Loading...
1983, 03-24 Permit: 83A-2203 Plumbing FixturesPLAN NUMBER APPLICATION /PERMIT PERMIT NUMBER SPOKANE COUNTY — DEPARTMENT OF BUILDING & SAFETY 65A—x.203 NORTH 811 JEFFERSON / SPOKANE, WASHINGTON 99260 / (509) 456-3675 APPLICANT: COMPLETE NUMBERED SPACES - PRESS HARD TO MAKE 3 COPIES STREET ADDRESS PARCEL NO. 1. //8/`j C a5� LOT I BLOCK I SUBDIVISION LEGAL DESCRIPTION: 2. VVVIV CII rA 4 /"/ osc-0 MAILING ADDRESS 4. -f` "J" .-c ADDRESS 13oZ03 uC DESIGNER 5. ADDRESS ZIP LICENSE EXPIRES PHONE PHONE ZIP North South East I West Size of Parcel Zone Classification Residential❑ Commercial ❑ Type Const. Occupancy Sprinklered ❑Yes ❑No ❑Req'd. New Const. Valuation I Remodeled Valuation I Total Bldg. Floor Area Main Floor I Upper Floors I Garage/ Storage I Greenhouse s CHANGE OF USE FROM TO 11 Cover Deck Uncv. Deck Fin. Basement Unfin. Basement TYPE SLUEW El ALT. 1:1 AD'N. 11 RPL. El MVE. No. Baths No. Floors No. Fin. Rooms No. Dwellings 7. OF ❑ OTHER WORK ❑ BLD. A P -LMB. ❑ MECH. ❑ M.H. ❑ POOL Certifi.ofExempt. or Variance Required Yes El No❑ Received Yes ❑ No ❑ Number DESCRIBE WORK G 9r / Shorelines/ Flood Hazard Yes❑ Not Applic. ❑ Plans Required EI8. Received ❑ VALUATION 9 I SOURCE OF UTILITIES GAS ELECTRIC I WATER PUBLIC ❑ PRIVATE ❑ SEWAGE SEPTIC ❑ SEWER E, Ownership public ❑Private ❑ FEES COLLECTED 1 hereby certify that I have read and examined this application and have read the "NOTICE" provisions included on reverse side, and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give au- Building thority to violate or cancel the provisions of any other state or local law regulating construction or the performance of construction. SEE REVERS IDE FOR REQUIRED INSPECTIONS Plumbing SIGNATURE OF APPLICATION OWNER OR AGENT DATE Mach• SPECIAL APPROVALS SPECIALCONDITIONS: (SEE REVERSE SIDE FOR NOTICE) PRELIM. FINAL DATE Plan Check Env. Health u>G Planning Fire l l 6 Prevent. Engineer PlansPERMIT IS NONTRANSFERABLE Exam. PERMIT IS NULL AND VOID IF WORK HAS NOT COMMENCED Building ---% a5 _ j_ IN 180 DAYS SEPA Modular/ MFG.Home Other (Specify) TOTAL $ WHEN MACHINE VALIDATED IN THIS SPACE, THIS BECOMES A PERMIT. DATE(�4S�UE� — PERMI"6. 0'3 z *41,00+&AL