2009, 07-31 Permit App: 09002336 BeamsProject Number: 09002336 Inv: I Application Date: 7/31/2009 Page 1 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Proiect Information:
Permit Use: REMOVE LOAD BEARING WALLS AND
Contact: GALLINGER CONSTRUCTION
REPLACE WITH BEAMS
Address: 16612 E SECRETARIAT
C - S - Z: SPOKANE VALLEY, WA 99037
Setbacks: Front Left: Right: Rear:
Phone: (509) 928-8865
Group Name:
Site Information:
Project Name:
Plat Key: 001393 Name: KOKOMO TOWNSITE
(FEES) District: Sout
Parcel Number: 45282.3619 Block:
Lot:
SiteAddress: 10923 E 24TH AVE
Owner: Name: MCDERMOTT, TIMOTHY & MAR
Address: 10923 E 24TH AVE
Location:: CSV
SPOKANE, WA 99206-5640
Zoning: R-3 SF Res District
Water District: 007 MODEL
Hold: ❑
Area: 13,000 Sq Ft Width: 0
Depth: 0 Right Of Way (ft): 70
Nbr of Bldgs: 1 Nbr of Dwellings: 1
Review Information: ;; : 1 , _ 2
..., . � ��m��;��,��spm � ��- . � Womm
Review
Building Plan Review Released B
i Y=
Originally Released:
7/30/2009 By: tmelbourn
Permits:.. w , . . _�ap, ._. �rX_ � r . , ..E
Building Permit
Contractor: GALLINGER CONSTRUCTION Firm: GALLINGER CONSTRUCTION
Address: 16612 E SECRETARIAT Phone: (509) 928-8865
VERADAL, WA 99037
This Application:
Description Grp Type Notes So Ft Valuation
1&2 FAMILY R-3 VB BEAMS 0 $7,000.00
Totals: 0 $7,000.00
Item Description Units Unit Desc
RESIDENTIAL PERMIT FEE 1 SELECT
WSBCC SURCHARGE 1 SELECT
SF PLNS RV W < 7999 SQ FT 1 SELECT
Permit Total Fees:
Operator: JD Printed By: JD Print Date:
Total Project:
Sa Ft Valuation
0 $7,000.00
0 $7,000.00
Fee Amount
$139.25
$4.50
$55.70
$199.45
7/31/2009
Project Number: 09002336 Inv: I Application Date: 7/31/2009 Page 2 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Notes •
Issued home occupation affidavit of exemption, Tim McDermott, "Advanced and Basic Emergency
Action Training", home office for training consultant
Payment Summary:
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owina
Building Permit $199.45 $199.45 $55.70 $143.75
$199.45 $199.45 $55.70 $143.75
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: J D Printed By: JD Print Date: 7/31/2009
Permit Center
SMY of 11703 E Sprague Ave, Suite B-3 PERMIT NUMBER:
pokane Spokane Valley, WA 99206 PERMIT FEE:
Yt
400PValle (509)688-0036 FAX: (509)688-0037
www.spokanevalley-org
Community Development
Residential Construction ❑ New Construction ❑ Accessory Bldg
Permit Application ❑ Addition/Remodel ❑ Deck
❑ Other:
SITE ADDRESS:
ASSESSORS PARCEL NO:
Building Owner:
Name:
Address`. 25,
City: .:�State: Zip:
Phone:. Fax:
Contact Person
Name:
Phone:
Describe the scope of work in detail:
Proposed Use:
LEGAL DESCRIPTION:
Contractor:
Name: C n
Address:
City: State: Zip:
Phone: AV/Fax:
Contractor Lic No: Exp Date: .�,
C
City Business Lic. No:
Cost of Project:
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK: f
DIMENSIONS:
# OF STORIES:
TOTAL HABITABLE SPACE:
MAIN FLOOR TO SQ.
2 FLOOR tO. FTG:
UNFIN BASEMENT SQ. FTG:
IMPERVIO S SURFACE
FTG: 49-1,
4&
' �
AREA:
FINISHED BA9M N
GARAGE Q. FTG:
DECK/COV. PATIO SQ. FTG:
30% SLOPES ON
SQ. FTG:
PROPERTY:
# OF BEDROO :
CONSTRUCT TYPE:
HEAT SOURCE:SEWER
OR SEPTIC?
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinan es. 0 Plans or -additional information may be required to be submitted, and subsequently approved before
this application can b ro ssed.'
SIGNATURE: ` DATE: (�_ 09 ,RE CEDEARD L;',�
Method of Payment: \ �`' '-LY
❑ Cash ❑ Check ❑ Mastercard ❑ VISA JUL 2 4 2009
Bankcard #: Expires: VIN#: t
By -
Authorized Signature: t r
REVISED 2/15/07 -�- -_
RESIDENTIAL CHECK LIST DIRECTIONS:
Place a check mark in box next to each document required for complete submittal.
❑ SITE PLAN
❑ Property lines and dimensions ❑ Setbacks to property lines
❑ Direction arrow pointing North and orientation to streets ❑ Distance between buildings
❑ Proposed/existing buildings (footprint and dimensions) ❑ Right of way/easement location & sizes
❑ Utilities, septic tank/drain field locations and distances ❑ Driveway approach size and location
BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned)
❑ Elevations (Front/Rear/Sides) with roof peak and wall height including basement:
❑ Foundation Plan (crawispace, basement or slab on grade):
❑ Footing sizes and locations
❑ Supporting wood cripple walls or beams
❑ Perimeter concrete foundation wall sizes
❑ Thickened concretetpa6 supporting
❑ Crawlspace ventilation
beams or girder trusses. _.
❑ Floor Plan of each levdl (finished or unfinished) with dimensions:.
❑ Floor Joist direction, size and spacing
❑ Window and door:-looption and sizes
❑ Header, beam or concrete lintel sizes
❑ Window well locations if applicable
❑ Brace wall panel locations
❑ Room usage labels
❑ Water heater and furnace locations
❑ Smoke detector locations
❑ Exhaust fan locations
❑ Attic and crawl space access locations
❑ Deck or concrete patio sizes and locations
❑ Fire Wall construction
❑ Roof Plan:
❑ Engineered truss direction and spacing
❑ Rafter and over frame direction, size and spacing
❑ Wall Section Detail including:
Roof
❑ Slope/ roofing material/ underlayment/ ice dam protection
❑ Sheathing size and type
Ceiling
o Joist size and spacing
Wall
❑ Height/ top plate/ stud size and spacing/ sole plate
❑ Exterior sheathing size and type
Floor
❑ Joist size and spacing
Foundation Wall
❑ Concrete or Masonry unit width
❑ Earth to wood separation distance
Footing
❑ Size
Radon
❑ Passive system with 6mil vapor barrier
Miscellaneous Construction Details
❑ Deck:
❑ Floor plan/ side view/ dimensions
❑ Floor Joist/ decking direction, size and spacing
❑ Stairway tread rise & run and nosing
❑ Ridge, eave and valley lines
❑ Beam and girder size and location
❑ Truss or rafter size, spacing & connection
❑ Attic insulation/ air space baffle/ ventilation
o Size of ceiling gypsum wall board
❑ Siding/ exterior house wrap/ anchor bolts
❑ Insulation, vapor barrier, gypsum wall board
❑ Sheathing or concrete'floor size/ insulation
❑ Footing bottom to finished ground level depth
❑ Horizontal & vertical reinforcement if any
❑ Reinforcement if any
❑ Active system with 6 mil vapor barrier
❑ Footings/ post/ and beam size and locations
0 Handrail / Guard height & spacing
Site Address: 10923 E 24TH AVE
Parcel Number. 45282.3619
Zoning: R-3
Fire District: FD 01
Project
Transmittal
City of Spokane Valley
Community Development
Department
11703 E. Sprague Ave, Suite B3
Spokane Valley, WA 99206
Phone: 509.688.0036
Wafer District: MODEL
Applicant: GALLINGER CONSTRUCTION
16612 E SECRETARIAT
SPOKANE VALLEY, WA 99037
(509) 928-8865
e-mail:
Contact: GALLINGER CONSTRUCTION
16612 E SECRETARIAT
SPOKANE VALLEY, WA 99037
(509) 928-8865
e-mail:
Contractor: GALLINGER CONSTRUCTION
16612 E SECRETARIAT
VERADAL, WA 99037
(509) 928-8865
New project
Pre,zious pre -app meeting 'El
Plan revisions ❑
Transmittal Date:
Wednesday, July 29, 2009
Project Number. 09002336
Owner: MCDERMOTT, TIMOTHY & MARC[
10923 E 24TH AVE
SPOKANE, WA 99206-5640
e-mail:
Occupant:
e-mail:
Io E EE W E DD
Arch / Engineer: LJ L
D �I
e-mail:
UHLD111I
Project REMOVE LOAD BEARING WALLS AND REPLACE WITH BEAMS
Description:
Please send all plan review and project comments via e-mail to the
highlighted individuals.
'goYOF 14%�
dkoanT
jUalley�
For City Use Only
PLUS Project Number
Project Address
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevatley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
(77".
1
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE REV 9/07