Loading...
2015, 02-25 Permit App: BLD-2015-0334 RemodelSboThane Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 720-5240 Fax: (509) 688-0037 permrtcenter@spokanevalley.org (Staff Use Only) PERMIT NUMBER: PERMIT FEE: RESIDENTIAL CONSTRUCTION PERMIT APPLICATION NEW CONSTRUCTION ADDITION/REMODEL 0 ACCESSORY BUILDING 0 DECK 0 OTHER SITE ADDRESS: /4'i 7/6, r ASSESSORS PARCEL NO.: 1-f SZ (o 1 O(Zd LEGAL DESCRIPTION:Vekx. t3 "-1 E /Z/,79 21- a w 2 -51,13 -S --Pt 6f OWNER/APPLICANT (CHECK BOX, IF MAIN CONTACT: NAME: a �j ,/ ADDRESS: / / .71 & E ( \ V `e Spokes et/al%y PHONE: 5-a 9 g 9 Z / , ( 2. CITY: CONTACT NAME: FAX: STATE: W A Lob % 7 EMAIL: CIOIJ/-•C%� i o4 e1 te. LO%lI PHONE: FAX: PE61}ffQf # eALt -UI S CONTRACTOR NAME (CHECK BOX, IF MAIN CONTACT ❑): Os Ll.) /0 MAILING ADDRESS: CITY: RECEIVED q FEB 2 5 2015 STATE: ZIP: PHONE: FAX: CONTRACTOR LICENSE NO.: EXPIRES: CSV PERMIT CENTER SS ��JJEBBMAIL: � CIT BUSIN EitS No.: R EV. # l`I D SCRIBE THE SCOP F WORK IN DETAIL AND INDICATE USE & PROPOSED US KeenOd e 1 2-- vA./95 frS ba" (oQr?► S , S$? �"'haac,� e-, , The holes 1 v. Ko 4 IA D -F iricts Cr 30 ****YOU MUST COMPLETE THE FOLLOWING**** APPLICABLE Height o ak: DimensionsNo. ,/ of Stories: �- Total Habitable Space: 2. / - Main FI SQ FT: Upper Flo r SQ FT: 1 / �v Unfinished Basement SQ FT: / ZJ Finished Basement SQ FT: /00 Garage Q FT: Deck/Covered Patio SQ FT: ki Impervious Surface Area: f)709- 30% Slopes on Property: 0 No. of Bedrooms: hi Construction Type: 3,/, f Heat Source:W6-F / Sewer or Septic:Seure', TOTAL COST OF PROJECT: $ /DoO DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be equired to •e submitted and subsequently approved before this application can be processed. Signature ,rte Date: T-� Project 46CD-- O'S -cam- 3y RECEIVED FEB 2 5 2015 CSV PERMIT CENTER SUB # r 1 14716 E 24TN AVE SPOKANE VALLEY, WA 99307 FEB 23, 2015 CURRENT LAYOUT SCALE Z" = 1 FT REVIEWED FOR CODE COMPLIANCE SPO BUILDING DIVISION P _. _I a1� REV, r FILE WINDOW 0 CD 0 REVIEWED FOR CODE COMPLIANCE SPO BUILDING DIVISION P _. _I a1� REV, r FILE LED LIGHT 14716 E 24TH AVE SPOKANE VALLEY, WA 99307 FEB 23, 2015 NEW LAYOUT SCALE 3" = 1 FT ,- NEW FAN /1IA 5+e2 -- a1/4f-e• LIGHT/FAN SWITCH (NEW LOCATION) GFCI OUTLET (NEW LOCATION, UPGRADE CIRCUIT) VANITY LIGHTS LED LIGHT pqa i, ".e,, `f'L LIGHT/FAN SWITCH (EXISTING LOCATION) GFCI OUTLET (EXISTING LOCATION, UPGRADE CIRCUIT) VANITY LIG WINDOW • i • • 0 O DEEP MIRROR/CABINET 111 • O /1IA 5+e2 -- a1/4f-e• LIGHT/FAN SWITCH (NEW LOCATION) GFCI OUTLET (NEW LOCATION, UPGRADE CIRCUIT) VANITY LIGHTS LED LIGHT pqa i, ".e,, `f'L LIGHT/FAN SWITCH (EXISTING LOCATION) GFCI OUTLET (EXISTING LOCATION, UPGRADE CIRCUIT) VANITY LIG WORK PLAN: REMODEL OF EXISTING UPSTAIRS BATHROOMS. MAIN BATH WORK WILL CONSIST OF: • REMOVAL OF FIXTURES, DRYWALL AND SUBFLOOR (PARTICLE BOARD SUBFLOOR, NOT 4" PLY SUBFLOOR). • FOR THE FLOORING, NEW OSB, BACKERBOARD AND TILE FLOORS WILL BE INSTALLED. • FOR THE BATH/SHOWER, NEW TUB AND FIXTURES WILL BE INSTALLED. THE SHOWER WALLS AND CEILING WILL HAVE 4" BACKER BOARD AND TILE INSTALLED. • FOR THE WALLS AND CEILING, NEW GREENBOARD WILL BE INSTALLED (i" FOR THE CEILING, 4' FOR THE WALLS). • NEW CABINET, COUNTERTOP, SINK AND FIXTURES. • PLUMBING LOCATIONS WILL NOT CHANGE • TOILET WILL BE RE -INSTALLED. • ELECTRICAL WILL ADD AN LED FIXTURE OVER THE SHOWER, NEW SWITCHES AND THE OUTLET WILL BE UPGRADED TO GFCI. • NEW FAN. z4t'`4'Ave 5 0 fr-4- t o ti -c c r `' 4.)/4 �703r"? R -e- ( 2-s / c." MASTER BATH WORK WILL CONSIST OF: • REMOVAL OF FIXTURES, DRYWALL AND SUBFLOOR (PARTICLE BOARD SUBFLOOR AND 4' PLY SUBFLOOR AS NECESSARY FOR THE PLUMBING ROUGH IN.) • ROUGH IN OF THE BATH, TOILET AND VANITY WILL BE DONE BY A PLUMBING CONTRACTOR. • FOR THE FLOORING, NEW PLYWOOD, OSB, BACKERBOARD AND TILE FLOORS WILL BE INSTALLED. • FOR THE BATH/SHOWER, NEW TUB AND FIXTURES WILL BE INSTALLED. THE SHOWER WALLS AND CEILING WILL HAVE 4' BACKER BOARD AND TILE INSTALLED. • FOR THE WALLS AND CEILING, NEW GREENBOARD WILL BE INSTALLED (8" FOR THE CEILING, 4" FOR THE WALLS). • NEW CABINET, COUNTERTOP, SINK AND FIXTURES. • A NEW TOILET WILL BE INSTALLED. • ELECTRICAL WILL ADD AN LED FIXTURE OVER THE SHOWER, NEW SWITCH LOCATION, ADDITION OF A FAN AND THE OUTLET WILL BE UPGRADED TO GFCI. /P3'e)©g Li) 11