Loading...
2007, 02-22 Permit App: 07000506 Pole BldgProject Number: 07000506 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Date: 2/22/2007 Page 1 of 2 Permit Use: 40X40X16 POLE BLDG Setbacks: Front Site Information: Left: Right: Rear: Plat Key: Name: Range Contact: T K ENTERPRIZE Address: PO BOX 18181 C - S - Z: SPOKANE, WA 99208 Phone: (509) 465-9094 Group Name: Project Name: .,G m District: East Parcel Number: 45264.0125 SiteAddress: 14810 E 24TH AVE Block: Location:: CSV Zoning: UR -7* Urban Residential -7* Water District: 010 VERA Lot: Owner: Name: MARRA, SANDRA K Address: 14810 E 24TH AVE SPOKANE VALLEY, WA 99037 Hold: ❑ Area: .98 Acres Width: 0 Depth: 0 Right Of Way (ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information Review Building Plan Review Landuse/Zoning/HE Conditions Permits: Operator: JD Printed By: JD Print Date: 2/22/2007 Proj ect• Number: 07000506 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 2/28/2007 Project Information: Permit Use: 40X40X16 POLE BLDG Setbacks: Front Left: Right: Rear: Site Information: Plat Key: Name: Range Page 1 of 2 Contact: T K ENTERPRIZE Address: PO BOX 18181 C - S - Z: SPOKANE, WA 99208 Phone: (509) 465-9094 Group Name: Project Name: pw �g; p_ � w_ _�. _ A District: East Parcel Number: 45264.0125 Block: SiteAddress: 14810 E 24TH AVE Location:: CSV Zoning: UR -7* Urban Residential -7* Water District: 010 VERA Area: .98 Acres Width: 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Lot: Owner: Name: MARRA, SANDRA K Address: 14810 E 24TH AVE SPOKANE VALLEY, WA 99037 Hold: ❑ Depth: 0 Right Of Way (ft): 0 Review Building Plan Review Released By: Originally Released: Landuse/Zoning/HE Conditions Permits: 2/23/2007 By: TMELBOU Released' By: Originally Released: 2/23/2007 By: mharnois Operator: JD Printed By: JD Print Date: 2/28/2007 Project: Number: ,07000506 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 2/28/2007 Page 2 of 2 Contractor: T K ENTERPRIZE Address: PO BOX 18181 SPOKANE, WA 99208 Description Grp Type Notes POLE BDLG U-1 VB Item Description RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSBC SURCHARGE Notes: ,_ _ Payment Summary: Permit Type Building Permit Building Permit Firm: T K ENTERPRIZE Phone: (509) 465-9094 This Application: Total Project: Sq Ft Valuation Sq Ft Valuation 1,600 $30,400.00 1,600 $30,400.00 Totals: 1,600 $30,400.00 1,600 $30,400.00 Units Unit Desc 1 1 1 SELECT SELECT SELECT Permit Total Fees: Fee Amount $451.85 $112.96 $4.50 $569.31 Fee Amount Invoice Amount Amount Paid Amount Owing $569.31 $569.31 $569.31 $569.31 $0.00 $569.31 $0.00 $569.31 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or Local laws or ordinances. Signature: Operator: JD Printed By: JD Print Date: 2/28/2007 , Project Number: 07000506 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 2/22/2007 Contractor: T K ENTERPRIZE Address: PO BOX 18181 SPOKANE, WA 99208 Description Grp Type Notes POLE BDLG U-1 VB Item Description RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSBC SURCHARGE Building Permit Page 2 of 2 Firm: T K ENTERPRIZE Phone: (509) 465-9094 This Application: Su Ft Valuation 1,600 $30,400.00 Total Project: Sq Ft Valuation 1,600 $30,400.00 Totals: 1,600 $30,400.00 Units 1 1 1 Unit Desc SELECT SELECT SELECT Permit Total Fees: Notes - tel,:., AHI :. Payment Summary: ..,, agiorm _ Permit Type Building Permit Fee Amount Invoice Amount $569.31 $569.31 1,600 $30,400.00 Fee Amount $451.85 $112.96 $4.50 $569.31 Amount Paid Amount Owing $0.00 $569.31 $569.31 $569.31 $0.00 $569.31 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: JD Print Date: 2/22/2007 Spokane Community Development Residential Construction Permit Application Permit Center 11707 E Sprague Ave, Suite 106 Spokane Va11e3i, WA 99206 (509)688-0036 FAX: (509)688-0037 www.spokanevallev.org FEB 2 PERMIT NUMBER: PERMIT FEE: ❑ New Construction E Addition/Remodel ❑ Other: Accessory Bldg ❑ Deck SITE ADDRESS: 14 810 F. 24 'Ave 5Po1W4NE Vieica.t Y, WA 9?o3 7 ASSESSORS PARCEL NO: VS,26 9/. 0/25- LEGAL DESCRIPTION: Building Owner: DIMENSIONS:,# y0'yo'xl& x Name: `rank /%%arr.t TOTAL HABITABLE SPACE: Address: pig/0 „AI ¢ Xt/G 2"" FLOOR SQ. FTG: NjA City:�pokane Voaky State: wit, Zip: 99037 Phone: X90 - 3893 Fax: GARAGE SQ. FTG: ma Contact Person Name: //raVl5 young Phone: 230 -1290 Describe the scope of work in detail: Contractor: DIMENSIONS:,# y0'yo'xl& x Name: Tx Ernie, pme TOTAL HABITABLE SPACE: Address: ito.60x /$/8 / 2"" FLOOR SQ. FTG: NjA City: 5/0 Kane State: w� Zip: 9rlteg Phone: 4/6 c_ To 9 v Fax: GARAGE SQ. FTG: ma Contractor Lic No:Exp TON TK ' E 9 -rt, Date: 30% SLOPES ON PROPERTY: City Business Lic. No: CONSTRUCTION TYPE: Post Frame Cost of Project: $ L./0'v Vo'x /l,' P I- Frame Shop Proposed Use: S h, **************The followin MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: DIMENSIONS:,# y0'yo'xl& x OF STORIES: TOTAL HABITABLE SPACE: MAIN FLOOR TO SQ. FTG: 2"" FLOOR SQ. FTG: NjA UNFIN BASEMENT SQ. FTG: N/A IMPERVIOUS SURFACE AREA: FINISHED BASEMENT SQ. FTG: GARAGE SQ. FTG: ma DECK/COV. PATIO SQ. FTG: 30% SLOPES ON PROPERTY: # OF BEDROOMS: N/A CONSTRUCTION TYPE: Post Frame HEAT SOURCE: N/A SEWER OR SEPTIC? N1/41 The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. SIGNATURE: Method of Payment: 0 Cash Bankcard #: Authorized Signature: REVISED 2115107 0 Check DATE: 02/.2.2/0 7 ❑ Mastercard 0 VISA Expires: VIN#: Wane galley 11707 E Sprague Ave Suite 106 0 Spokane Valley WA 99206 509.921.1000 ♦ Fax: 509.921.1008 ♦ cityhall@spokanevalley.org Residential Plan Submittal Minimums ❑ Completed Building & Mechanical application with: Accurate address, Parcel Number and/or Legal Description, description of work, owner and contractor information, signature, and date. Two sets of plans including Site Plan, elevations, floor plans, foundation plans With details, roof plan, framing plans & details. ❑ Show the height of any proposed buildings or accessory structures. ❑ Floor plan for each floor. Dimension to scale (minimum 1/8") and label each Room (including sq. footage of house and garage on plans) Show each level of existing house and square footage of any additions. ❑ All braced wall panel types: show locations and details of installation, including engineered design. ❑ Egress windows: Provide at least one window or exterior door approved for Emergency escape or rescue from a basement and in every room for sleeping. ❑ Smoke detector locations ❑ 22" X 30" attic access location ❑ 18" X 24" crawl space access: ❑ One-hour separation detail: between house and garage ❑ Floor framing details: Joist type, size, spacing and installation details ❑ Roof framing plan and details ❑ Fumace and hot water heater location. ❑ All header locations: type, size, and connections ❑ Foundation plan ❑ Insulation information TREATED POST - 16c1 GAL V, NAILS (TIE 't 2' X 6' GIRT (FLAT) 1 TYPICAL GIRT CONNECTION NOTES FOR FLOOR PLAN S INTERIOR FRAME WOOD POSTS, SEE POST SCHEDULE THIS SHEET GABLE WALL POSTS - 6' X 6' TYPICAL DOOR POSTS - 4' X 6' TYPICAL FOOTING DIMENSIONS, B + 1' 8'1 D = 3' 0' MAXIMUM POST SPACING 12' 0' C3 PURLINS @ 24' D.C., BEARING OR JOIST HANGERS (TYPICAL) rJ o • O 1 s-1 (U d 14- / (.1 -Q IX_ a_ la • a'W1 CD C, o V0J . p.-. 0 o xJ 61 )CW 1 • W CU ti 0-1 NV) W0 La LI jr) D v D a _cr -4 / J /- Zi -,I -co- -a 00 M Naf1 -.a_ z-1 A 3 J} IXN JU E- a. 1 • , o U (a�C] 0 00 1 1 1/4.0 di 1 x Lj e, x, 2v (U :�O Pi RI W GU ‘r cu.-. W v VI D V) et/ /_ / / S 1- z w -J SPANS 12' TO 60' EACH GIRT DOUBLE TRUSSES �,�s� DOUBLE TRUSSES A SINGLE TRUSS PLAN VIEW N.T.S. PURLIN CONNECTION METHODS' A). PURLINS MAY BE HUNG OFF THE TRUSS TOP CHORD FACES W/ STANDARD SIMPSON JOIST HANGERS OR EQUAL. B), PURLINS MAY BE BUTTED AND NAILED W/(2) 16d NAILS INTO EACH PURLIN, C). PURLINS MAY BE LAPPED AND NAILED W/(3) 16d NAILS ON CONNECTION METHODS 'B' AND 'C', TOENAIL BACK SIDE OF PURLIN W/(1) 16d NAIL INTO EACH TOP CHORD MEMBER NOTES FOR CONNECTION DETAI' 0 TRUSS TOP CHORDS TRUSS DESIGN BY TRUSS 9UFACTURER S2 PURLIN SUPPORT STRUT 2 '4' X FULL PlttIN DEPTH DF TOP CHORD PLLPURLIN. -ETNOD NAfcrION NAIL PURLINS W/(3) 16d ILS SEE DETAIL NOTES FOR SECTION A -A 11 TYPICAL PURLIN, SEE FLOOR PLAN FOR SIZE S2 TRUSS DESIGN BY OTHERS 0 2' X 6' @ 24' O.C., 10' BAYS 2' X 6' @ 24' O.C., 12' BAYS DF -L #2 GIRTS FLAT @ 24' O. C. CONCRETE FOOTING, SEE SCHEDULE EXTEND POST TO TOP OF PURLIN ROOF FASTENED TO PURLINS WITH 1 1/2' LONG WDODFAST TEKS. WALLS FASTENED TO GIRTS WITH 1' LONG WODDFAST TEKS, S4 S5 SEE FOOTING DETAIL BUILDING SECTION A -A N,T.S. 41) 12 ,iissa Sas_ 1 1 1 20' 0' MAXIMUM 1�1 SINGLE OVERHEAD DOOR OPTION FRONT ELEVATION N.T S. NOTES FOR FRONT ELEVATION S1 HALF TRUSS DESIGN BY OTHERS SUPPORT PURLINS @ END TRUSS W/2' X 6' OR 2' X 8' STD JOIST HANGERS, LOWER TRUSS FOR END OVERHANG, IF REQ'D S2 2' X 10' HEADER 03 2' X 6' GIRTS @ 24' O.C., 10' BAYS, DF -L #2 2' X 6' GIRTS @ 24' O.C., 12' BAYS, DF -L #2 S4 2' X 8' FACIA BOARDS S5 TREATED WOOD POSTS, SIZED PER SCHEDULE S6 TREATED 2' X 6' BOTTOM GIRT OR TREATED 2' X 10' BOTTOM GIRT CD NAIL STRUT TO TOP CHORi//(3) 16d NAILS EACH SIDE. S41MANUFACTURED TRUSS. NO11 POSTS 1-1/2' EACH SIDE TO PRODE TRUSS SEAT, 0 WOOD POST, SEE POST/FOING SCHEDULE. 0 4 - 40d GALV, NAILS IN :E -DRILLED HOLES OR 3/4'0 MACHINE BOLT 0 SOLID BLOCKING AT CONNITION POINTS, S8 TYP. PURLIN, SEE FLOOR .AN FOR SIZE S9 2' X 6' OR 2' X 8' TOP :RT fl 4 - 16d NAILS OR 3/4'0 BOLT DETAIL 1 - TRUSS COLUMN CONNECTION, PURLIN SUPPORT N,T.S. .1 (v 1" u 1601 NAILS 6", 8" DR 10" POST NAILING PATTERN FOR POST LAMINATIONS NOTE: 2" X;;6" LAMINATE MUST BE A TREATED MEMBER AND MUST EXTEND TO THE BOTTOM OF' THE FOOTING. LAMINATE MAY BE SPLICED ABOVE MID HEIGHT OF COLUMN NOTES FOR FOOTING DETAIL S. TREATED POSTS AS SIZED PER SCHEDULE 2 VIBRATE OR ROD CONCRETE TO OBTAIN FULL BEARING i) UNDISTURBED SOIL FOOTING DETAIL 8 - 16d NAILS N.T.S. GABLE END TRUSS 2' :.X 6' X 18' BDL'TING BLOCK 2' l( 6' X 18' BOLTING BLOCK DOUBLE OVERHEAD DOOR OPTION OPTIONAL FRONT ELEVATION N.T.S. SINGLE SLIDING DOOR DP -TION OPTIONAL FRONT ELEVATION N.T.S. 3068 MANDUOR OPTION OPENING lP•m OPTIONAL FRONT ELEVATION N.TS. - 16d NAILS CORNER POST - 16d NAILS DETAIL 3 TYP. GABLE END TRUSS CONNECTION USE BOLTING BLOCKS BELOW ALL CORNER COLUMN GIRTS SPLIT SLIDER DOOR OPTION OPTIONAL FRONT ELEVATION N.T.S NOTES FOR OPTIONAL FRONT ELEVATIONS SS HALF TRUSS DESIGN BY OTHERS S2 2' X 10' HEADER UP TO 12' 0' DOORS 2' X 12' HEADER UP TO 20' 0' DOORS 2' X 12' BACKED WITH 2' X 6' UP TO 24' 0' S3 2' X 6' HEADER co 4' X 6' DOOR POST - 8' THRU 14' WALL HEIGHT W/ 2' X 6' FACER. 6' X 6' DOOR POST - 16' & 18' WALL HEIGHT W/ 2' X 8' FACER. CIF.:0 DOUBLE 2' X 6' KINGPOST NOTES FOR DETAIL 2- KNEEBRACE SS TRUSS TOP CHORD, DESIGN BY OTHERS S2 TRUSS BOTTOM CHORD, DESIGN BY OTHERS S3 2' X 6' DF -L 112 EACH SIDE co WOOD POST, SEE POST/FOOTING SCHEDULE SS 4 - 16d GALV. NAILS, EACH SIDE 1). KNEE BRACE REEQUIRED WHERE SHOWN DN POST/FOOTING SCHEDULE, BRACE NOT REQUIRED AT GABLE END TRUSSES. 2). ALTERNATE KNEE BRACE/POST AND TRUSS/POST CONNECTION = USE 3/4'0 THRU BOLTS, EACH LOCATION, DETAIL 2 - KNEE BRACE N.T.S. BUILDING SPECIFICATIONS: GENERAL - ALL BUILDING CONSTRUCTION SHALL CONFORM TO THE 2003 EDITION OF THE INTERNATIONAL BUILDING CODE (IBC 2003), AND ALL STATE & LOCAL BUILDING CODES. THESE SPECIFICATIONS AND PLANS ARE INTENDED FOR USE IN 30 OR 40 PSF LIVE LOAD, 85 MPH WIND SPEED, EXPOSURE B AND SEISMIC DESIGN CATEGORY C. DESIGN LOADS - ROOF LL = 30 OR 40 PSF ROOF DEAD LOAD = 5 PSF* CEILING LL = 0 PSF CEILING DL = 1 PSF * ROOF DL ALLOWS FOR A MAXIMUM OF 3" THICKNESS OF FIBERGLASS INSULATION. * MAXIMUM SOIL BEARING PRESSURE = 2,000 PSF MAXIMUM SOIL BEARING PRESSURE IS BASED ON SAND, SILTY SAND, CLAYEY SAND, SILTY GRAVEL AND CLAYEY GRAVEL SOILS OR BETTER. LESSER SOIL CONDITIONS WILL REQUIRE REVIEW AND FOOTING SIZE ADJUSTMENT BY THE ENGINEER. CONCRETE - MINIMUM 28 DAY COMPRESSIVE STRENGTH F'c = 2,000 psl, 4 SACK MIX FOR FOOTINGS. CAST IN PLACE CONCRETE CONSTRUCTION SHALL CONFORM TO ACI 318-99. WOOD - STRUCTURAL LUMBER SHALL CONFORM TO DF -L #2 OR BETTER BY WWPA GRADING RULES. MAXIMUM MOISTURE CONTENT SHALL BE 19% BY WEIGHT. NAILING SHALL CONFORM TO TABLE 2304.9.1 FASTENING SCHEDULE & OTHER APPROPRIATE SECTIONS OF CHAPTER 23 OF THE IBC. ALL NAILS INTO PRESERVATIVELY TREATED WOOD SHALL BE HOT -DIPPED ZINC COATED GALVANIZED STEEL, SILICONE BRONZE, COPPER OR STAINLESS STEEL. CCA TREATED WOOD SHALL CONFORM TO THE REQUIREMENTS OF AWPA STANDARDS C-16, C-22, C-23, C-24 & C-28. POSTS FOR BUILDINGS SHALL BE AS NOTED ON THE PLANS. ALL POST MATERIALS SHALL BE HEM -FIR #2 OR BETTER, FULL DIMENSION AND GRADED DY WWPA GRADING RULES. HARDWARE SHALL BE SIMPSON OR APPROVED EQUAL. ALL BOLTS SHALL CONFORM TO ASTM A307. METAL PANELS MAY BE DELTA RIB STYLE, GALVANIZED OR PAINTED, 29 GAUGE THICKNESS, ASTM A653 STRUCTURAL QUALITY (SQ), Fy = 80.0 ksl. ROOF PANELS SHALL BE FASTENED TO PURLINS WITH PLATED, GASKETED 1 1/2" LONG METAL TO WOOD FASTENERS. WALL PANELS SHALL BE FASTENED TO GIRTS WITH PLATED, GASKETED 1" OR LONGER METAL TO WOOD FASTENERS. PANELS SHALL BE INSTALLED AND FASTENED ACCORDING TO THE MANUFACTURER'S RECOMMENDATIONS. SOIL COMPACTION - ALL BACKFILLED SOIL BENEATH FOOTINGS SHALL BE COMPACTED WITH A VIBRATORY COMPACTOR TO 95% OF THE PROCTOR DENSITY AS DETERMINED BY ASTM A1557, METHOD D. TRUSSES SHALL BE DESIGNED BY AND BEAR THE SEAL OF AN ENGINEER REGISTERED TO PRACTICE IN THE STATE IN WHICH THE BUILDING WILL BE CONSTRUCTED. TRUSS LOADING: TOP CHORD LIVE LOAD = 30 OR 40 PSF TOP CHORD DEAD LOAD = 5 PSF BOTTOM CHORD DEAD LOAD = 1 PSF TRUSS WEB BRACING INTERIOR OR GABLE END TRUSSES NOTES FOR TRUSS WEB BRACING:- - TRUSS DIAGRAMS WILL OFTEN REQUIRE WEB MEMBER BRACING, WHICH IS SHOWN ON TRUSS DRAWINGS IS THE METHOD OF TRUSS WEB BRACING SHOWN ABOVE REPLACES 1' X 4' OR -2' X 4' WEB. MEMBER BRACING FOLLOW THESE INSTRUCTIONS FOR ALL WEB MEMBER BRACING TO REPLACE 'RAT -RUN' WEB 10d NAILS 2 6' D.C. ' X 6' OR 2' X 8' L -BRACE Od NAILS @ 6' O.C. ' X 4' L -BRACE TRUSS WEB MEMBER TRUSS WEB MEMBER SECTION B -B SECTION B -B AT INTERIOR TRUSSES AT GABLE END TRUSS SI TYPICAL ®BUSS BOTTOM CHORD BRACING NOTES FOR TRUSS BOTTOM CHORD BRACING S1 GABLE END TRUSS S2 DOUBLE INTERIOR TRUSSES S3 2' X 4' X -BRACING @ 10' 0' O.C. S4 2' X 4' BOTTOM CHORD BRACING @ 10'-0' 0.C, OR, AS SPECIFIED BY TRUSS MANUFACTURER S5 TOENAIL BRACES TO TRUSSES WITH 3 - 10d NAILS SLIDING DOOR OPENING TYPICAL SIDE ELEVATION N.T.S. NOTES FOR SIDE ELEVATION S1 2' X 8' HEADER S2 2' X 10' HEADER FOR 10' & 12' SLIDING DOORS 2' X 8' HEADER FOR 8' & SMALLER SLIDING DOORS N.T.S. SHEATHING REOUIRMENTS THE FOLLOWING MINIMUM ROOF DIAPHRAGM REQUIREMENTS ARE NEEDED' ■ ROOF STEEL' 29 GAUGE GRAND -RIB III, 36' WIDTH OR EQUIVALENT ■ FIELD SCREWS! #10 x 1 1/2' AT 9' O.C. <NEXT TO HIGH RIB) ■ EAVE AND RIDGE PURLIN SCREWS. #14 xl 1/2' AT BOTH SIDES OF EACH MAJOR RIB THE FOLLOWING MINIMUM ENDWALL DIAPHRAGM REQUIRMENTS ARE NEEDED' ■ ENDWALL STEEL, 29 GAUGE GRAND -RIB III, 36' WIDTH OR EQUIVALENT ■ FIELD SCREWS' #10 x 11/2' 6 9' D.C. (NEXT TO HIGH RIB) at BASE GIRT, END TRUSS, AND DOOR HEADER SCREWS, #14 x 1 1/2' € BOTH SIDES OF EACH MAJOR RIB. DIAPHRAGM SCREWS EENDWALLM UUR HEADERENDWALL. LEAENDGTRUSACROSS CHORD, EAVE & RIIDGE PURLINS ON ROOF NNTED A OVEREI Sl TYPICAL SCREW PATTERN, EXCEPT AS POST/FOOTING SCHEDULE 12 - 24' SPANS, 30 & 40 PSF LIVE LOAD POST COLUMN FOOTING KNEE BRACE CONCRETE SPACING WXD "B" DIA. REQUIRED VOLUME, YD3 10'-0" 10'-0" 10'.0" 10'-0" 10'-0" 10'-0" 10,-0" 10'-0" 17-0" 14'-0" 16'-0 18'-0" 20'-0" 6" X 6" 6" X 6" 6"X6" 6"X6"W/2"X6" 6"X 8" 6"X10" 6" X 10" 18" 18" 18" 18" 20" 20" 21" 3'-0" 3'-0" 3'-0" 3%0" 3'-0" 3'-0" 3%0" NO NO NO NO NO NO NO 0.20 0.20 0.20 0.20 0.24 0.24 0.27 124" 124' 12-0" 12-0"_ - 12-0" 12'4" 8'4" 10'4" 12'-0" 14'4" 16'0" 18'-0" 20'4" 6" X 6" 6"XS" 6"X6"W/2"X6 6"X6"W/2"X6" 6" X 8"'P112" X 6" 6" X 8" W/2" X 6" 6" X 10" W/2" X 6" 26" 26" 26" 26" 26" 26" 26" 3,4" 3'-0" 3'-0" 3%0" 3,-0" 3'" 3'-2" NO NO NO NO NO NO NO 0.41 0.41 0.41 0.41 0.41 0.41 0.44 POST/FOOTING SCHEDULE 30' SPANS, 30 & 40 PSF LIVE LOAD POST COLUMN FOOTING KNEE BRACE CONCRETE SPACING "H" WXD "B" DIA. REQUIRED VOLUME, YD3 10'-0" 10'4' 10'4" 10'-0" 10'-0" 101.0 10'-0" 10'4" 10'-0" 8'4" 10'-0" 12'4" 14'-0" 16'4" 18'-0" 20'-0" 27-0" 24'-0" 6" x 6" 6"X 6" 6" X 6" W/2" X 6" 6"X6"W/2"X6" 6"X 8" 6" X 8" W/2" X 6" 6"X8"W2"X 6" 6" X 10" W/2" X 6" 6" X 12" 26" 26" 26" 26" 26" 26" 26" 26" 26" 3,-0" 3'-0" 3'-0" 3%0" 3'-0" 3'-0" 3'-0" 3'-2" 3,-0" NO No NO NO NO NO NO NO NO 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.44 0.46 12-0" 12-0" 12-0" 12-0" 12-0" 12.0" 12-0" 124" 124" 8'4" 10'4" 12'-0" 14'-0" 16'4" 18'-0" 20'-0" 22'4" 24'4" 6" X 6" 6" X 6" 6"X6"W/2" X6" 6" X 8" 6" X 8" W/2" X 6" 6"X 10" 6" X 12" 6" X 12" W/2" X 6" 6" X 12" 28" 28" 28" 28" 28" 28" 28" 28'- 3,-0" 3'-0" 3'-0" 3'-0" 3'-0" 3'-0" 3'-0" 3'-2" 3,-0, NO NO NO NO NO NO NO NO NO 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.6 0.66 POST/FOOTING SCHEDULE 36' SPANS, 30 & 40 PSF LIVE LOAD POST COLUMN FOOTING KNEE BRACE CONCRETE SPACING "H" WXD "B" DIA. REQUIRED VOLUME, YD3 10'4" 10'4" 10'-0" 10'-0" 10'4" 10'-0" 10'0"__ 8'4" 10'-0" 12'-0" 14'4" 16'-0" 18'-0" 20'-0" 22'M" 24'-0" 6" X 6" 6" X 6" 6"X6"W/2" X 6" 6"X6"W/2"X6" 6" X 8" 6" X 8"W/2" X 6" 6" X 10" 6"X10"W/2"X 6" 6"X10"W/2"X 6" 28" 28" 28" 28" 28" 28" 28" 28" 28" 3'-0" 3'-0" 3'-0" 3.,p" 3,-0" 3,-0" 3'-0" 3'-0" 3'-2" NO NO NO NO NO NO NO NO YES 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.60 124" 124'" 12-0" 124' 12-0" 124" 124" 124" 12.0" 8'-0" 10'-0" 12'-0" 14'4" 16'4" 18'-0" 20'4" 22'4" -34:13- 6" 4'-0 6" X 6" 6"X 6" 6" X 6" W/2" X 6" 6" X 8" 6"X8"W/2"X 6" 6" X 10" 6" X 10" W/2" X 6" 6"X12" 6"X12"1/2"X6" 32" 32" 32" 32" 32" 32" 32" 32" 3'-0" 3'-0" 3'-0" 3'-0" 3'-0" 3'-0" 3'-0" 3'3" NO NO NO NO NO NO NO NO 0.62 0.62 0.62 0.62 0.62 0.62 0.62 0.66 0.68 POST/FOOTING SCHEDULE 40' SPANS, 30 & 40 PSF LIVE LOAD POST COLUMN FOOTING KNEEBRACE CONCRETE SPACING WXD "B" DIA. REQUIRED VOLUME, YD3 10'-0" 10%0" 10'-0" 10'4" 10'-0" 10'4" 10'-0" B'-0" 10'4" 12'-0" 14'-0" 16'-0" 16'-0" 18'-0" 20'-0" 22'-0" 24'4" 6" X 6" 6" X 6" 6"X6"W/2"X 6" 6" X 6" W!2" X 6" 6"X8" 6" X 8" W/2" X 6" 6" X 8" W/2" X 6" 6"X10" 6" X 10" W/2" X 6" 6" X 12" 30" 30" 30" 30" 30" 30" 30" 30" 30" 30" 3%0" 3'-0" 3'-0" 3'-0" 3'-0" 3'-0" 3'-0" 3%0" 3'-0" 3'-2" NO NO NO NO YES NO ... NO NO YES 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.68 12-0" 12-0" 12-0" 12-0" 12-0 12-0' '174' 124" 12-0" 8'4" 10'4" 12'4" 14'-0" 16'4" 18-0' 20'-0" 22'4" 24'41- 6" X 6" 6" X 6" 6" X 6" W/2" X 6" 6" X 8" 6"X8"W/2"X6'" 6 X10 6 X1 W12" X 6" 6"X12" --- -- 6" X 12" W/2" X 6" 33" 33" 33" 33" 33" 33" 33" 33' 3'-0" 3'-0" 3%0" 3%0" 3%0" 3'-0" 3•-0" 3'-2" 3'-2" NO NO NO NO NO NO No NO NO 0.66 0.66 0.§6 0.66 0.66 0.66 0.66 0.70 0.72 POST/FOOTING SCHEDULE 48' TO 62' SPANS, 30 & 40 PSF LIVE LOAD POST COLUMN FOOTING KNEE BRACE CONCRETE SPACING WXD "5" DIA. REQUIRED VOLUME, YD3 F1 2!AARi STEEL SHEETING SCREW PATTER4S/,yiu MA a4Ta.81 u w MfiI l OT 110MSBM 10'-0" 10'4" 10'4" 10'-0" 10-0_ 10'4" 10'411- 10'4' 0'-0"10'4" 8'-0" 10'4" 12'-0" 14'-0'' 16'-0" 16'-0" 18'4" 20'4" 27-0" 24'4" 6" X 6" 6" X 6" 6" X 6" W/2" X 6" 6" X 6" W!2" X 6" 6" X 8" 6" X 8" W/2" X 6" 6" X 8" W/2" X 6" 6" X 10" 6"X10"W/2"X6" 6" X 12" W/2" X 6" 34" 34" 34F -- 34" 34" 34" 34" 34" T4" 3'-0" 3'-0" 3'-0" 3'-0" 3'-0" 3'-0" 3'-0" 3'-0" NO NO NO YES NO NO YES NO YES 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 12-0" 12-0" 124" 12-0"" 12-0" 12-0" 124" 12-0- 12-0" 8'4" 10'-0" 17.0" 14'4" 16'4" 18'4" 20'-0" 22'-0".. 24'-0" 6" X 6" 6" X 6" W/2" X 6" 6" X 6" W/2" X 6" 6"X 8" 6" X 8" W/2" X 6" 6" X 10" 6"X 10"W/2" X 6" 6" X 12" W/2" X 6" X 17' W/2" X 6" 36" 36" 36" 36" 36" 36" 36" 36" 36" 3'-0" 3'-0" 3'-0" 3'-0" 3'-0" 3'-0" 3'4" 3'-2" 3'-2" NO NO NO NO NO YES NO NO NO 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.83 0.83 POST/FOOTING SCHEDULE 64' TO 60' SPANS, 30 & 40 PSF LIVE LOAD POST COLUMN FOOTING KNEE BRACE CONCRETE SPACING WXD "B" DIA. REQUIRED VOLUME, YD3 10-0'f 10'-0" - 10.;0"-- 1- 0'M" 10'-0" 1!'-0 ! 112'-0i7 114,-0, 18'-0" 20'4" 24'4" 6" X 6" 6" R 6" 6"X6"W/2"X 8'_ 6" X 8" 6" X 8" W/2"X 6" 6" X 10" 6"X10"W12"X 6" 6" X 12" 36" 36" 36' 36" 36" 36" 36" 36" 3'-0" 3'-0" 3'-0" 3'-0" 3'4" 3'-0" 3'-0" NO NO NO NO NO NO YES NO VES 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.83 124" -124" 124" _124" 124" 12-0" 12-0" 124'' 12-0" 8'-0" 10'4" 12'-0" 14'4" 16'M" 18' 0"- 20'-0" 22 M" 24'4" 6" X 6" 6"X6"W/2"X6" 6" X 8" 6"X8"W/2" X6" 6" X 8" W/2" X 6" 6" X 10" 6" X 10" W/2" X 6" 6"X12"W/2"X6" 6" X 12" W/2" X 6" 40" 40" 40,E 40" 4040" 40„ 40" 40" 3'-0" 3'-0" 3'-0" 3'-0" 3'-0" 3'-0" 3'-0" 3,-0" 3'-2" NO NO NO NO NO YES NO NO NO 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 1.03 NOTE: 1. THE NEXT LARGER SIZE POST MAY BE SUBSTITUTED FOR POSTS WITH 2" X 6" LAMINATIONS. (-(0 2. ENDWALL POSTS SHALL BE 6" X 6" ROUGH CUT HEM -FIR 42 TREATED POSTS UP TO 1 6'-0" WALL HEIGHT. ABOVE 16' WALL HEIGHT, nV11O.JI1j8 231"1FOOTINGS FOR ENDWLL ABPOSTS SHALL BEGA MIINIMUM OFR20 o P2STS. gam a300Ti D P FOL WA L HEIGHTSTO DEEP. ". ABOVE 16' WALL HEIGHT, 4. ABOVE FOOTING DESIGNS ARE FOR POST FRAME BUILDINGS WITH CONCRETE FLOORS (CONTRAINED POSTS). IF BUILDINGS WILL NOT HAVE CONCRETE FLOORS, INCREASE FOOTING D AMETER X 2" & FOOTING DEPTH X 4". EXPIRES 12/29./07 WAMBEKE ENGINEERING Daniel Warlbeke, P. E. 2913 E. 61st Court Spokane, WA 99223 Telephone! 509-443-6186 Fax' 509-448-6582 a -mall dwambeke@msn.com LAYOUT, STRUCTURAL DETAILS AND SPECIFICATIONS POST FRAME BUILDINGS 30 8c 40 PSF LIVE LOAD TK ENTERPRISES P. 0. BOX 18181 SPOKANE. WASHINGTON 99228 BY DRAWN WAMBEKE CHECKED REV BY DATE DESCRIPTION OF CHANGE PROJECT N0. DATE 5 05 06 DRAWING Nal TK ENT.IBC2003-06 2006 SCALE. N.T.S. SHEET, 1 OF 1 REV. PROVIDE DIAGRAMS AND ENGINEERING LAYOUTS FOR ROOF TRUSSES, BEAMS AND FLOOR SYSTEMS PRIOR TO FRAMING INSPECTIONS CITY COPY THIS BUILDING SUBJECT TO FIELD INSPECTION CORRECTIONS REVIEWED FOR CODE COMPLIANCE SPOKANE VALLEY BUIL'G DI ION 5 1/2' 20'-0' TO 40'-0' OUT TO OUT OF BUILDING '_n• m Inn'_n• 2 REQ'D EACH SIDE - NAIL TO EACH PURLIN WITH 10D NAIL PLAN VIEW & ROOF FRAMING PLAN MANUFACTURED TRUSSES 2' X 4' DF -L #2 PURLINS @ 24' O.C. FLAT MANUFACTURED WOOD TRUSSES SPACED @ 4'-0' O.C. LIVE LOAD PSF HEADER SIZE DOOR WIDTH FEET LIVE LOAD PSF HEADER SIZE 6'-0' 30 3 - 2' X 8' DF -L #2 6'-0' 40 3 - 2' X 8' DF -L #2 a 4- c. fYO o.Q 3 - 2' X 10' DF -L #2 8'-0' 40 3 - 2' X 12' DF -L #2 II n n 4 - 2' X 12 DF -L *1 10'-0' 40 4 - 2' X 12' DF -L #2 12'-0' 30 111111111111' MANUFACTUR 'USSES _I 12'-0' 40 1 - 6' X 14' DF -L *1 14'-u' 30 1 - b' X l2' BF -L #1 0 40 1 - 6' X 14" DI- -L *1 PASS DOORS - SIDEWALL & ENDWALL 3'-0' 30 2 - 2' X 8' DF -L #2 3'-0' DOOR HEADER 2 - 2' X 8' DF -L #2 4'-0' 30 2 - 2' X 8" DF -L *2 4'-0' 40 2 - 2' X 8' DF -L #2 6'-0' 30 3 - 2' X 8 DF -L #2 6'-0' 40 3 - 2' X 8' DF -L #2 WINDOWS - SIDEWALL WINDOW HEADER 3'-0' 30 2 - 2' X 8' DF -L #2 3'-0' 40 2 - 2' X 8' DF -L #2 4'-0' 30 2 - 2' X 8' DF -L #2 4'-0' 40 ? - ?' X 8' DF -L #? 5'-0' 30 2 - 2" X 8 DF -L #2 5'-0' 40 MCal vano 30 3 - 2' X 8 DF -L #2 LI o A N c OVERHEAD DOOR OPENING 3 - 2' X 8' DF -L #2 DOER OPENING WINDOW Yr 4'-0 MIN. 3' TO 6' r--1/2' DIA. X 10' A307 6'-0' TO 12'-0' 3' TO 4' r lik kIlk _ _ ACTS AS _ 1 SRl14SE:o - -‘-"Itii — — — , / cl\ 2 REQ'D EACH SIDE - NAIL TO EACH PURLIN WITH 10D NAIL PLAN VIEW & ROOF FRAMING PLAN MANUFACTURED TRUSSES ANCHOR BOLTS @ 48' D.C. SIDEWALL FRAMING PLAN DOOR HEADER SIZES FOR STUD FRAME BUILDINGS 30 PSF & 40 PSF LIVE LOAD ay -i-w c. GObO LIVE LOAD PSF HEADER SIZE DOOR WIDTH FEET LIVE LOAD PSF HEADER SIZE 6'-0' 30 3 - 2' X 8' DF -L #2 6'-0' 40 3 - 2' X 8' DF -L #2 a 4- c. fYO o.Q 3 - 2' X 10' DF -L #2 8'-0' 40 3 - 2' X 12' DF -L #2 II n n 4 - 2' X 12 DF -L *1 10'-0' 40 4 - 2' X 12' DF -L #2 12'-0' 30 1 - 6' X 12' DF -L *1 12'-0' 40 1 - 6' X 14' DF -L *1 14'-u' 30 1 - b' X l2' BF -L #1 14'-0' 40 1 - 6' X 14" DI- -L *1 PASS DOORS - SIDEWALL & ENDWALL 3'-0' 30 2 - 2' X 8' DF -L #2 3'-0' DOOR HEADER 2 - 2' X 8' DF -L #2 4'-0' 30 2 - 2' X 8" DF -L *2 4'-0' 40 2 - 2' X 8' DF -L #2 6'-0' 30 3 - 2' X 8 DF -L #2 6'-0' 40 3 - 2' X 8' DF -L #2 WINDOWS - SIDEWALL WINDOW HEADER 3'-0' 30 2 - 2' X 8' DF -L #2 3'-0' 40 2 - 2' X 8' DF -L #2 4'-0' 30 2 - 2' X 8' DF -L #2 4'-0' 40 ? - ?' X 8' DF -L #? 5'-0' 30 2 - 2" X 8 DF -L #2 5'-0' 40 MCal vano 30 3 - 2' X 8 DF -L #2 LI o A N c OVERHEAD DOOR OPENING 3 - 2' X 8' DF -L #2 DOER OPENING WINDOW 4'-0 MIN. 3' TO 6' r--1/2' DIA. X 10' A307 6'-0' TO 12'-0' 3' TO 4' ANCHOR BOLTS @ 48' D.C. SIDEWALL FRAMING PLAN DOOR HEADER SIZES FOR STUD FRAME BUILDINGS 30 PSF & 40 PSF LIVE LOAD OVERHEAD DOORS - SIDEWALL & ENDWALL DOOR WIDTH FEET LIVE LOAD PSF HEADER SIZE DOOR WIDTH FEET LIVE LOAD PSF HEADER SIZE 6'-0' 30 3 - 2' X 8' DF -L #2 6'-0' 40 3 - 2' X 8' DF -L #2 8'-0' 30 3 - 2' X 10' DF -L #2 8'-0' 40 3 - 2' X 12' DF -L #2 10'-0' 30 4 - 2' X 12 DF -L *1 10'-0' 40 4 - 2' X 12' DF -L #2 12'-0' 30 1 - 6' X 12' DF -L *1 12'-0' 40 1 - 6' X 14' DF -L *1 14'-u' 30 1 - b' X l2' BF -L #1 14'-0' 40 1 - 6' X 14" DI- -L *1 PASS DOORS - SIDEWALL & ENDWALL 3'-0' 30 2 - 2' X 8' DF -L #2 3'-0' 40 2 - 2' X 8' DF -L #2 4'-0' 30 2 - 2' X 8" DF -L *2 4'-0' 40 2 - 2' X 8' DF -L #2 6'-0' 30 3 - 2' X 8 DF -L #2 6'-0' 40 3 - 2' X 8' DF -L #2 WINDOWS - SIDEWALL & ENDWALL 3'-0' 30 2 - 2' X 8' DF -L #2 3'-0' 40 2 - 2' X 8' DF -L #2 4'-0' 30 2 - 2' X 8' DF -L #2 4'-0' 40 ? - ?' X 8' DF -L #? 5'-0' 30 2 - 2" X 8 DF -L #2 5'-0' 40 2 - 2' X 8' DF -L #2 6'-0" 30 3 - 2' X 8 DF -L #2 6'-0' 40 3 - 2' X 8' DF -L #2 5 1/2' X 6' EAVE GIRT - RUSS BLOCKING. NAIL WITH 4 - 16d NAILS 1' X 4' LET -IN BRACE, DR 2' X 16 GAUGE STEEL STRAP NAILED TO EACH STUD WITH 2 REQ'D EACHSSiDE STUD 0' WALL HEIGHT 1/2' DIA. X 10' A30 ANCHOR BOLTS @ 4 D.C. 6' TO le' OPENING 20'-0' TO 40'-0' SPANS TYPICALLEACH CORNER ENDWALL FRAMING PLAN 29 GA, MIN. STEEL ROOFING 12 2' X 4' PURLINS FLAT @ 24' D.C. 2' X 4' TRUSS BOTTOM CHORD BRACING PER TRUSS MFR, MANUFACTURED TRUSSES 2 48' D.C. SIMPSON 1-12 HURRICANE TIE DOUBLE 2' X 6' TOP PLATE 1' X 4' EAVE GIRT - ACTS AS TRUSS BLOCKING. NAIL TO TRUSSES WITH 3 - 16c1 NAILS 2' X 6' STUO-S _2 24' O.C. 1' X 4' FLAT GIRTS @ 60' D.C. 29 GA. STEEL SIDING 2' X 6' TREATED BASE oZ �r 1 4' MIN. CONCRETE FLOOR ........................................................................................................................................................ ............. Minimum depth for frost protection in the City of Spokane Valley is 24 inches measured from the bottom of the footing to finish grade. Grade slope away from building a minimum 6 inches in first 10 feet. 1'-4j TYP. SPECIFICATIONS: Structural design sh (IBC 2003) & th Design Load Roof' ( 5 SI snow) live load 30 PSF or 40 PSF Ismic Design Category C Wind Speed 85 MPH, Exposure B Excavations & Backfill' Remove all rubbish, organic matter and deleterious material from the site. Place compact structural backfill in any over excavated footing areas. Foundations: Footing bearing pressures are Limited to 2,000 PSF. Footings shall bear on undisturbed Inorganic soil or well compacted structural fill capable of supporting the pressure Indicated above) contractor & owner to verify prior to construction. Structural fill is defined as granular material with no more that 15% passing a #200 sieve. Place backfill In shallow lifts not exceeding 6' and compact to 95X Modified Proctor density. Concrete' Concrete shall attain a minimum compressive strength F'c = 2,500 psi at 28 clays. Additions to the mix shalt not be made at the ,Jobsite. Maximum slump 4') minimum slump 2'. Concrete shall contain a minimum of five bags Portland cement per cubic yard. Concrete shall be formed, poured cured & finished according to Chapter 23 of the IBC. Reinforcing Steel' Deformed bars shall conform to ASTM A615, Grade 40, Fy = 40,000 psi. Minimum concrete cover over bars for concrete in contact with the soil shall be 3'. AU continuous bars shall maintain a minimum lap of 25 bar diameters. Stagger all laps In plan 24'. Anchor Bolts' All anchor bolts shall conform to ASTM A307, Tv = 10,000 psi, Dimension Lumber: All dimension lumber shalt be Douglas Fir -Larch #2 or better. Lumber shall be nailed in accordance with IBC Table 2304.9.1, Plywood: Plywood shall be APA C -DX with exterior glue, thickness as shown. APA rated wafer board or D.S.B. board of equal strength may be substituted for plywood. Connection Hardware' All connection hardware shall be. Simpson Strong Tie or approved equal. Roofing & Siding: All roofing & siding shall be precision roll formed galvanized or galvalume, painted or bare. Raw material shall conform to ASTM A653 (SQ), Grade 80, Fy = 80,000 psl. COMPACT BASE COURSE TYPICAL SECTION @ TRUSS SCALE 3/8' = NOTE: IF BUILDING WALLS ARE SHEETED WITH PLYWOOD OR 0.5.B. BOARD, GIRTS & DIAGONAL BRACING STRAPS MAY BE OMMITTED. LATERAL BRACING REQUIREMENTS WILL BE SATISFIED BY WALL SHEETING. alt conform to the 2003 Edition of' the International Building Code 2003 Edition of the International Residential Code (IRC 2003). 'I • 10 I EXPIRES 12-29-2007 I WAMBEKE ENGINEERING Daniel Wambeke P. E. Spokane61WA C 99223 Telephone, 509-443-6186 Fax' 509-448-6582 e-mail dwambeke@nsn.com STANDARD STUD FRAME BUILDINGS 20' TO 40' SPANS 30 PSF & 40 PSF LIVE IOAD TK ENTERPRISES P. O. BOX 18181 SPOKANE, WASHINGTON 99228 BY A DW 8-15 REV BY DATE ADDED BRACING, TRUSS BLOCKING DESCRIPTION DF CHANGE DRAWN WAMBEKE CHECKED DATE 5-17-06 DRAWING NO., TK ENT.STUD2003 PROJECT NO. 2006 SCALEu3/16' = 1'-0' SHEET' REV. PROVIDE DIAGRAMS AND ENGINEERING LAYOUTS FOR ROOF TRUSSES, BEAMS AND FLOOR SYSTEMS PRIOR TO FRAMING INSPECTIONS CITY COPY THIS BUILDING SUBJECT TO FIELD INSPECTION CORRECTIONS Valley REVIEWED FOR CODE C PLIANCE SPOKANE VALLEY UILDI DIVISION "T^" 3 k 0 7 __