operator: jmm Printed By: jmm Print Date: 4/14/2009
Project Numlier: 09000896 Inv: I Application Date: 4/14/2009
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Notes:
Page 3 of 3
Payment Summary
Permit Tyne Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $915.55 $915.55 $221.14 $694.41
Mechanical Permit $35.00 $35.00 $0.00 $35.00
Plumbing Permit $36.00 $36.00 $0.00 $36.00
$986.55 $986.55 $221.14 $765.41
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: jmm Print Date: 4/14/2009
SCITY OF
pokane
,, jValley-
Community Development
Permit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)689-0037
www.s Ypokankvalle ori NE VALLEY
C11`r or, r<A
PERMIT NUMBER: * -C'
PERMIT FEE:
Residential Construction APR 0 9 ME] New Construction
Permit Application RM k;ENI Addition/Remodel
BY4! --`_❑ Other:
SITE ADDRESS:
t&
ASSESSORS PARCEL NO: q r-� -.-" • ;, -7 l Y _LEGAL DESCRIPTION:
Building Owner:
DIMENSIONS: /3'p X 3.
Name:
Alf
fJ
Address `./pp�_o
f1111
City -.S1,9'0 '4A4
�L State:w4 Zip:
Phone:: _ 9�
3 3 Fax:
Contact Person
Name: 5
Phone: r. c
Describe the scope of work in detail:
a n�v� Bath r�vwi a-. d
❑ Accessory Bldg
Deck
I'❑
Contractor: '
Name: A,"'1, r
r is
Address:
City: State: Zip:
Phone:_>�? pFax:
Contractor Lic No: 0l'JrC?/9Exp Date: kAPt 3p ZO 1
City Business Lic. No: If
Cost of Project: $ 5a/ 06,70, 00 k ''
eclrtwkn- Ac14t-4i0 h oy\, Y�'\G "h i2v� I Gist %tct
GL +C) (rgra�i
Proposed Use: 11-e, w ,')) 6 c otM i Y- V%-\ 4 s A— 4 ro w1
TI-� lla�u y2 w� 11 ►a2 kag d �Ir V2�; LAS 1E 140P.
**************ThP fnllnwinu MUST be complete: (write N/A if not applicable)**********************
HEIGHT TOPEAK a v
DIMENSIONS: /3'p X 3.
# OF STORIES:
TOTAL HABITABLE SPACE:
( \ It
16'x 18 ' "
,-
3,2 y S , -t'4.
MAIN OOR�To SID
2 FLOOR SQ. G:
UNFIN BASEMENT SQ. FTG;
IMPERVIOUS SURFACE
FTG: t/ S
��(}
/Z14
AREA:
FINISHED BASEMENT
4PAGE SQ. FTG -A0
D K/COV. P TIO SQ. FTG:
30% SLOPES ON
1,14
SQ. FTG:
S SQ• Ft
y
PROPERTY:
# OF BEDROOMS:
CONSTRUCTION TYPE:
HE RCE:
SEWER OR SEPTIC?
2
ti6L 1i
er
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application canbe p cessed. _ VW
ZZt+ j�/
SIGNATURE: DATE: �Iq /Q y f �D�d 14 C -W
i8� A?'
Method of Payment: �'�
❑ Cash ❑ Check ❑ Mastercard VISA
Bankcard #: Expires: VIN#: �f
Authorized Signature:
REVISED 2/15/07
RESIDENTIAL CHECK LIST DIRECTIONS:
Place a check mark in box next to each document required for complete submittal.
❑ SITE PLAN
EiProperty lines and dimensions Setbacks to property lines
V irection arrow pointing North and orientation to streets gs
dProposed/existing buildings (footprint and dimensions) ❑ Right of way/easement location & sizes
4 Utilities, septic tank/drain field locations and distances -3 Driveway approach size and location
BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned)
Elevations (Front/Rear/Sides) with roof peak and wall height including basement:
13" Foundation Plan (crawlspace, basement or slab on grade): �
o -l=ooting sizes and locations tlSupporting wood cripple walls or beams
N/Perimeter concrete foundation wall sizes ❑ T+tickened concrete-prads�pperting
27 Crawlspace ventilation b€ams-or_girde t s
Floor Plan of each level (finished or unfinished) with dimensions•
I�Floor Joist direction, size and spacing Window and door location and sizes
Header, beam or concrete lintel sizes ❑ Window well=locations-if eprplicable
❑ Sfeee-waH-panelleeations
❑-fufnaee4eeettie"
Exhaust fan locations
Deck or concrete patio sizes and locations
C7 Roof Plan:
Engineered truss direction and spacing
Rafter and over frame direction, size and spacing
❑ Wall Section Detail including:
Roof
mope/ roofing material/ underlayment/ ice dam protection
'Ef"Sheathing size and type
Ceiling
moist size and spacing
W H
Height/ top plate/ stud size and spacing/ sole plate
❑ Exterior sheathing size and type
Floor
E/'J"oist size and spacing
Foundation Wall
�1�Concrete or Masonry unit width
t Earth to wood separation distance
Footing
'Size
Rad n
ZLf Passive system with 6mil vapor barrier
iscellaneous Construction Details
Deck:
'E� Floor plan/ side view/ dimensions
Floor Joist/ decking direction, size and spacing
❑ smg
N Room usage labels
Smoke detector locations
s
En Ridge, eave and valley lines
T(Beam and girder size and location
M Truss or rafter size, spacing & connection
N Attic insulation/ air space baffle/ ventilation
91Size of ceiling gypsum wall board
f�Siding/ exterior house wrap/ anchor bolts
insulation, vapor barrier, gypsum wall board
VSheathing or concrete floor size/ insulation
� FF oting bottom to finished ground level depth
'Horizontal & vertical reinforcement if any
"einforcement if any
❑ Active system with 6 mil vapor barrier
d Footings/ post/ and beam size and locations
� Handrail / Guard height & spacing
jne
Ualley
For City Use Only
PLUS Project Number
Project Address
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenterCspokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE REV 9/07
Permit Center
S 11703 E Sprague Ave, Suite B-3
�,f Valley Spokane Valley, WA 99206 PERMIT NUMBER:
(509)688-0036 FAX: (509)688-0037 Community Development PERMIT FEE:
wwNv.spokanevalley.or�
Plumbing Permit Application c O1❑L Commercial Residential
SITEADDRESS: 1y C 2V6
6 J/0`aple 'e1/ WA 99,20&
Building Owner
X
COST
=
Name: Alike
,,vv11
L -' ti/r ke J. /vIt / u S
Phone:
509 - 9� y 9y 33 Fax:
Address: O Q
F %A ✓e
City.
Volk � State: 14 Zip. Q Q 6
Contractor
=
Name: emv
O rr i*
Phone:
_ Fax:
Address: I gj00
D a r h�o'rd r-- 2
City.
k -Q Af State: AA Zip: .20
License No:
r C>� e� 6 t
City Bustfiess
Lic: C I
Contact
$6.00
=
Name: jet
r -
Phone:
S Q „ 7S 6
DESCRIPTION OF WORK
1 I TOILETS WATER CLOSET
4 SHOWERS PER TRAP BATH, STALL, ON-SITE BUILT
LAYS/BASINS, BAR, FLOOR, KITCHEN,
5 SINKS LAUNDRY, UTILITY, JANITOR, PHOTO,
# OF UNITS
X
COST
=
TOTAL AMOUNT
1 $6.00
X
$6.00
=
UD
X
$6.00
=
X
$6.00
-
X
X
$6.00
=
9
�
X
$6.00
X
$6.00
6
1 DISHWASHER
I X
1 $6.00
=
7
CLOTHES WASHER
X 1
$6.00
8
GARBAGE DISPOSAL
X
$6.00
=
9
WATER SOFTENER
X
$6.00
=
10
1 ELECTRIC WATER HEATER
NOTE: IF GAS, SEE MECHANICAL
X
$6.00
=
11
FLOOR DRAINS
AREA, CASE, COIL, TRENCH,
CONDENSATE
X
$6.00
-
12
ROOF DRAINS/OVERFLOW DRAINS
X
$6.00
=
13
FOUNTAINS, DRINKING
X
$6.00
=
14
WATER PIPING/DRAIN-IN WASTE,
VENT, PLUMBING, REVERSAL
NSTALLATION, ALTERATION, REPAIR,
REVERSALS
X
$6.00
-
15
SEWAGE EJECTOR
GRINDER, SUMP PUMP
X
$6.00
=
16
WATER USING DEVICE
ICE AN/OR COFFEE MAKER, HOSE BIB,
STEAMER
PROOFER, CARBONATOR, SWAMP
COOLER
X
$6.00
=
17
CROSS CONNECTION DEVICE
VACUUM BREAKER, CHECK VALVE,
AND R.P.B.P.D. FOR: VATS, TANKS,
BOILERS
X
$6.00
-
18
INTERCEPTORS
GREASE TRAP, SAND TRAP,
CHEMICAL HOLDING TANK
X
$6.00
-
19
MEDICAL GAS(per outlet
NITROUS, OXYGEN
X
$6.00
-
20
MISCELLANEOUS PLUMBING FIXTURE
X
$6.00
=
21
PRIVATE SEWAGE DISPOSAUSYS
X
$20.00
=
22
INDUSTRIAL WASTE INTERCEPTOR
X
$15.00
=
METHOD OF PAYMENT:
[]CASH ❑ CHECK 9VISA ❑ MC EXPIRES:
Card# VIN:
SUBTOTAL
PROCESSING FEE
$35.00
TOTAL PERMIT FEE DUE:
AUTHORIZED SIGNATURE:
REVISED 8/26/05
Fermat Center
MY OF 11703 E Sprague Ave, Suite B-3
Spokane PERMIT NUMBER:
Spokane Valley, WA 99206
'j Valley (509)688-0036 FAX: (509)688-0037 PERMIT FEE:
Community Development penin tcen.teritspokancvalle� _0�
Mechanical Permit Application El Commercial [N Residential
RITF. ADDRFRR- 1 / �II L� lJ 17 Cz?,%kah e (0d/ey. . //,114 �(sC ✓ t!/
EXPIRES: VIN:
[]CASH D CHECK lZ VISA D MC
CARD #: SIGNATURE
CURRENT FEES AVAILABLE AT: hftp://www.spokanevaIley.org//uploads/Operations_and_Administrabon/Finance/MasterFeeSchedule.pdf
P:\Community Development\Building Division\Jodi-comm'[\PCF\DRAFT APPS\DRAFT Mechanical Permit App-doc
#UNITS
FURNACES & SUSPENDED HEATERS -INSTALLATION OR RELOCATION
Up to & including 100,000 BTU
FURNACES & SUSPENDED HEATERS -INSTALLATION OR RELOCATION
Over 100,000 BTU
DUCT WORK SYSTEM
eat
HEAT PUMP/AIR CONDITIONER
0-3 TON
AIR CONDITIONER
Over 3-15 TON
AIR CONDITIONER
Over 15-30 TON
AIR CONDITIONER
Over 30-50 TON
AIR CONDITIONER
Over 50 TON
GAS WATER HEATER
GAS PIPING SYSTEM each outlet)
GAS LOG, FIREPLACE, & GAS INSERT
APPLIANCE VENTS INSTALLATION, RELOCATION, REPLACEMENT
REPAIRS OR ADDITIONS
BOILER, COMPRESSORS, ABSORPTIONS SYSTEM
0 to 3 hp -100,000 BTU or less
BOILER, COMPRESSORS, ABSORPTIONS SYSTEM
Over 3 - 15 h — 100,001 to 500,000 BTU
BOILER, COMPRESSORS, ABSORPTIONS SYSTEM
Over 15 — 30 h - 500,001 to 1,000,000 BTU
BOILER, COMPRESSORS, ABSORPTIONS SYSTEM
Over 30 h — 1,000,001 to 1,750,000 BTU
BOILER, COMPRESSORS, ABSORPTIONS SYSTEM
Over 50 h — over 1,750,000 BTU
AIR HANDLER DOES NOT include ducting)
Each unit up to 10,000 cfm, including ducts
AIR HANDLER DOES NOT include ducting)
Each unit over 10,000 cfm
EVAPORATIVE COOLERS other thanportables)
VENTILATION AND EXHAUST
Each fan connected to a singe duct
VENTILATION AND EXHAUST
Each ventilations stem
VENTILATION AND EXHAUST
Each hood served by mechanical exhaust
INCINERATORS
Installation or relocation of residential
INCINERATORS
Installation or relocation of commercial
APPLIANCES
Range, Clothes Washer
UNLISTED APPLIANCES
Under 400,000 BTU
UNLISTED APPLIANCES
Over 400,000 BTU
HOOD
Type I
HOOD
Type 11
L P STORAGE TANK
WOOD OR PELLET STOVE INSERT
WOOD STOVE SYSTEM — FREE STANDING
EXPIRES: VIN:
[]CASH D CHECK lZ VISA D MC
CARD #: SIGNATURE
CURRENT FEES AVAILABLE AT: hftp://www.spokanevaIley.org//uploads/Operations_and_Administrabon/Finance/MasterFeeSchedule.pdf
P:\Community Development\Building Division\Jodi-comm'[\PCF\DRAFT APPS\DRAFT Mechanical Permit App-doc
T7
,t
Y,j
-
f,
bl
I
N
I
R
N
- --- -------
1001
3'— —, \
",
.--
-,,- / 4' cr
LA
pf)
-,L
PLANNING DEPT. APPROVED
BY:
1
RECENED
rt
BY:- :
RESUBMITTAL/REVISION