Loading...
2005, 11-14 Permit App: 05004303 Addition Project Number: 05004303 Inv: 1 Application Date: 11/14/2005 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project In formation: Permit Use: CLOSET ADDITION Contact: DUPONT CONSTRUCTION Address: 622 E DECATUR C-S-Z: SPOKANE,WA 99206 Setbacks:Front Left: Right: Rear: Phone: (509)489-5720 Group Name: Site Information: Project Name: Plat Key: 005064 Name: EVERGREEN PT 06TH ADD District: F Parcel Number: 45263.3702 Block: Lot: SiteAddress: 14010 E 24TH AVE Owner:Name: DICK YOUNG Address: 14010 E 24TH Location::CSV SPOKANE VALLEY,WA 99037 Zoning: UR-3.5 Urban Residential 3.5 Water District: Hold: ❑ Area: 1,805.00 Acres Width: 94 Depth: 180 Right Of Way(ft): 60 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Review Site Plan Review Released B . ; Plan Review ( 1/13- Released By: "; jT. j'Ai()Ii,i p am Operator: KKZ Printed By: KJK Print Date: 11/14/2005 Project Number: 05004303 Inv: 1 Application Date: 11/14/2005 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Building Permit Contractor: DUPONT CONSTRUCTION INC Firm: CHRIS DUPONT/DUPONT CONST Address: 622 E DECATUR Phone: (509)489-5720 SPOKANE,WA 99207 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation So Ft Valuation RES ADD R-3 VB 72 $5,376.96 72 $5,376.96 Totals: 72 $5,376.96 72 $5,376.96 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $125.25 STATE SURCHARGE 1 SELECT $4.50 RESIDENTIAL PLAN REVIEW 1 SELECT $50.10 Permit Total Fees: $179.85 Payment Summary• ,,,,, Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $179.85 $179.85 $0.00 $179.85 $179.85 $179.85 $0.00 $179.85 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: KKZ Printed By: KJK Print Date: 11/14/2005 aT�a Permit Center Spokane 11707 E Sprague Ave, Suite 106 ' PERMIT NUMBER: y 3iJ,3 4000 Valley Spokane Valley,WA 99206 PERMIT FEE: (509)688-0036 FAX: (509)688-0037 Community Development www.spokanevalley.org.com Residential Construction o New Construction o Accessory Bldg Permit Application o Addition/Remodel o Deck o Other: SITE ADDRESS (19 c i'—' ' 4ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Buildin owner Contractor Name: r'( - Name: S21 � Address: er (--(,. Address: .. L--2_,..' �c.ar' City: Zip: .0::tq��� City:�a Zip: ) Phone 0ei� ( ax: Phone: Fax: Lic No: Exp.Date: Contact Person 00 Pa e7 City Business Lic No: Nam i, Phone: I Describe the scope of work in detail: Cost of Project: $ L{I — c x122 C EJ **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: DIMENSIONS: #OF STORIES: TOTAL HABITABLE SPACE: MAIN FLOOR TO SQ. 2"D FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE FTG: AREA: FINISHED BASEMENT GARAGE SQ. FTG: DECK/COV. PATIO SQ. FTG: 30% SLOPES ON SQ. FTG: PROPERTY: #OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: SEWER OR SEPTIC? DISCLAIMER The permitee verifies,acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal,state or local laws,codes or ordinances.6) P r additional information may be required to be submitted,and subsequently approved before this applicati• processe4. iiiiiirMili I L Signature ���� �t Date _ Method of Payment: (Faxed permit applications will only be accepted with major ban ) 0 Cash 0 Check 0 Mastercard ISA 0 Other Bankcard#: Expires: VIN#: Authorized Signature: REVISED 8/25/2005 Permit Center S j�°F 'fie 11707 E Sprague Ave, Suite 106 Y Spokane Valley,WA99206 401./ VaaY (509)68 -0036 FAX: (509)688-0'037 www.spolcanevallev.org.com Community Development • Residential Plan Submittal Minimums • ❑ Completed Building, Plumbing & Mechanical application with: Accurate address, Parcel Number and/or Legal Description, description of work, owner and contractor information, signature, and date. ❑ Two sets of plans including Site Plan, elevations, floor plans, foundation plans • With details, roof plan, framing plans & details. ❑ Show the height of any proposed buildings or accessory structures. ❑ Floor plan for each floor. Dimension to scale (minimum 1/8") and label each Room (including sq. footage of house and garage on plans) Show each level of existing house and square footage of any additions. ❑ All braced wall panel types: show locations and details of installation, including engineered design. ❑ Egress windows: Provide at least one window or exterior door approved for Emergency escape or rescue from a basement and in every room for sleeping. ❑ Smoke detector locations ❑ 22" X 30" attic access location ❑ 18" X 24" crawl space access: ❑ One-hour separation detail: between house and garage • ❑ Floor framing details: Joist type, size, spacing and installation details ❑ Roof framing plan and details ❑ Furnace and hot water heater location. • ❑ All header locations: type, size, and connections • ❑ Foundation plan ❑ Insulation information ,.._. Lo-i- Z . B Liv,_-..V. 17 Ev rgLrxt Ai .1 ;I:7 - ---'..? ;•••t'. Jr, ' ! .... - 1.- LI 0 ,• ..--- ; • I . •'i \if: - •. ...i.: i 1 1 6 '401 7. iNiD7 I , 11Z - 1 o asr &..1_3,...T. r_9 \ a • \ PLANNING DEPT. APPROVE il s \ • . BY2 ci, h) lakt vi_ . _.: Jr1 - Pov.V . • DATE: VCA(' q Li 1_0 ° • P10. 19 E 9-Li Y-7# A vi-- YOvo--1 & -- At-o f-{- 1-.0A, Cc tea is /rEf moi' i�/!-s.• k, act- aF �lbw � Y 2 . . 'g— _ 1 '' 44 8--m •S ni _ (' C r.•_/./,'..c_.'..,.N,'.Sp}o:4LL wq 4-74_-,..k,.,??k,C_:t,2r._IW: d:i...tc..‘_.c_--:-•-:- • cam. . . _ . lib. ... ',3- 1i :7tl.,l,c.,)4,`a:'e,4 ,): 1610;-s7 i.) 1► d4a cvo-,YZ : • EXPIRES 12 2�%05 • ..-- 3/ ' •_ . _--- _ ,tell 0N 1-ooh . (.-tuts tY Ie. Y .:6 ,. _it.. .._ c...c„, „,,s,- -.. . ..,.. .:, IV IV A lg.. ' ' ' - ' • - • ( ;1--- j ' '' 6.`lc(072,--e -4\s/ Oke1l,///n, if4171- d \(:.' . 0•• • c,:. g (.......... ..„....„ (...._,I -7--------- .. --,9 ,c, .. . r :: s„ _..... ... . ...... ... • • • o 0 . i. " — ,---, - ... .. ....... .. . _ ... .. . _ • ,.U. . . _I ., -*, - - , A 4. 12 . Daniel Wambeke,P.E. BY SUBJECT PAGE NO. OF WAMBEKE ENGINEERING lvv ��,►• if 2913 E.61st Court DATE Cbl (J • "4 /7`a'1 nil✓ PROJECT NO. Zof Spokane,WA 99223 Phone:509/443-6186 Fax:509/448-6582 - E-Mail:dwambeke@msn.com ESf(9k) 4 rr 444,4 ! ' I/Z ' x g ' (c6rre'r "MA A i l',v I€IL CCIA-X ' ✓1-14 / SP41411 NE, G'/¢ 1240 (Sx✓dw) 1o1,0 'IF wi,t,9 Sr£j D "VI/, E1ory ' 5'FrfM'C QCS/' 01-7E¢eAr C _. ALL-04444L€ fd!L E. M-(Ay �iZ rf d2E' ZaddS,c rLw �wA Cr-c+-£ L _as �si tvolt 4.4.0 i 'sr , I®t hiM€, sed 64V3Ed Df- L Z N GLS/€ LA" drAi1 5 Z I f - 1/¢ ! S 0\\L f/Gx.. Fi4 i1. JD f f7s I EXP RLS 1229-05 l� sE Z"Kru`•.__,J,L #LFcw1-- J-PeJ771 & (a - o. C. LrJ 4,0 ea%- o.1Tr- CljtA0 33 = 1(4 3- SF Ie4. 4 = 4/1 .tsr•-3 5ELI,".4= 612- l f l y ts') 2 _ Zl- 3 et-I 7 3.rr -3 _ex. e• c. 3 v 3004 . C6/4 A14: 4 /WA' dA. 4 AAA,. = (64 • -) ( 'Z ¢ z 0.0t fiLl.estEC r. 42-6-4 = !9- k !,-417 d.ci rL /C- €r at r E z " G .• 0/:7- l# Z A4 FTE4 r / •'_ c . Lo AO or- he}FT,'.L f = l 3, t )v f ted) =.1"3.2 PLF 90A --- 7. 6 % o" M- tc,t.-f2 4J.1 L = (....1-(s).2) ( .)L : Z1-73 (0--Li Co fl / rcC9') !/4C6.3) bdt L , AT(5-s �- -.��,lu3 T /-a -5 •d- t •fi/_ 3 1/14 o Z hal = 3 Cil -L)(6/1- c.r 4 CI5)(51i).: Z./to/x D'� w4aq/a dill)61/ 61-sr. creb, l Z Daniel Wambeke,P.E. BY SUBJECT PAGE NO. OF WAMBEKE ENGINEERING 2913 E.61st Court DATE fP'Z••�� Cd<"(r �d '/ 4 N�r Pr" PROJECT NO. ZA14/3-. Spokane,WA 99223 Phone:509/443-6186 Fax:509/448-6582 E-Mail:dwambeke@msn.com /640 = ? Vz 4 - 0-70o /,i- tkr '. 0.dei-9(s-it is a bAGL.S ClJe 1 ._ e6 " /JF - Z sever (s " d • c U if A t 4' . /A-x/4- c,-/0.12 G(se l//(o- • O •1'. £41-d Ail(twee ,(' ( i. c rise A dl4w4 Ta S;✓ 1d t 4/Att.!' 9J4-# IL o- L<j.q 4 o& dF— 4144 = G( (la ) t Gli eat¢a, f SCra) _ 33o /ALF /�dwl e/-7"- ? L /.S(3Sa 6/7-) `' z ?',T 6 cc) A--Ge a s 31(6" K 10.4 i• CLc t t4,44 4,E4a,4 20,F- OFId, �h Z 4.0". L'v= lQe/if aae � ,arc 5r 7 �• �t/I - �sdr.� _ _1,2. 3 9 tat-4) ACf CJ !ice) S1_4L Cs- 'C✓ 31) (?re) ((24 ) r a 4-k Pfe 4. (7. 401i. co lb d l crC2) (3.aa)/ _s) -~_ 3 rtfr LC3 � Ci6000 06f-4) e(7,4-e/ = (4412,4-a' 0-6dd ti-effgI 7 d. 33?(•.-cYE.f !J*- *- Orr. l(6?'5) �dtT1 An d r-- fr- ti-(z, (1 Tc) z ZRia L8 air <V cI6Air -- /h 4 ,(eirvel ;6 — A s- 6 .As& & .. x .• 1`14M' f'e�- 4 L (•-e4'r.c4 • 1jS Ge r 14'' IJP-sPE c—tdx_3 (44£,0 /9r/f7-f fv /c:O e, -4S /zJor .'4t der/4A-) ti,iistitcktvwt eCe77A-4 ar toterel = U u l 67d�9fT fr 1, 1 vans-4 t « d K 5 t a-' 4,€i'