2005, 11-14 Permit App: 05004303 Addition Project Number: 05004303 Inv: 1 Application Date: 11/14/2005 Page 1 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project In formation:
Permit Use: CLOSET ADDITION Contact: DUPONT CONSTRUCTION
Address: 622 E DECATUR
C-S-Z: SPOKANE,WA 99206
Setbacks:Front Left: Right: Rear: Phone: (509)489-5720
Group Name:
Site Information: Project Name:
Plat Key: 005064 Name: EVERGREEN PT 06TH ADD District: F
Parcel Number: 45263.3702 Block: Lot:
SiteAddress: 14010 E 24TH AVE Owner:Name: DICK YOUNG
Address: 14010 E 24TH
Location::CSV SPOKANE VALLEY,WA 99037
Zoning: UR-3.5 Urban Residential 3.5
Water District: Hold: ❑
Area: 1,805.00 Acres Width: 94 Depth: 180 Right Of Way(ft): 60
Nbr of Bldgs: 1 Nbr of Dwellings: 1
Review
Site Plan Review Released B . ;
Plan Review ( 1/13-
Released By: "; jT.
j'Ai()Ii,i p am
Operator: KKZ Printed By: KJK Print Date: 11/14/2005
Project Number: 05004303 Inv: 1 Application Date: 11/14/2005 Page 2 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Building Permit
Contractor: DUPONT CONSTRUCTION INC Firm: CHRIS DUPONT/DUPONT CONST
Address: 622 E DECATUR Phone: (509)489-5720
SPOKANE,WA 99207
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation So Ft Valuation
RES ADD R-3 VB 72 $5,376.96 72 $5,376.96
Totals: 72 $5,376.96 72 $5,376.96
Item Description Units Unit Desc Fee Amount
RESIDENTIAL PERMIT FEE 1 SELECT $125.25
STATE SURCHARGE 1 SELECT $4.50
RESIDENTIAL PLAN REVIEW 1 SELECT $50.10
Permit Total Fees: $179.85
Payment Summary• ,,,,,
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $179.85 $179.85 $0.00 $179.85
$179.85 $179.85 $0.00 $179.85
Disclaimer:
Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information
contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: KKZ Printed By: KJK Print Date: 11/14/2005
aT�a Permit Center
Spokane 11707 E Sprague Ave, Suite 106 ' PERMIT NUMBER: y 3iJ,3
4000 Valley
Spokane Valley,WA 99206 PERMIT FEE:
(509)688-0036 FAX: (509)688-0037
Community Development www.spokanevalley.org.com
Residential Construction o New Construction o Accessory Bldg
Permit Application o Addition/Remodel o Deck
o Other:
SITE ADDRESS (19 c i'—' ' 4ASSESSORS PARCEL NO: LEGAL DESCRIPTION:
Buildin owner Contractor
Name: r'( - Name: S21
�
Address: er (--(,. Address: .. L--2_,..' �c.ar'
City: Zip: .0::tq��� City:�a Zip: )
Phone 0ei� ( ax: Phone: Fax:
Lic No: Exp.Date:
Contact Person 00 Pa e7
City Business Lic No:
Nam i,
Phone: I
Describe the scope of work in detail: Cost of Project: $ L{I —
c x122 C EJ
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK: DIMENSIONS: #OF STORIES: TOTAL HABITABLE SPACE:
MAIN FLOOR TO SQ. 2"D FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE
FTG: AREA:
FINISHED BASEMENT GARAGE SQ. FTG: DECK/COV. PATIO SQ. FTG: 30% SLOPES ON
SQ. FTG: PROPERTY:
#OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: SEWER OR SEPTIC?
DISCLAIMER
The permitee verifies,acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling,the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal,state or
local laws,codes or ordinances.6) P r additional information may be required to be submitted,and subsequently approved before
this applicati• processe4.
iiiiiirMili
I L
Signature ���� �t Date _
Method of Payment: (Faxed permit applications will only be accepted with major ban )
0 Cash 0 Check 0 Mastercard ISA 0 Other
Bankcard#: Expires: VIN#:
Authorized Signature:
REVISED 8/25/2005
Permit Center
S j�°F 'fie 11707 E Sprague Ave, Suite 106
Y Spokane Valley,WA99206
401./ VaaY (509)68 -0036 FAX: (509)688-0'037
www.spolcanevallev.org.com
Community Development
• Residential Plan Submittal Minimums
•
❑ Completed Building, Plumbing & Mechanical application with: Accurate address,
Parcel Number and/or Legal Description, description of work, owner and
contractor information, signature, and date.
❑ Two sets of plans including Site Plan, elevations, floor plans, foundation plans
•
With details, roof plan, framing plans & details.
❑ Show the height of any proposed buildings or accessory structures.
❑ Floor plan for each floor. Dimension to scale (minimum 1/8") and label each
Room (including sq. footage of house and garage on plans) Show each
level of existing house and square footage of any additions.
❑ All braced wall panel types: show locations and details of installation, including
engineered design.
❑ Egress windows: Provide at least one window or exterior door approved for
Emergency escape or rescue from a basement and in every room for sleeping.
❑ Smoke detector locations
❑ 22" X 30" attic access location
❑ 18" X 24" crawl space access:
❑ One-hour separation detail: between house and garage
•
❑ Floor framing details: Joist type, size, spacing and installation details
❑ Roof framing plan and details
❑ Furnace and hot water heater location.
• ❑ All header locations: type, size, and connections
•
❑ Foundation plan
❑ Insulation information
,.._.
Lo-i- Z . B Liv,_-..V. 17
Ev rgLrxt Ai .1 ;I:7 - ---'..? ;•••t'. Jr, ' !
....
-
1.-
LI 0 ,•
..---
; •
I
. •'i
\if: - •. ...i.: i
1
1
6
'401
7.
iNiD7 I
, 11Z
-
1 o asr
&..1_3,...T.
r_9
\ a • \
PLANNING DEPT. APPROVE il s
\ • .
BY2 ci, h) lakt vi_
. _.: Jr1
-
Pov.V
.
• DATE: VCA(' q Li 1_0 ° •
P10. 19 E 9-Li Y-7#
A vi--
YOvo--1 & -- At-o f-{- 1-.0A, Cc tea is
/rEf
moi' i�/!-s.•
k, act- aF
�lbw
� Y 2 . . 'g— _ 1 '' 44 8--m •S ni _
(' C r.•_/./,'..c_.'..,.N,'.Sp}o:4LL wq
4-74_-,..k,.,??k,C_:t,2r._IW:
d:i...tc..‘_.c_--:-•-:-
•
cam. . . _ . lib. ... ',3- 1i :7tl.,l,c.,)4,`a:'e,4
,):
1610;-s7 i.)
1► d4a cvo-,YZ :
•
EXPIRES 12 2�%05
•
..-- 3/ ' •_
. _--- _ ,tell
0N
1-ooh . (.-tuts
tY
Ie. Y .:6 ,. _it.. .._ c...c„, „,,s,- -..
. ..,..
.:, IV IV A lg.. ' ' ' - ' • -
• ( ;1--- j
' '' 6.`lc(072,--e -4\s/
Oke1l,///n,
if4171- d \(:.' .
0•• •
c,:. g
(.......... ..„....„
(...._,I -7--------- .. --,9 ,c,
.. . r
:: s„ _..... ... .
...... ... • • • o 0 . i.
" — ,---, - ... .. ....... .. .
_ ... .. . _
• ,.U. . . _I ., -*, - - , A
4. 12 .
Daniel Wambeke,P.E. BY SUBJECT PAGE NO. OF
WAMBEKE ENGINEERING lvv ��,►• if
2913 E.61st Court DATE Cbl (J • "4 /7`a'1 nil✓ PROJECT NO. Zof
Spokane,WA 99223 Phone:509/443-6186 Fax:509/448-6582 - E-Mail:dwambeke@msn.com
ESf(9k) 4 rr 444,4 ! ' I/Z ' x g ' (c6rre'r "MA A i l',v I€IL CCIA-X '
✓1-14 / SP41411 NE, G'/¢
1240 (Sx✓dw) 1o1,0 'IF
wi,t,9 Sr£j D "VI/, E1ory '
5'FrfM'C QCS/' 01-7E¢eAr C _.
ALL-04444L€ fd!L E. M-(Ay �iZ rf d2E' ZaddS,c rLw
�wA
Cr-c+-£ L _as
�si
tvolt 4.4.0 i 'sr
, I®t
hiM€, sed 64V3Ed Df- L Z N
GLS/€ LA" drAi1 5 Z I f - 1/¢
! S 0\\L
f/Gx.. Fi4 i1. JD f f7s I EXP RLS 1229-05
l�
sE Z"Kru`•.__,J,L #LFcw1-- J-PeJ771 & (a - o. C.
LrJ 4,0 ea%- o.1Tr- CljtA0 33 = 1(4 3-
SF Ie4. 4 = 4/1 .tsr•-3
5ELI,".4= 612- l f l y ts') 2 _ Zl- 3 et-I 7 3.rr -3 _ex.
e• c.
3 v 3004 . C6/4 A14: 4 /WA' dA.
4 AAA,. = (64 • -) ( 'Z ¢ z 0.0t fiLl.estEC
r. 42-6-4 = !9- k !,-417 d.ci rL /C- €r at
r E z " G .• 0/:7- l# Z A4 FTE4 r / •'_ c .
Lo AO or- he}FT,'.L f = l 3, t )v f ted) =.1"3.2 PLF
90A --- 7. 6 % o"
M- tc,t.-f2 4J.1 L = (....1-(s).2) ( .)L : Z1-73 (0--Li
Co fl / rcC9') !/4C6.3)
bdt L , AT(5-s �- -.��,lu3 T /-a -5 •d-
t •fi/_ 3
1/14 o Z hal = 3 Cil -L)(6/1- c.r 4 CI5)(51i).: Z./to/x D'�
w4aq/a dill)61/ 61-sr. creb, l Z
Daniel Wambeke,P.E. BY SUBJECT PAGE NO. OF
WAMBEKE ENGINEERING
2913 E.61st Court DATE fP'Z••�� Cd<"(r �d '/ 4 N�r Pr" PROJECT NO. ZA14/3-.
Spokane,WA 99223 Phone:509/443-6186 Fax:509/448-6582 E-Mail:dwambeke@msn.com
/640 = ? Vz 4 - 0-70o /,i- tkr '. 0.dei-9(s-it is a
bAGL.S
ClJe 1 ._ e6 " /JF - Z sever (s " d • c
U if A t 4' . /A-x/4- c,-/0.12
G(se l//(o- • O •1'. £41-d Ail(twee ,(' ( i. c rise
A
dl4w4 Ta S;✓ 1d t 4/Att.!'
9J4-# IL o-
L<j.q 4 o& dF— 4144 = G( (la ) t Gli eat¢a, f SCra) _ 33o /ALF
/�dwl e/-7"- ? L /.S(3Sa 6/7-) `' z ?',T 6 cc) A--Ge
a s 31(6" K 10.4 i• CLc t t4,44 4,E4a,4 20,F- OFId,
�h Z 4.0". L'v= lQe/if aae � ,arc
5r 7 �• �t/I - �sdr.� _ _1,2. 3 9 tat-4) ACf CJ !ice)
S1_4L
Cs-
'C✓ 31) (?re) ((24 ) r a 4-k Pfe 4. (7. 401i.
co lb d l crC2) (3.aa)/ _s) -~_
3 rtfr LC3 � Ci6000 06f-4)
e(7,4-e/ = (4412,4-a' 0-6dd ti-effgI 7 d. 33?(•.-cYE.f !J*-
*-
Orr. l(6?'5) �dtT1
An d r-- fr- ti-(z, (1 Tc) z ZRia L8
air <V cI6Air -- /h 4 ,(eirvel ;6 —
A s-
6 .As& & .. x .• 1`14M' f'e�- 4 L (•-e4'r.c4 • 1jS Ge r 14''
IJP-sPE c—tdx_3
(44£,0 /9r/f7-f fv /c:O e, -4S
/zJor .'4t der/4A-)
ti,iistitcktvwt eCe77A-4 ar toterel = U u l 67d�9fT fr
1, 1 vans-4 t « d K 5 t a-' 4,€i'