Loading...
1980, 04-16 Permit: 80-3561 Pole Bldgi APPLICATION/ PERMIT SPOKANE COUNTY — BUILDING CODES DEPARTMENT NORTH 811 JEFFERSON / SPOKANE, WASHINGTON 99260 / (509) 456-3675 TYPE ® NEW 7, OF WORK IN BLD. No. Baths No. Floors No./Rooms Rec. Roo 1-1ALT.ALT. AD'N. RPL. MVE. !/ ❑ OTHER ElPLMB. ❑ MECH: ❑ M.H. ❑ CERTIFICATE POOL Req'd. I Recd. Not Req'd of EXEMPTION LL/ DESCRIBE WORK Construct 36x24 pole -type garage 8. VAL ION Source GAS ELECTRIC WATER SEWER � of 9, a 9& 0O Utilities I hereby certify that I have read and examined this application and have read the "NOTICE" provisions included on reverse side, and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or local law regulating co struction or the performance oaf/construction. DATE 7 —�H �� SIGNATURE SPECIAL APPROVALS DEPT..�Q U REQ'D.�/J►/� ,- RREEC'D. Env. ' la_�" 111 -1 Planning Fire Marshall Co. Engineer Utilities Zone Clearance SEPA Checklist SPECIAL CONDITIONS: p2aW44- #-/y- i,f1 /1 DATE OFFICIAL. fiaAaL APPROVED FOR ISSUANCE FEES COLLECTED Single $ Building Plumbing Mech. Plan Check SEPA PERMIT NUMBER TO —J� DATE 4/14/80 0-* *4400 *44.00 *44,00 E *0.00 3560$ 04-16-80 R 6479. U LU CL Mobile Home z Other (Specify) TOTAL $ y (3 WHEN MACHINE VALIDATED IN THIS SPACE, THIS BECOMES A PERMIT. 0'4!-:16- 0 5 6. 1 *44.000 APPLICANT: COMPLETE NUMBERED SPACES - PRESS HARD TO MAKE 4 COPIES JOB ADDRESS LEGAL DESCRIPTION -SEE ATTACHED 1. E. 12002 25th SpokaneWa. LOT BLOCK ISUBDIVISION,,_,s�Y� PARCEL NUMBER/S zss-y_p�_o�— OWNER PHONE > /C �- Got' � Zl�o� S' �', eta' I� 3, Gu Hawks 924-6275 ADDRES2 • 12002 25th Spokane, Wa. ZIP 99206 Required Set Backs in Feet JZ / North 4o South 3 East West CONTRACTOR Universal Steel Buildings PHONE 624-7009 Size of Parcel 010 x /-!;-61 Zone Classification 1 -Isk/ , 4. ADDRESS ZIP Type Const. Occupancy Sprinklered E 217 Second S ok ne Wa 99202 I ❑Yes ❑No ❑ Req'd. DESIGNER PHONE 624-7009 Valuation 3 Building Area in Sq. Ft. �� 5' Mike Gleason ADDRESS ZIP DWL A ea Basement Area Garage Area Storage E. 217 Second Spokane, Wa. " ey"—' 6. CHANGE OF USE FROM TO Split Entry �0e'�d[.t�17 ��s7Sp'�lit Level WGT Rancher TYPE ® NEW 7, OF WORK IN BLD. No. Baths No. Floors No./Rooms Rec. Roo 1-1ALT.ALT. AD'N. RPL. MVE. !/ ❑ OTHER ElPLMB. ❑ MECH: ❑ M.H. ❑ CERTIFICATE POOL Req'd. I Recd. Not Req'd of EXEMPTION LL/ DESCRIBE WORK Construct 36x24 pole -type garage 8. VAL ION Source GAS ELECTRIC WATER SEWER � of 9, a 9& 0O Utilities I hereby certify that I have read and examined this application and have read the "NOTICE" provisions included on reverse side, and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or local law regulating co struction or the performance oaf/construction. DATE 7 —�H �� SIGNATURE SPECIAL APPROVALS DEPT..�Q U REQ'D.�/J►/� ,- RREEC'D. Env. ' la_�" 111 -1 Planning Fire Marshall Co. Engineer Utilities Zone Clearance SEPA Checklist SPECIAL CONDITIONS: p2aW44- #-/y- i,f1 /1 DATE OFFICIAL. fiaAaL APPROVED FOR ISSUANCE FEES COLLECTED Single $ Building Plumbing Mech. Plan Check SEPA PERMIT NUMBER TO —J� DATE 4/14/80 0-* *4400 *44.00 *44,00 E *0.00 3560$ 04-16-80 R 6479. U LU CL Mobile Home z Other (Specify) TOTAL $ y (3 WHEN MACHINE VALIDATED IN THIS SPACE, THIS BECOMES A PERMIT. 0'4!-:16- 0 5 6. 1 *44.000 Universal Steel Buildings, Inc. RULES: N, ME -_ - - allSt 1) Bldg. must be 5' from property line 2) Bldg. must be 10' from drain field 3) Bldg. must be 25' from property line if property line is next to a street 4) Bldg. must be 10' from all existing bldgs. PLOT PLAN too' z��- Vw c7 O G Q _jc: M., ADDRESS WHERE BLDG. L z WILL 3E LOCATED Z When to be built___ BLDG. SIZE j PARCEL #2Ys P Mv- C. INSTRUCTIONS: 1) Draw in all existing bldgs. 2) Draw in new bldg. and how many feet it is 1r.om existing bldgs. and property lines 3) Name all roads next to property 4) Draw in drain field and whether you are on a septic tank or sewage sys'em. ` 5) Need size of property