Loading...
1976, 12-01 Permit App: L6374 Enclosing CarportCIAnty of Spokane, Wasitgton BUILDING CODES DEPARTMENT, N. 811 JEFFERSON, SPOKANE, WASHINGTON 99201 APPLICATION FOR LAND USE OR STRUCTURE PERMIT GENERAL REQUIREMENTS PERMIT FEEca$'/''_7.'_.. PERMIT REQUIRED. A land use or structure permit is required by County Resolution to erect a building or structure of any kind or alter any building or structure already erected, or to change a land use. Construction mast conform with the Spokane County Building Code and Zoning Ordinance. Construction is subject to inspection. NATER. Water supply must be approved by the County and State Health Departments. Where work on water connections disturbs the surface, shoulders or ditches of County Roads, permission must be obtained from the County Engineer's Office. SEWAGE SYSTEM. Permits are required in all cases by County Resolutions Nos. 45-133 and 47.235. SET -BACK FROM PROPERTY LINES. In most zones and under most circumstances, a set -back from the front property line, of at least 25' is required, a 5' side yard, 15' side yard from a flanking street, and a 25' rear yard are required. STATE HIGHWAYS. Where the structure abuts a State Highway, clearance must be obtained pertaining to set -back and ingress and egress. COUNTY ROADS. Work on street right-of-way may not be performed until staked by County Road Department and work must be performed in accordance with stakes. Points of ingress and egress must be approved by the County Engineer. MOVING OF BUILDINGS. A permit is required to move an existing building. When a building is moved on a County or State Highway, clearance must be obtained from the County Engineer and/or State Highway Department. ACCESSORY BUILDINGS. Accessory buildings (garages, sheds, etc.) require a separate permit. RE1$TRICTIVE COVENANTS. Builders should check provisions of covenants or dedications and easements running with the land wh�ch are enforceable through civil action. County Officials can not bring action to enforce covenants or dedicati S. APPLICANT FILL IN BELOWp THIS LINE Name of Owner r Address �..�Q� -fL+ Phone p Architect Address IAtO v� �� Phone YO 9 Engineer Address Phone Contractors &woo i -Q Address �J Phone Legal Description of Property (Give complete description from deed, tax receipt, etc.) a�Ss%'� 0 /o77 Z „,V- ..-) V' -4- Al 3 'rf>A r te. -, <; " o,* / . -/A -/ 7' "- A—" ,Al _ DESCRIPTION OF WORK: New Addition Remodel �� Moving Bid . Zo �ne —� Fire Zone Size of Lot �r Z3" {1f 3 %� /d Sewage SystemConst. Fr., Conc., B ., etc.) Stories Dimensions r_Q X A ) Total Sq. Ft.,::f Valuation Rooms 4— BathsBasement 4(7 ' Foundation Const. And23,C= Chimney –L,t Fireplace Full, part, none' . ( ind) (Number Heat. System Type of Roofing Ext. Finish ^fit. Wall Finish �� Use of Bldg. f�7 No. of Units—Bedrooms PLOT PLAN /L Draw sketch with dimensions showing: (1) property lines; (2) street or road locations; (3) location of existing and proposed buildings; (4) distance to property lines and streets; (5) dimensions of buildings; (6) location of sewage sys- tem and water supply lines. NORTH RESIDENTIAL — COMMERCIAL $� 3r N M 2,5 � SOUTH M a N State License No. Ind. Ins. Acct. No. REQUIRED Plumbing Permit Heating Permit Sewage Permit Plans Received Plans Checked Plans Returned Plans Picked Up Plans Mailed I hereby certify information submitted is correct and there are no other structures located on this property except as shown. // Owner or Agent Date A LAND USE OR STRUCTURE PERMIT MUST BE ON THE PREMISES BEFORE CONSTRUCTION COMMENCES. THIS IS NOT A PERMIT. , DO NOT WRITE BELOW THIS LINE Your street address will be f�0 0 3 L^ .JW The zone is \ Sewage Permit Number Issued Building Permit Receipt46sued Remarks Form 523 Bldq. Code