2004, 11-30 Permit: 04009059 Residence BUILDING DIVISION
sjoiane i
11707E Sprague Avenue Suite 106
Valle Spokane Valley, WA 99206
Site Information Project Information
�
Site Address: 14530E 24TH AVE
Project Number: 04009059 Inv: 1 Issue Date: 11/30/2004
Permit Use: NEW RESIDENCE W/ATTACHED GARAGE-NATURAL
Parcel Number: 45263.2108 GAS
Subdivision: Applicant: BOWERS,DAVID E.&LISA M.
Block: Lot: B 1115 S SAINT CHARLES ST
VERADALE,WA 99037-8831 Phone: (509)863-3723
Zoning: 13R-3 Urban Residential 3.5 Contact: BOWERS,DAVID E.&LISA M.
Owner: BOWERS,DAVID E.&LISA M. 1115 S SAINT CHARLES ST
Address: 1115 S SAINT CHARLES ST VERADALE,WA 99037-8831 Phone: (509)863-3723
VERADALE,WA 99037-8831 Setbacks-Front: 25 Left: 25 Right: 25+ Rear: 93
Building Inspector. BOBBY STONE
Water Dist: VERA
Group Name:
Project Name:
Permits I
I
Building Permit Contractor: OWNER License#: OWNER
BASEMENT U R-3 VB 1,084 RESIDENTIAL PERMIT FEE $1,038.55
Group: R-3 Type `B
COV DECK R-3 VB
160 STATE SURCHARGE $4.50
Building Height 18 GARAGE U-1 VB 440 RESIDENTIAL PLAN REVIEW $415.42
Stories 1 RESIDENCE R-3 VB 1,084 Total Permit Fee: $1,458.47
Dwelling Units 1 Total Value: $107,973.12
FOR BUILDING INSPECTIONS CALL(509)688-0054.
Mechanical Permit
Contractor: OWNER License#: OWNER
GAS WATER HEATER 1 $10.00 GAS APPLIANCE<=100,000BTU 1 $12.00
GAS PIPING 4 $4.00 HEAT PUMP OR NC 0-3 TONS 1 $12.00
VENTILATING FANS 3 $30.00 CLOTHES DRYER I $10.00
GAS LOG OR GAS INSERT I $10.00 HOOD-TYPE II 1 $10.00
Total Permit Fee: $98.00
FOR MECHANICAL INSPECTIONS CALL(509)688-0054.
Contractor: OWNER License#: OWNER
Plumbing Permit
TOILETS/BIDETS 1 $6.00 SINKS 4 $24.00
SHOWERS 1 $6.00 TUBS 1 $6.00
DISH WASHERS 1 $6.00 GARBAGE DISPOSAL 1 $6.00
CLOTHES WASHER 1 $6.00 FLOOR DRAINS 1 $6.00
WATER PIPING-DWV 1 $6.00 WATER USING DEVICES 1 $6.00
Total Permit Fee: $78.00
FOR PLUMBING INSPECTIONS CALL(509)688-0054.
Processed By: KATHY CUMMINGS PERMIT
Printed By: DOMPIER,DAWN Page 1 of 2
BUILDING DIVISION
so1�ane � t
1 1707 E Sprague Avenue Suite 106
Salle Spokane Valley, WA 99206
Project Information
Site Information Inv: 1 Issue Date: 11/30/2004
VER
Site Address: E 24TH AVE
Project Number: 04009059
VERADALE,WA 99037 Permit Use: NEW RESIDENCE W/ATTACHED GARAGE-NAT ,
GAS
Parcel Number: 45263.2108
Permits
Tran Date Recei t# Pamtl_Amt
Total Fees Amo�aid Amou�n 11/3 5968 $1,634.47
$1,634.47 $1,634.47
PERMIT
Processed By: KATHY CUMMINGS Page 2 of 2
Printed By: DOMPIER,DAWN
NOTICE
A Spokane Valley Development Permit belongs to the land owner.The permit applicant, by definition, is the property owner or an authorized agent of the
property owner. It is the responsibility of the permit owner that the use decribed on the front of this permit complies with applicable codes and that
required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the
point where inspections are required may necessitate removal of certain parts of the construction at the permit owner's expense. At a minimum, the
following inspections ARE REQUIRED by City Code:
FOOTING-when forms and reinforcement are in place and prior to placement of concrete-all structures, including manufactured homes.
NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane Valley
Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback
provisions lies solely with the permittee-neither the City of Spokane Valley nor its authorized representatives assume any responsibility for the
verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may
require its relocation at the owner's/permittee's expense.
FOUNDATION-when forms and reinforcement are in place and prior to placement of concrete.
SUB SLAB/RADON SYSTEM!PLUMBING-after rough-in with appropriate test and before covering.
MECHANICAL-rough-in of piping (with test),before covering,metal chimneys before concealment,and final.
PLUMBING-ROUGH IN-when supply and drain piping have been installed, before concealment and with appropriate test
FRAMING - after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to
concealing.
INSULATION-prior to the installation of drywall.
FINAL-when complete and prior to occupancy and/or use. All permits require final inspection.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan)
required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, on-site
drainage ('208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be completed
prior to final approval of a building or issuance of a Certificate of Occupancy.
MANUFACTURED HOMES-Final inspection required when complete, stairs, handrails, skirting, etc.installed, and prior to occupancy,completed
inspection record card must be available on site.
PLUMBING REVERSALS FOR SEWER CONNECTIONS-prior to cover.
RIGHT-OF-WAY/APPROACH-prior to placement of concrete/asphalt or,if gravel approach,after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must be
inspected prior to cover. Check with the Building department for`special inspections"in conjunction with commercial projects.
FOR INSPECTIONS
Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency.
• Building,plumbing(includes interior reversals for sewer)and • Road cuts for utilities or driveways,City of Spokane Valley
Mechanical,City of Spokane Valley Building Division Public Works 869-5373 or State Department of Transportation
688-0054 324-6000
• Permits and inspections for electrical wiring,State Department • Permits and inspections for sewer connection,Spokane County
of Labor and Industries 324-2640 Utilities Division 477-3604
• Permits and inspections for on-site septic systems, Spokane • Fire Sprinkler and alarm systems and private access road
Regional Health District 324-1560 Inspection, Spokane Valley Fire District 928-1700
State law RCW 19.122 requires that prior to any excavation the"CALL BEFORE YOU DIG"center must be notified. Call before you dig at least 2
working days in advance,456-8000.
FLOODPLAIN DEVELOPMENT. All Development within a designated floodplain located in the City of Spokane Valley jurisdiction shall comply with
Article III of the Spokane Valley Uniform Development Code.
PERMIT FEES, EXPIRATION AND REFUNDS
All City of Spokane Valley permit fees shall be established by a City of Spokane Valley Resolution and may be found in Appendix B,Schedule C of the
Spokane Valley Uniform Development Code. Copies of these documents can be obtained on the City's website(www.spokanevalley.org)or within the
City of Spokane Valley's Permit Center.
All permits shall expire by limitation and be declared void if a)work is not started within 180 days of obtaining a permit,or b)work is abandoned for 180
days or more after beginning work, or c)after two years from the date of permit issuance,regardless of whether the work is finished. If a permit is
expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to finish the original permit.
All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee payment.
100%refunds will be granted for any fee erroneously paid or collected.Refunds of not more than 80%of a permit fee may be authorized when no work
has been done under the permit issued. Refunds of not more than 80%of a plan review fee paid may be authorized when an application is withdrawn or
cancelled prior to the plan review being completed.
REFERENCED CODES AND APPEALS
All referenced construction codes are available for review at the City of Spokane Valley Permit Center.Compliance with construction codes is mandated
in the City of Spokane Valley.Any questions,disagreements or disputes generated as a result of city staff decisions shall be directed to the City Building
Official. If the issue remains unresolved,further appeal shall be in compliance with the City of Spokane Valley Uniform Development Code Section
1.20.39.B.