Loading...
2012, 05-17 Permit App: APR-2012-0025 Approach • A-102 - 201 -DO 2-5 0 \11■%t CommunityeDevelopment Department (Staff Use Only) Permit Center 11703 East Sprague Avenue, Suite B-3 PERMIT NUMBER: Spokane Valley, WA 99206 Tel: (509) 720-5240 PERMIT FEE: it 52.00 4i *Va.1 Fax: (509) 688-0037 permitcenter@sookanevallev.orq APPROACH PERMIT APPLICATION PROJECT ADDRESS: !,SSZ- E. Z L( rh START DATE: ('o — S - I Z ANTICIPATED COMPLETION DATE: 6 _ /O /Z. BUILDING OWNER NAME: I-{ v e r y M C (<e MAILING ADDRESS: 1 o L� E, L-' t CITY: S,K IJe7 Via LL-e-u STATE: GO i\ ZIP: 9?c 3? CONTACT PERSON 9 9�jSON NAME: _. �� ��vT rE� PHONE: Le S 9 1 0 I QFAX: CELL: CONTRACTOR NAME: Co T— MAILING ADDRESS: a00 N l .R -I—re-T e-ZZ- �S CITY: VI\V\t STATE: A ZIP: 9`( z 0 6 PHONE: q v_ s 90 / FAX: CELL: 9 9 y s-90 CONTRACTOR LICENSE#: EXPIRES: CITY BUSINESS LICENSE#: PROJECT DESCRIPTION (Please Provide Site Sketch) Residential Driveway [J Commercial/Industrial Driveway • Existing Curb &Gutter [ Rural Road Section • Culvert Installation 0 Sidewalk Repair/Construction ❑'' Other Conditions: Bond/Insurance certification must be on file with the City. DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit Inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner In this transaction. 4) All construction Is to be done In full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and su sequently approved before this application can be processed. Signature � �--�- Date: Jam— / 7r P:\Community Development\11 Forms\A.Building\Permit Center\Approach Permit 2-24-11.doc Page 1 of 2 • APPROACH PERMIT APPLICATION REQUIRED SKETCH INFORMATION (Revised 1/25/10) Provide required measurements (in sketch boxes), and include street name. Check all existing conditions that apply: ❑Sidewalk Drainage Ditch ft wideDrywell (show location on sketch) ° ft from back of curb Other (please describe below) [❑Streetside Swale wl DISTANCE FROM z; INEAREST PROPERTY LINE MAY BE LEFT OR RIGHT SIDE) Li FT(SEE TABLE) w� a, 0i CC �I CONCRETE APPROACH CURB RETURN 1-4'--1---THROAT G (SEE TABLE)WIDTH WING-I CURBIF CORNER LOT, DISTANCE FROM STREET NAME CURB RETURN n FT(SEE TABLE) STREET WITH CURB w i DISTANCE FROM - NEAREST PROPERTY LINE MAY BE LEFT OR RIGHT SIDE) E-IFT(SEE TABLE) 15'RADIUS 0 l ASPHALT RADIUS a_• APPROACH RETURN EDGE OF 1—THROATWIDTH nFT ASPHALT (SEE TABLE) IF CORNER LOT, DISTANCE FROM STREET NAME RADIUS RETURN Q FT(SEE TABLE) STREET WITH ASPHALT EDGE Approach Requirements: • Maximum 2 approaches per property frontage; one on arterials. • Total width of approaches not to exceed 50% of frontage width. Residential Commercial Approaches Approaches Distance from Curb/Radius Return 15'minimum 75'minimum Separation between Approaches (measured from centerline to See Page 7-27 centerline of each approach) None specified in City Street Standards Throat Width (flat portion) 16'min., 30'max. 30'min., 40'max. Wing Width (at curb line) 4 feet typical 4 feet typical Minimum Distance from Side Property Line (@ r/w) 5.0' 5.0' Minimum Distance from Crosswalk 5' 5' P:\Community Development\11 Forms\A. Building\Permit Center\Approach Permit 2-24-11.doc Page 2 of 2 125' 6' 5' ......E___..._8' ,�CCo 5 „ 7'- 116" 6'_519" —� , p46y 9,_9_5 POWER A 6,-5 5 16 --,.<)7- . \_.-i u.) -,c,, 7'-115 > \ 16 d \ \ 10,_28„ \ GARAGE 1-� \ 25'X40' 0- \ \ f !`J \ HOUSE 81' 400 amp meter socket 200 amp house 200 amp garage I II I 30' CONCRETE 17,_4„ 25,_111111 SLAB Li 167 11 V) Li 33 16 1 Ri` J \ / \ N I 30 0