2009, 11-23 Permit App: 09003720 Remodel Project Number: 09003720 Inv: 1 Application Date: 11/23/2009 Page 1 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: BASEMENT REMODEL Contact: HOLMES,CRAIG D&CATHY D
Address: 11219 E 25TH AVE
C-S-Z: SPOKANE VALLEY,WA 99206-5651
Setbacks:Front Left: Right: Rear: Phone: (509)924-5250
Group Name:
Project Name:
Site Information:
Plat Key: 001393 Name: KOKOMO TOWNSITE(FEES) District: Sout
Parcel Number: 45283.2608 Block: Lot:
SiteAddress: 11219 E 25TH AVE Owner:Name: HOLMES,CRAIG D&CATHY D
Address: 11219 E 25TH AVE
Location::CSV SPOKANE VALLEY,WA 99206-565
Zoning: R-3 SF Res District
Water District: 007 MODEL Hold: ❑
Area: 19,500 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 0
Nbr of Bldgs: 1 Nbr of Dwellings: 1
Review
Building Plan Review Released By:
Originally Released: 11/20/2009 By: tmelbourn
Building Permit
Contractor: OWNER Firm: OWNER
Phone: (000)000-0000
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation
BASEMENT R R-3 VB PLAN 0 $400.00 0 $400.00
REVIEW
Totals: 0 $400.00 0 $400.00
Item Description Units Unit Desc Fee Amount
RESIDENTIAL PERMIT FEE 1 SELECT $69.25
WSBCC SURCHARGE 1 SELECT $4.50
SF PLNS RVW<7999 SQ FT 1 SELECT $27.70
Permit Total Fees: $101.45
Operator: JD Printed By: JD Print Date: 11/23/2009
Project Number: 09003720 Inv: I Application Date: 11/23/2009 Page 2 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Mechanical Permit
Contractor: OWNER Firm: OWNER
Phone: (000)000-0000
Item Description Units Unit Desc Fee Amount
VENTILATING FANS 1 DUCT 1 NUMBER OF $11.00
Permit Total Fees: $11.00
Plumbing Permit
Contractor: OWNER Firm: OWNER
Phone: (000)000-0000
Item Description Units Unit Desc Fee Amount
SINKS 1 NUMBER OF $6.00
CLOTHES WASHER 1 NUMBER OF $6.00
WATER PIPING-DWV 1 NUMBER OF $6.00
Permit Total Fees: $18.00
Notes: 7-7.... a,
Payment Summary: -„,7/7
...:: y: :_ate,,,,. ,.. �
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $101.45 $101.45 $27.70 $73.75
Mechanical Permit $11.00 $11.00 $0.00 $11.00
Plumbing Permit $18.00 $18.00 $0.00 $18.00
$130.45 $130.45 $27.70 $102.75
Disclaimer:
Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information
contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: JD Print Date: 11/23/2009
• Permit Center
Ccrrr 017 11703 E Sprague Ave, Suite B-3 PERMIT NUMBER: 3. Z0
IJponane Spokane Valley,WA 99206 PERMIT FEE:
jValleyv (509)688-0036 FAX: (509)688-0037
www.spokanevalley.org
Community Development
Residential Construction New Construction Accessory Bldg
Permit Application RAddition/&emodee n Deck
Other: /
SITE ADDRESS: 11021 q £ Q� O, a, LC Wil/.61,/ 101 9' 2i
ASSESSORS PARCEL NO: 5eC U�, a& LEGAL DESCRIPTION:
Building Owner: Contractor:
Name:
('a^ :a lr l n Name: 6e/
e
Address: Q1E 77 ,�
Address:
City^O m 6 State:w A Zip-Watt, City: State: Zip:
Phone:Om.Qat,,,p/. ,1 Fax: Phone: Fax:
Qat
U(Y / Contractor Lic No: Exp Date:
Contact Person �-y1 City Business Lic.No:
Name: (%(.0 h II i LJi
Phone: L/36r. /5OlQ/
7` Ce
• se • k in det.1: Costo .Project: ,S
��
Desc be the sc f wo �
1 eft i . ,gilt. / _ipLA i. AL _ —>•1i1i�i1.411 /'' �l�la :1 Z I/ ,
Proposed Use: 1.0± baA� s v qe K�5.
**************The following MUS be complete: (write N/A if not applicable)**********************
HEIGHT T f4EAK: DIMEN O ,:i #OF STORIES: Tf� �A BITABLE SPACE:
ts
MAIN FLOOR TO SQ. 2ND FL"O SQ. F G: UNFINENT SQ. FTG: IMPERVIOUS SURFACE
FTG:/4 k f o A/4 4/I AREA:/!/
FINISHED BASE T GARAGE, . TG: DECK/ .,P IO SQ. FTG: 30% Si_ PES ON
SQ. FTG: %V /v PRO RTY:
#OF BEDROOM : CON CTION TYPE: ATS U C : EWE OR SEPTIC?
5- 17 it a
The permitee verifies,acknowledges and agrees by their signature that: 1 f this permit is for construction of or on a dwelling,the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal,state or
local laws,codes or ordinances.6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can .e processed.
—
SIGNATURE: IN° DATE: f /qIIVED
IVO �/ / SV PERMIT CENTER
Method of Payment:
❑ Cash ❑ heck 0 Mastercard ❑ VISA NOV 1 2009
Bankcard#: Expires: VIN#: c�O
Project#
Authorized Signature: Name__
REVISED 2/15/07
i Submittal #_1----
i__________
RESIDENTIAL CHECK LIST DIRECTIONS:
Place a check mark in box next to each document required for complete submittal.
o SITE PLAN
o Property lines and dimensions ❑ Setbacks to property lines
o Direction arrow pointing North and orientation to streets o Distance between buildings
o Proposed/existing buildings (footprint and dimensions) ❑ Right of way/easement location &sizes
o Utilities, septic tank/drain field locations and distances o Driveway approach size and location
BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned)
❑ Elevations (Front/Rear/Sides)with roof peak and wall height including basement:
❑ Foundation Plan (crawlspace, basement or slab on grade):
o Footing sizes and locations o Supporting wood cripple walls or beams
o Perimeter concrete foundation wall sizes o Thickened concrete pads supporting
o Crawlspace ventilation beams or girder trusses
❑ Floor Plan of each level (finished or unfinished)with dimensions:
o Floor Joist direction, size and spacing ❑Window and door location and sizes
o Header, beam or concrete lintel sizes ❑Window well locations if applicable
o Brace wall panel locations ❑ Room usage labels
o Water heater and furnace locations o Smoke detector locations
o Exhaust fan locations ❑Attic and crawl space access locations
o Deck or concrete patio sizes and locations o Fire Wall construction
❑ Roof Plan:
o Engineered truss direction and spacing o Ridge, eave and valley lines
o Rafter and over frame direction, size and spacing o Beam and girder size and location
❑ Wall Section Detail including:
Roof
o Slope/roofing material/underlayment/ice dam protection o Truss or rafter size, spacing &connection
o Sheathing size and type o Attic insulation/air space baffle/ventilation
Ceiling
o Joist size and spacing o Size of ceiling gypsum wall board
Wall
o Height/top plate/stud size and spacing/sole plate o Siding/exterior house wrap/anchor bolts
o Exterior sheathing size and type o Insulation, vapor barrier, gypsum wall board
Floor
o Joist size and spacing o Sheathing or concrete floor size/insulation
Foundation Wall
o Concrete or Masonry unit width o Footing bottom to finished ground level depth
o Earth to wood separation distance o Horizontal &vertical reinforcement if any
Footing
o Size o Reinforcement if any
Radon
o Passive system with 6mil vapor barrier ❑Active system with 6 mil vapor barrier
Miscellaneous Construction Details
❑ Deck:
o Floor plan/side view/dimensions o Footings/post/and beam size and locations
o Floor Joist/decking direction, size and spacing
O Stairway tread rise &run and nosing 0 Handrail/Guard height &spacing
�/�� Permit Center
®+. 11703E Sprague Ave,Suite B-3
Spokane Spokane Valley,WA 99206 PERMIT NUMBER:
jValleyT (509)688-0036 FAX:(509)688-0037 PERMIT FEE:
Community Development permitcenter@n,spokanevalley.org
Mechanical Permit Application n Commercial Residential
SITE ADDRESS: Y i a'R E 026-026- spo� ✓flatlet,' o)er99QE*
Building Owner
Name: ()fall
- /1 $41:1411
do/mei Phone: 9:09a)61/97 Fax: �y�
Address:` 4/tigt• 6 �1f III!!(JJJ City ���� />.// State: /'A Zip-70l ,�� i �I `� W
Contractor J
Name: ,..5_iloPhone: Fax:
Address: City: State: Zip:
License No: City Business Lic:
Contact/Project Manager:
Name: n`P(e) Phone:
#UNITS
FURNACES&SUSPENDED HEATERS-INSTALLATION OR RELOCATION Up to&including 100,000 BTU
FURNACES&SUSPENDED HEATERS-INSTALLATION OR RELOCATION Over 100,000 BTU
DUCT WORK SYSTEM
HEAT PUMP/AIR CONDITIONER 0-3 TON
AIR CONDITIONER Over 3-15 TON
AIR CONDITIONER Over 15-30 TON
AIR CONDITIONER Over 30-50 TON
AIR CONDITIONER Over 50 TON
GAS WATER HEATER
GAS PIPING SYSTEM(each outlet)
GAS LOG,FIREPLACE,&GAS INSERT
APPLIANCE VENTS INSTALLATION,RELOCATION,REPLACEMENT
REPAIRS OR ADDITIONS
BOILER,COMPRESSORS,ABSORPTIONS SYSTEM 0 to 3 hp-100,000 BTU or less
BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 3-15 hp—100,001 to 500,000 BTU
BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 15—30 hp -500,001 to 1,000,000 BTU
BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 30 hp—1,000,001 to 1,750,000 BTU
BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 50 hp—over 1,750,000 BTU
AIR HANDLER(DOES NOT include ducting) Each unit up to 10,000 cfm,including ducts
AIR HANDLER(DOES NOT include ducting) Each unit over 10,000 cfm
EVAPORATIVE COOLERS(other than portables)
VENTILATION AND EXHAUST Each fan connected to a singe duct
VENTILATION AND EXHAUST Each ventilation system
VENTILATION AND EXHAUST Each hood served by mechanical exhaust
INCINERATORS Installation or relocation of residential
INCINERATORS Installation or relocation of commercial
APPLIANCES .K).,Clothes Washer
UNLISTED APPLIANCES Under 400,000 BTU
UNLISTED APPLIANCES Over 400,000 BTU
HOOD Type I
HOOD Type II
L P STORAGE TANK
WOOD OR PELLET STOVE INSERT
WOOD STOVE SYSTEM—FREE STANDING
EXPIRES: VIN:
DCASH 0 CHECK 0 VISA 0 MC i _
CARD#: SIGNATURE ,.'/� rVI " / s piv +
CSV PERMIT CEN[ER
NOV. 1 2009
P(Ojod`I#3_—S.T--1 - 71-1--t�
http://www.spokanevalley.org/uploads/Community Development/Documents/FormsBuilding/MechanicalPermitAp icption0Nz)me4031`Q,c
Subrr tai # `
Permit Center
11703 E Sprague Ave,Suite B-3 PERMIT NUMBER:
►J�J l�lll Spokane Valley,WA 99206
/S valley (509)688-0036 FAX:(509)688-0037 PERMIT FEE:
I� permitcenter&,,spokanevalley.org
Community Development
Plumbing Permit Application
Applicationfl Commercial
SITE ADDRESS: Iq6 &K6 po64 _ iia,fie,yW99,Q06 Residential
Building Owner n/_ /_n
Name: C! I ' Cq ! /C) /1 L4J Phone:q&ip,( (nlo [r7 Fax:
Address: 5 City: State: Zip:
Contractor $
Name: ) Phone: Fax:
Address: City: State: Zip:
License No: City Business Lic:
Contact/Project Manager
Name: (� Phone:
#OF UNITS
PLUMBING FIXTURE ON A TRAP
TOILETS
URINALS
TUBS
SHOWERS(per trap)
Lav/Basins Bar Floor( ,Laundry,Utility,Janitor,Photo,X-ray,Food,
SINKS 7p�p/Culinary Meat
DISHWASHER
CLOTHES WASHER 1
GARBAGE DISPOSAL
WATER SOFTNER
FLOOR DRAIN Area,Case,Coil,Trench,Condensate
ROOF DRAIN/OVERFLOW DRAINS
FOUNTAIN,DRINKING
WATER PIPING/DRAIN-IN WASTE Installation,Alterations,Repair,Reversals
WATER USING DEVICE Ice and/or Coffee maker,hose bib,steamer proofer,carbonator,swamp cooler
PRIVATE SEWAGE DISPOSAL SYSTEM
WATER HEATER If Gas,See Mechanical
INDUSTRIAL WASTE PRETREATEMENT
INCEPTORS Including traps,vents except kitchen type grease interceptors functioning as fixture traps
REPAIR OR ALTERATION 'ater pipe g, .e-or vent piping
ATMOSPHERIC TYPE VACUUM BREAKER
BACK FLOW PROTECTIVE DEVICE Other than atmospheric type vacuum breakers
MEDICAL GAS.
INCEPTORS
❑CASH ❑CHECK ❑VISA ❑MC EXPIRES:
Card# VIN:
SIGNATURE: ,L /k
Li FL C
CSV PERMIT CEN FEF
LJI ## NOV 1. 2009
ph ule
CURRENT FEES AVAILABLE AT:http://wrww.spokanevalley.orq/under the quick links for Forms,Master Frie SC
i1_me
http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/PlumbingPermitApplicatisr oR
For City Use Only
et
PLUS Project Number vL
CITY OF Prtoject Addresspohne
aile v°
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
aJ 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re-submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure,you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re-
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE-APPLICANT PINK-BUILDING FILE REV 9/07