Marietta E 15602 Add - Production/Office
I '
I
~ 'r•' T
i
# 41, 'c}r,
Daro r~ro, Review
Dge Re~e#ved
~ .
' PtpJed6 Name ~ ~ f • _ _ 1T4. LOtS NVa A ~'.~s
STM#DORESS PIARCM:#
~ , .
t - r
Spc~~Q~~ ~`~.~.e ~'~a~ae -l~ .
Add-ess Work #
- - - ~ - Datewndi0ons m4.W
C6l1tacf perSt?S3 ,
, 'FLOOD ZONE -YeS No -
tilg1ffeeI / SumyC?r-'S' / Artb~w% Nflme.
wil'Ctr ~ Addrew
, P-~ ~ ' m g, Con~ot ~~sm
4 _
Dow Su~~it~.~ed Dase-riptied
~
' I~ - -
~ _
- ~
r
ti -
f I = ' -
~
~ I I
- - ~
~
~
I I h
~ - - _
~
I
J - -
I
- - - _ - II
~
~ I
~ - _ ~
~ ~ •
.
' NOTICE OF TRANSMITTAL
,
i
1
ADDRESS IE. ♦IS(a CrL PARCEL #
.
PROJECT QvvtGE #xromo1k PROJECT # ,
,
DESCRiP.
F~ ~ . 4~.y ~ _~:,7
t t~ 5 Y sh{; j •s, 'r~ ~
a{
h ~
~~~{t
o~ia~~s~ r.1~~1oZ-t~~Rrl TCCA140LOealts 0
~i~+M~KY~ 9~~~~~~' ` : • v [ { 4+~ r ~ h~ r ^~q~y~`
~E' r
~ L r~+(y~~' K vi~ +K'~ti~y ♦ ~ ^ '
~C ~ { y!} ♦ twv . ~ T+ {i r ~ K~F"-. nriv
V'~
A/~~ r vxr 1r r^ r ~ y x f'Y'3h"~ r r j.r 't 'ti
TYPE OF CONFERENCE
.~Pre-Application Pre-Construction Other: DATE.
TIME %1-3 d
DOCUMENTS CfRCULATED
DATED REVISED
APPLICATION ~
SiTE PLAN
ORAINAGE PLAN +
LANDSCAPE PLAN ~
Other. %1..ootz
Other
ADDITIONAL INFORMATION
CtRCUTATED TO CIRCULATED BY
SCAPCA-M. Catne Utilities ~
Engineenng ✓ Fire District # ~
~ Nealth Oistnct uberty Lake Sewer Questions? Contact Jeff Forry or:
✓Planning Other
Spokane Counry
DIVISION OF BUILOINGS
West 1303 6roadway Spokane, WA 99260
(509) 456-3675 (office) or (509) 456-4703 (tax)
~
' Page 1
OFFICE OF T8E COIINTY ENC3IN$ER
SPORANE COIINTY, WABHINGTON
Project: Addition-Northern Technoloqies Date 7-1-91
Address: E. 15602 Marietta
Parcel No: 01546-9070 Ref No. B91053
The County Engineering Department has completed a review of
the above referenced project. The following information must be
provided in order for us to proceed with our review.
A) For any new hard surface area, for an asphaltic roof, or
a roof containing HVAC machinery, a drainage plan
J for the site shall be prepared in compliance with
Spokane County "Guidelines for Stormwater Management". At
a minimum the plan must contain:
1. Drainage calculations for stormwater volumes
generated on site.
2. Calculations for total impervious surfaces
contained within the site.
3. Finished grade elevations for structures to be
constructed on site.
4. Finished grade elevations at the top and bottom of
the 208 swale.
5. A typical cross section of the 208 swale.
6. Calculations to justify the number and type of
drywells proposed.
7. Elevation of drywell inlets where applicable.
Bj The subject property is affected by the "Findings and
Order" and the "Conditions of Approval" for the following
land use action:
1. Binding Site Plan No. SSP-21
C) Insufficient information was submitted with the proposal.
We are unable to proceed with our review. We will need
the following before we can proceed:
l. Site Plan.
2. Drainage plan as specified.
D) Utility Condition: Permittee is responsible for arranging
for all necessary utility adjustments or relocation as
required for completion of the improvement.
E) The owner of the property or the authorized
representative must complete and sign Spokane County
Engineers "Acjreement to Pay Fees". This document must be
returned to the County Engineers 4ffice. Plan review will
not be completed until this document is executed. This
document is attached to these comments. Please return
the completed Agreement to your contact person at the
Engineers Department.
,
-
' Page 2
Only after all the information and requirements listed above
are supplied or completed and the necessary review has been
accomplished will your building perm_it be,released.
Your contact person at the County Engineering Department may
be contacted-at 456-3600. Your contact person is Robert Turner.
d
. '
JUN-26-' 91 12: 35 I D: DEPT OF HLI g LD I NGS TEL NO :509-456-4703 ##?55 P01
,..r
NOT CE'OF TRANSMITTAL
- qWWk4
~
ADDRESS E. ~ ~(o CQ PARCEL #
PRO~ECT OVIFA ,4~ ~0%M01k e,rPROJEY ■4,
1 3 M \ 'NN
'Es, ~L l P. ~
D
~ ~ a,~ r ( i
~ti \~au/ ~ - ~ . .ri.w ~ y K `1w }
, ~
~ n r 4~ 9•:`~,n,SS> c~+dt5 4 rh ,
Y`
-Avr sd ry 41 ~ ~l.f~*k~ 'c.{~2 L'>~' ~ t ~ ~ • • ~`y.~ 4 ' o
~ yr~c y f Vi t~ A
~ l~~'T
A~sj1, ryt~ tiS } tYAt~P r ti S
}'4}'{'~' y'
, I
♦ k ~ ~ ti r~~` ~^i.~ } lyf~~ - ~ r~ s~••i.a .3' ryY~f ~ ~~',1,~j~~ r~$ ?Yjks{'~.~v~ r~~ r r~i~ ~ pz frf~ ~r ~
♦ .F~ i'a~ ♦ ~ < w\ 4~, ~~9"'"..ti + r-0E ,a rVC ~ ~ tY J r' t r .r. tit Y !
TrPE oF caNFEaENCE
..~Pre--Application Pre-Constructron , Other• DATE 7 ~ ~ ~ ~ 3y
TIME W' 0
OOCUMENTS CIRCULAYED
DATEO REVISED
ApPLICATIQN ~
SIYF. PCAN.-3/
ORAINAGE PLAPI
LANpSCAPE pLAN ~
Ather. Et~o,,. ~~w..
oU,er: . _ I
AC7D ITl4NaL ! N FORIUlAYION
CIRCUlATEO TO CIACtlIATED 8Y
SCAPCa-M Caine UtiHties
v Engineering ~V Flre Dtstrtct # l ~
✓ Health 0lstnct Liberty Lake Sewer Questions? Contact Jeff Forry or
✓'P'lanntng Other:
Spvksne COunty ~
DIVISION OF BUIl01NGS
~ Z West 1303 8toadway Spokane, wA 99260
~ S (509) 456-3675 (oftice) or (509) 456-4703 (fax~
.
S P n K A N E ;CO LJ N T Y
DEl'ARTMEtiT OF BULD[NCf- • A DIVIS(ON OF TNE PUBI.IC WORKS CaEf'4RTME`7
)AMES L MANISOV C B0 UIRECTOEt OENNIS M SCOTT P E, pIRECTOK
1 RF C.EIVED
, JUL 0 31991
~
; SP4KANE CQUTY EflGINEER
TO: Paul Chase, Fire District No. 1
Jun Mascardo, Division of Buildinqs
Bob Turner, Division of Engineering & Roads
Tom Veljic, Planning Department
~Daryl Way, Health District
1
FRO : Tom Davis, Code Compliance Coordinator
Division of Buildings
DATE: July 2, 1991
RE: July 1, 1991 Pre-Application Conference
East 15602 Marietta Avenue
Enclosed is your copy of the minutes to the referenced meetinq.
Should you have any questions or need additional information, please
feel free to contact me.
TLD:rmd
cc: Mr. Paul Mathews, Pasold Architects
Ms. Mabel Caine, Air Pollution Control Authority
Mr. Dennis Scott, Public Works Department
CODE ENFORCEMENT DIViS10N
WEi T 1303 BRUADWAY * $POKANE, WASHINGTON 99260-0550 0 (50Q) 456-3675
FAX (509) 456-4703
.
~ MINUT$B
' PRE-APPLICATION CONFERENC$
$AST 15602 MARIETTA
PRODIICTION & OFFIC$ ADDITION
JIILY 1, 1991
CALL TO ORDER: The meeting was called to order at approximately
11:30 a.m. by the Division of Buildings Code Compliance Coordinator,
Tom Davis, with the following in attendance.
PERMIT REVIEW PARTICIPANTB:
Paul Chase, Fire District No. 1
Robin Domitrovich, Division of Buildings
Jun Mascardo, Division of Buildings
8ob Turner, Division of Enqineerinq & Roads
Tom Veljic Planninq Department
Daryl, Way, Health District
APPLIGANTS:
Paul Mathews, Pasold Architects, N. 909 Pines Rd
Spokane, WA 99206 (509) 926-5090
r
SCOPEIPROJECT DESCRIPTION:
I. General overview - The owner Northern Technologies is proposing
the construction of a 2,600 square foot office addition on to an
existing assembly and office buildinq. The applicant stated that
they would like to begin construction as soon as possible.
SIIMMARY OF D}3PARTMENTAL REQIIIREMENTS:
I. Planning Department (456-2205)
A. Discussion/Requirements
1. The proposed is located in an I-3 Zone.
2. The proposed is located in Binding Site Plan
BSP-88-21. The correct parcel number for the subject
property is 12542-9139.
3. Please submit a revised site plan illustratinq
setbacks, all existing and proposed landscaping, and label
Pioneer Lane.
4. Based on the information submitted a minimum of 35
parking spaces are required for the proposed. Parking is
calculated by the square.footage of the buildinqs uses,
- 1 -
,
.
.
therefore this number of required parking spaces may be
reduced when the applicant submits the square footages and
uses of the existing and proposed buildings.
5. All traveled surfaces are required to be paved.
B. Permit Release Requirements
1. Please submit a revised site plan as described above
for review and approval.
2. Please submit the usage and square footages of the
proposed and existinq buildings so that the exact number
of required parking spaces can be calculated.
II. Division of Engineerinq & Roads (456-3600)
A. Discussion/Requirement
1. Comments were given to the applicant and the Division
of Buildings by Bob Turner.
2. Please submit a drainage plan for the site that is in
compliance with Spokane County Guidelines for Stormwater
Management.
3. The proposed will have a metal roof therefore, all
roof drainage may qo directly into a drywell.
4. An Agreement to Pay Fees was given to the applicant
during the meeting. The agreement is to be signed by the
owner and returned to the Division of Engineerinq & Roads.
Plan review will not be completed until this document is
executed.
8. Permit Release Requirements
1. Please submit a drainage plan as described above for
review and approval.
2. Please submit a copy of the Agreement to Pay Fees
signed by the owner.
III. Health District (456-6040)
A. Discussion/Requirements
1. The proposed will be connected to Spokane Industrial
Park's water and sewaqe systems.
- 2 -
.
.
2. Please submit an updated critical materials list to
the Division of Buildinqs for review.
B. Permit Release Requirements
1. The Health District will release their portion of the
building permit once it has been applied for.
IV. Fire District No. 1(928-2462)
A. Discussion/Requirements
1. Fire flow for the proposed is 3,500 g.p.m.
2. The existinq hydrants are adequate. The fire district
has no additional requirements.
V. Division of Buildings (456-3675)
A. Discussion/Requirements
1. Plan review has been completed on preliminary plans
by Jun Mascardo.
2. Please submit a floor plan of the existing building so
that the exitinq can be reviewed.
3. Please submit an updated critical materials list to
the Division of Buildings for review.
B. Permit Release Requirements
1. Two complete revised sets of plans addressinq the
items discussed durinq the meeting and other items from
the plan review letter needs to be submitted for review
and approval.
APPLICANT' 8 COMMENTSIACRNOWLEDGEMENR':
The applicant acknowledged that all comments/requirements were
understood and had no further questions at this time regarding
permit requirements.
CORRECTIONB:
To minutea or changes from what appears in the minutes, we should be
notified within one day of your receipt of these minutes.
,
- 3 -
.
~
.
To site plana as required by any or all of the above-listed
departments shall be submitted to the Division of Buildings who will
then distribute accordinqly to those departments.
ADJOIIRNMENT: There beinq no further business, Tom Davis thanked the
applicant and the departments for their participation and reminded
all that he should be contacted if there are any unforeseen problems
which may arise.
The meeting was adjourned at approximately 11:50 a.m.
Copies of Minutes to: All participants
File - East 15602 Marietta Avenue
Production and Office Addition
NOTE TO APPLICANT: Some time ago the County recognized the need to
streamline the building permit system and accordingly initiated
these Pre-Construction Conferences. Comments so far would indicate
these conferences are successful and do enhance the permit system.
As a recent participant, we would appreciate any conuments you miqht
have to further improve the process or, should you have any
questions or concerns regarding your conference, please contact
either Jim Manson, Division of Buildings Director, at 456-3675 or
Dennis Scott, Public Works Director, at 456-3600.
Sincerely,
James L. Manson, Director
Ift
- 4 -
Page 1
DF'FICE OF THE COUIi1TY ENGINSSR
SPOKANS CaQN'Y'Ye WASSINQrTON
Project: Addition-Northern Technoloqies Qate 7-1-91
Address: E. 15642 Marietta
Parcel No: 01546-9070 Ref Na. B91053
The County Engineering Department has completed a reView of
the above referenced grvject. The fsallawing information must be
provided in order for us to proceed with our review.
A) For any new hard surface area, for an asphaltic roof, or
aroof containing HVAC machinery, a drainage plan
for the site shall be prepared in comQliance with
Spok,ane Couxlty "Guideline5 for Stormwater Management". At
a minimum the p3an must contai.n:
1. Drainage calculatians for storn►water volumes
generated an site.
2. Calculations tor total impervious surfaces
contained within the site.
3. Finished grade elevatians for structuxes to be
cvnstructed an site.
4. Fin3.shed grade elevatians at the top and bottam af
the 208 swale.
5. 14► typical cross section of the 208 swale.
6. Calcu lations to just i f y the numbe.r and type of
drywells propased.
7. Elevatian of drywell inlets where applicable.
H) The subject property is affected by the "Findinqs and
Order" and the "Conditions of Apgroval" for the follar,aing
land use action:
1. Bindinq Site Plan No. BSP-21
C) Insufficient informatian was su.bmitted with the proposal.
We are unable ta groceed with aur review. We will need
the fQllowing before we can groceed :
1. Site Plan.
2. Dra inage p lan as spec i f ied .
D) [ltility Condition: Permittee is respvnsible for arranging
fvr all necessary utiZity adjustments or relQCatian as
required for completion of trie improvement.
E} The awner of the property or the authorized
representative must camplete and sigri 5pokane Caunty
Engineers "Arjreement ta Pay Fees". This document must be
returned to the County Eng'irteers Off ice . Flan review wi 11
not be completed until this document is executed. This
dacument is attached to these cvmments. Please return
the c+ompleted Agreement to your contact person at the
Engineers nepartment.
ra~ • 1 .
Page 2
Only after all the information arid requirements listed above
axe supplied or cvmpleted and the necessa.ry revi.ew has been
accompllshed will yvur building permYt be released.
Your contact peraon at the County Engineering Department may
be cantacted at 455-3600. Your contact person is Robert Turner.
~
.
. / • ~
Page 1
OFFICE OF THE COIINTY LNGIN$ffit
SPORAN$ COUNTY, WASHIN(3TON
Project: Addition-Northern Technoloqies Date 7-1-91
Address: E. 15602 Marietta
Parcel No: 01546-9070 Ref No. 891053
The County Engineering Department has completed a review of
the above referenced project. The following information must be
provided in order for us to proceed with our review.
A) For any new hard surface area, for an asphaltic roof, or
a roof containinq HVAC machinery, a drainage plan
for the site shall be prepared in compliance with
Spokane County "Guidelines for Stormwater Manzgement". At
a minimwn the plan must contain:
1. Drainage calculations for stormwater volumes
generated on site.
2. Calculations for total impervious surfaces
contained within the site.
3. Finished grade elevations for structures to be
constructed on site.
4. Finished grade elevations at the top and bottom of
the 208 swale.
5. A typical cross section of the 208 swale.
6. Calculations to justify the number and type of
drywells proposed.
7. Elevation of drywell inlets where applicable.
B) The subject property is affected by the "Findings and
Order" and the "Conditions of Approval" for the following
land use action:
1. Bindinq Site Plan No. BSP-21
C) Insuff icient information was submitted with the proposal.
We are unable to proceed with our review. We will need
the following before we can proceed:
1. Site Plan.
2. Drainage plan as specified.
D) Utility Condition: Permittee is responsible for arranging
for all necessary utility adjustments or relocation as
required for completion of the improvement.
E) The owner of the property or the authorized
representative must complete and sign Spokane County
Engineers "Agreement to Pay Fees". This document must be
returned to the County Engineers Office. Plan review will
not be completed until this document is executed. This
document is attached to these comments. Please return
the completed Agreement to your contact person at the
Engineers Department.
Paqe 2
Only after all the information and requirements listed above
are supplied or completed and the necessary review has been
accamplished will your building permit be released.
Your contact person at the County Engineering Department may
be contacted at 456-3600. Your contact person is Robert Turner.