Loading...
2009, 11-23 Permit App: 09003720 Remodel Project Number: 09003720 Inv: 1 Application Date: 11/23/2009 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: BASEMENT REMODEL Contact: HOLMES,CRAIG D&CATHY D Address: 11219 E 25TH AVE C-S-Z: SPOKANE VALLEY,WA 99206-5651 Setbacks:Front Left: Right: Rear: Phone: (509)924-5250 Group Name: Project Name: Site Information: Plat Key: 001393 Name: KOKOMO TOWNSITE(FEES) District: Sout Parcel Number: 45283.2608 Block: Lot: SiteAddress: 11219 E 25TH AVE Owner:Name: HOLMES,CRAIG D&CATHY D Address: 11219 E 25TH AVE Location::CSV SPOKANE VALLEY,WA 99206-565 Zoning: R-3 SF Res District Water District: 007 MODEL Hold: ❑ Area: 19,500 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 0 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Review Building Plan Review Released By: Originally Released: 11/20/2009 By: tmelbourn Building Permit Contractor: OWNER Firm: OWNER Phone: (000)000-0000 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation BASEMENT R R-3 VB PLAN 0 $400.00 0 $400.00 REVIEW Totals: 0 $400.00 0 $400.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $69.25 WSBCC SURCHARGE 1 SELECT $4.50 SF PLNS RVW<7999 SQ FT 1 SELECT $27.70 Permit Total Fees: $101.45 Operator: JD Printed By: JD Print Date: 11/23/2009 Project Number: 09003720 Inv: I Application Date: 11/23/2009 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Mechanical Permit Contractor: OWNER Firm: OWNER Phone: (000)000-0000 Item Description Units Unit Desc Fee Amount VENTILATING FANS 1 DUCT 1 NUMBER OF $11.00 Permit Total Fees: $11.00 Plumbing Permit Contractor: OWNER Firm: OWNER Phone: (000)000-0000 Item Description Units Unit Desc Fee Amount SINKS 1 NUMBER OF $6.00 CLOTHES WASHER 1 NUMBER OF $6.00 WATER PIPING-DWV 1 NUMBER OF $6.00 Permit Total Fees: $18.00 Notes: 7-7.... a, Payment Summary: -„,7/7 ...:: y: :_ate,,,,. ,.. � Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $101.45 $101.45 $27.70 $73.75 Mechanical Permit $11.00 $11.00 $0.00 $11.00 Plumbing Permit $18.00 $18.00 $0.00 $18.00 $130.45 $130.45 $27.70 $102.75 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: JD Print Date: 11/23/2009 • Permit Center Ccrrr 017 11703 E Sprague Ave, Suite B-3 PERMIT NUMBER: 3. Z0 IJponane Spokane Valley,WA 99206 PERMIT FEE: jValleyv (509)688-0036 FAX: (509)688-0037 www.spokanevalley.org Community Development Residential Construction New Construction Accessory Bldg Permit Application RAddition/&emodee n Deck Other: / SITE ADDRESS: 11021 q £ Q� O, a, LC Wil/.61,/ 101 9' 2i ASSESSORS PARCEL NO: 5eC U�, a& LEGAL DESCRIPTION: Building Owner: Contractor: Name: ('a^ :a lr l n Name: 6e/ e Address: Q1E 77 ,� Address: City^O m 6 State:w A Zip-Watt, City: State: Zip: Phone:Om.Qat,,,p/. ,1 Fax: Phone: Fax: Qat U(Y / Contractor Lic No: Exp Date: Contact Person �-y1 City Business Lic.No: Name: (%(.0 h II i LJi Phone: L/36r. /5OlQ/ 7` Ce • se • k in det.1: Costo .Project: ,S �� Desc be the sc f wo � 1 eft i . ,gilt. / _ipLA i. AL _ —>•1i1i�i1.411 /'' �l�la :1 Z I/ , Proposed Use: 1.0± baA� s v qe K�5. **************The following MUS be complete: (write N/A if not applicable)********************** HEIGHT T f4EAK: DIMEN O ,:i #OF STORIES: Tf� �A BITABLE SPACE: ts MAIN FLOOR TO SQ. 2ND FL"O SQ. F G: UNFINENT SQ. FTG: IMPERVIOUS SURFACE FTG:/4 k f o A/4 4/I AREA:/!/ FINISHED BASE T GARAGE, . TG: DECK/ .,P IO SQ. FTG: 30% Si_ PES ON SQ. FTG: %V /v PRO RTY: #OF BEDROOM : CON CTION TYPE: ATS U C : EWE OR SEPTIC? 5- 17 it a The permitee verifies,acknowledges and agrees by their signature that: 1 f this permit is for construction of or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal,state or local laws,codes or ordinances.6) Plans or additional information may be required to be submitted, and subsequently approved before this application can .e processed. — SIGNATURE: IN° DATE: f /qIIVED IVO �/ / SV PERMIT CENTER Method of Payment: ❑ Cash ❑ heck 0 Mastercard ❑ VISA NOV 1 2009 Bankcard#: Expires: VIN#: c�O Project# Authorized Signature: Name__ REVISED 2/15/07 i Submittal #_1---- i__________ RESIDENTIAL CHECK LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. o SITE PLAN o Property lines and dimensions ❑ Setbacks to property lines o Direction arrow pointing North and orientation to streets o Distance between buildings o Proposed/existing buildings (footprint and dimensions) ❑ Right of way/easement location &sizes o Utilities, septic tank/drain field locations and distances o Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) ❑ Elevations (Front/Rear/Sides)with roof peak and wall height including basement: ❑ Foundation Plan (crawlspace, basement or slab on grade): o Footing sizes and locations o Supporting wood cripple walls or beams o Perimeter concrete foundation wall sizes o Thickened concrete pads supporting o Crawlspace ventilation beams or girder trusses ❑ Floor Plan of each level (finished or unfinished)with dimensions: o Floor Joist direction, size and spacing ❑Window and door location and sizes o Header, beam or concrete lintel sizes ❑Window well locations if applicable o Brace wall panel locations ❑ Room usage labels o Water heater and furnace locations o Smoke detector locations o Exhaust fan locations ❑Attic and crawl space access locations o Deck or concrete patio sizes and locations o Fire Wall construction ❑ Roof Plan: o Engineered truss direction and spacing o Ridge, eave and valley lines o Rafter and over frame direction, size and spacing o Beam and girder size and location ❑ Wall Section Detail including: Roof o Slope/roofing material/underlayment/ice dam protection o Truss or rafter size, spacing &connection o Sheathing size and type o Attic insulation/air space baffle/ventilation Ceiling o Joist size and spacing o Size of ceiling gypsum wall board Wall o Height/top plate/stud size and spacing/sole plate o Siding/exterior house wrap/anchor bolts o Exterior sheathing size and type o Insulation, vapor barrier, gypsum wall board Floor o Joist size and spacing o Sheathing or concrete floor size/insulation Foundation Wall o Concrete or Masonry unit width o Footing bottom to finished ground level depth o Earth to wood separation distance o Horizontal &vertical reinforcement if any Footing o Size o Reinforcement if any Radon o Passive system with 6mil vapor barrier ❑Active system with 6 mil vapor barrier Miscellaneous Construction Details ❑ Deck: o Floor plan/side view/dimensions o Footings/post/and beam size and locations o Floor Joist/decking direction, size and spacing O Stairway tread rise &run and nosing 0 Handrail/Guard height &spacing �/�� Permit Center ®+. 11703E Sprague Ave,Suite B-3 Spokane Spokane Valley,WA 99206 PERMIT NUMBER: jValleyT (509)688-0036 FAX:(509)688-0037 PERMIT FEE: Community Development permitcenter@n,spokanevalley.org Mechanical Permit Application n Commercial Residential SITE ADDRESS: Y i a'R E 026-026- spo� ✓flatlet,' o)er99QE* Building Owner Name: ()fall - /1 $41:1411 do/mei Phone: 9:09a)61/97 Fax: �y� Address:` 4/tigt• 6 �1f III!!(JJJ City ���� />.// State: /'A Zip-70l ,�� i �I `� W Contractor J Name: ,..5_iloPhone: Fax: Address: City: State: Zip: License No: City Business Lic: Contact/Project Manager: Name: n`P(e) Phone: #UNITS FURNACES&SUSPENDED HEATERS-INSTALLATION OR RELOCATION Up to&including 100,000 BTU FURNACES&SUSPENDED HEATERS-INSTALLATION OR RELOCATION Over 100,000 BTU DUCT WORK SYSTEM HEAT PUMP/AIR CONDITIONER 0-3 TON AIR CONDITIONER Over 3-15 TON AIR CONDITIONER Over 15-30 TON AIR CONDITIONER Over 30-50 TON AIR CONDITIONER Over 50 TON GAS WATER HEATER GAS PIPING SYSTEM(each outlet) GAS LOG,FIREPLACE,&GAS INSERT APPLIANCE VENTS INSTALLATION,RELOCATION,REPLACEMENT REPAIRS OR ADDITIONS BOILER,COMPRESSORS,ABSORPTIONS SYSTEM 0 to 3 hp-100,000 BTU or less BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 3-15 hp—100,001 to 500,000 BTU BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 15—30 hp -500,001 to 1,000,000 BTU BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 30 hp—1,000,001 to 1,750,000 BTU BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 50 hp—over 1,750,000 BTU AIR HANDLER(DOES NOT include ducting) Each unit up to 10,000 cfm,including ducts AIR HANDLER(DOES NOT include ducting) Each unit over 10,000 cfm EVAPORATIVE COOLERS(other than portables) VENTILATION AND EXHAUST Each fan connected to a singe duct VENTILATION AND EXHAUST Each ventilation system VENTILATION AND EXHAUST Each hood served by mechanical exhaust INCINERATORS Installation or relocation of residential INCINERATORS Installation or relocation of commercial APPLIANCES .K).,Clothes Washer UNLISTED APPLIANCES Under 400,000 BTU UNLISTED APPLIANCES Over 400,000 BTU HOOD Type I HOOD Type II L P STORAGE TANK WOOD OR PELLET STOVE INSERT WOOD STOVE SYSTEM—FREE STANDING EXPIRES: VIN: DCASH 0 CHECK 0 VISA 0 MC i _ CARD#: SIGNATURE ,.'/� rVI " / s piv + CSV PERMIT CEN[ER NOV. 1 2009 P(Ojod`I#3_—S.T--1 - 71-1--t� http://www.spokanevalley.org/uploads/Community Development/Documents/FormsBuilding/MechanicalPermitAp icption0Nz)me4031`Q,c Subrr tai # ` Permit Center 11703 E Sprague Ave,Suite B-3 PERMIT NUMBER: ►J�J l�lll Spokane Valley,WA 99206 /S valley (509)688-0036 FAX:(509)688-0037 PERMIT FEE: I� permitcenter&,,spokanevalley.org Community Development Plumbing Permit Application Applicationfl Commercial SITE ADDRESS: Iq6 &K6 po64 _ iia,fie,yW99,Q06 Residential Building Owner n/_ /_n Name: C! I ' Cq ! /C) /1 L4J Phone:q&ip,( (nlo [r7 Fax: Address: 5 City: State: Zip: Contractor $ Name: ) Phone: Fax: Address: City: State: Zip: License No: City Business Lic: Contact/Project Manager Name: (� Phone: #OF UNITS PLUMBING FIXTURE ON A TRAP TOILETS URINALS TUBS SHOWERS(per trap) Lav/Basins Bar Floor( ,Laundry,Utility,Janitor,Photo,X-ray,Food, SINKS 7p�p/Culinary Meat DISHWASHER CLOTHES WASHER 1 GARBAGE DISPOSAL WATER SOFTNER FLOOR DRAIN Area,Case,Coil,Trench,Condensate ROOF DRAIN/OVERFLOW DRAINS FOUNTAIN,DRINKING WATER PIPING/DRAIN-IN WASTE Installation,Alterations,Repair,Reversals WATER USING DEVICE Ice and/or Coffee maker,hose bib,steamer proofer,carbonator,swamp cooler PRIVATE SEWAGE DISPOSAL SYSTEM WATER HEATER If Gas,See Mechanical INDUSTRIAL WASTE PRETREATEMENT INCEPTORS Including traps,vents except kitchen type grease interceptors functioning as fixture traps REPAIR OR ALTERATION 'ater pipe g, .e-or vent piping ATMOSPHERIC TYPE VACUUM BREAKER BACK FLOW PROTECTIVE DEVICE Other than atmospheric type vacuum breakers MEDICAL GAS. INCEPTORS ❑CASH ❑CHECK ❑VISA ❑MC EXPIRES: Card# VIN: SIGNATURE: ,L /k Li FL C CSV PERMIT CEN FEF LJI ## NOV 1. 2009 ph ule CURRENT FEES AVAILABLE AT:http://wrww.spokanevalley.orq/under the quick links for Forms,Master Frie SC i1_me http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/PlumbingPermitApplicatisr oR For City Use Only et PLUS Project Number vL CITY OF Prtoject Addresspohne aile v° 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 aJ 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE-APPLICANT PINK-BUILDING FILE REV 9/07