Loading...
2014, 09-05 Permit App: BLD-2014-2127 Pole Bldg Project 4.p-ZO( 2/Z''7 Community Development Department Ht.QA LW(EillA (____, Permit Center 11703 East Sprague Avenue, Suite B-3 PERMITJJ �r GCtriUU .JJ F 2014 pQe �"'��, Spokane Valley, WA 99206 SCITY Tel: (509) 720-2540 PERMIT FEE: Valley. Fax' (soy) baaenter@s 0037 c c V P C n M I T c C Iv I C S permitcpokanevallev.orq SUB # - REV. # I RESIDENTIAL CONSTRUCTION PERMIT ,A,PLICATION PLICATION Q NEW CONSTRUCTION © ADDITION/REMODELLer ACCESSORY BUILDING Q DECK El OTHER SITE ADDRESS: 1 V-to 6, C Z to `- gl/G ASSESSORS PARCEL NO.: LEGAL DESCRIPTION: BUILDING OWNER NAME: -77,o,z4, T ,L J e.5/t� S !li,//,,y NAME: Tl`Wk 1- Slt2 0I(41(69 ADDRESS: l 196 6 C, ,/ L 1S 1101_ CITY: 51 ))ca ils2 0ct../1le1 STATE: t c{ ZIP: qc.(2.O 6 PHONE: (S-O�) 2o - 7' 2C FAX: CELL:CSOe() 2-Q -y9 a O CONTACT NAME: "re y k Y\ncAM Civ\ PHONE: ($oc() „2'U - 5/92_O. FAX: CELL: (V') ? 3a- sly. p n CONTRACTOR NAME: `�QYYv2.- 0._ ___ gbOue. MAILING ADDRESS: CITY: STATE: ZIP: PHONE: FAX: CELL: CONTRACTOR LICENSE No.: EXPIRES: CITY BUSINESS LICENSE NO.: DESCRIBE THE SCOPE OF WORK,I�fN DETAIL AND INDICATE USE & PROPOSED USE: iQe.s_A- -Po\e. b(), \c{ `r . , / l+�c..r..75e ireC'o_c_e_ ****YOU MUST COMPLETE THE FOLLOWING**** MARK N/A IF NOT APPLICABLE Height to Peak: Dimensions: No. of Stories: Total Habitable 2-4/JC Z y ' Space: Main Floor S FT: Upper Floor SQ FT: Unfinished asement SQ Finished Bas ent SQ ,!/ FT: 4J//2 FT: Ai Garage S FT: Deck/Covered Patio SQ Impervious Surface 30% Slopes on .S-7 GP' FT: Area: Property: 4i4e? No. of Bedrooms: 0 Constru tior>,TYP, ?, , Heat Source: NM Sewer or Septic: /t if TOTAL COST OF PROJECT: $ DISCLAIMER The permitted verifies,acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved before this application can be processed. Signature Date: Updated 1-11-11 Page 1 of 1 C:\Users\bryan.happeny\Desktop\BLD APPS\BLD-RES.doc Project # e`er 2-0(c-M0 ReAsi&iiiilEbriveway / Spokane sPAVING WAIVER Valley Comm nity lapel t 'ng Division 1170 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.720.502 91E1/1:40 .688.003 ♦Pl r ingLspokanevallev.org Spokane Valley Municipal Code(SVMC)Section 19.40.020.B; "All residential driveway and off-street parking areas shall be paved with asphalt,Portland cement,grasscrete,paver blocks or other equivalent hard surface material". A paving waiver can only be granted if the structure you are proposing is not going to require a driveway for daily use. PART I — OWNER INFORMATION i PARCEL#: }���'T, 06e) OWNER NAME: � ' a��� J ��«o� ADDRESS: 11c106,, ZG Glue CITY: SAC.c,LvLe O.k(ec.1 STATE:w(Q ZIP: CIA ZQ� PHONE: s-67 2,30 2c FAX: CELL: EMAIL: ~,3 rv\ U 6,4"e or\Sri,Cowl PART II —DETAILS OF PAVING WAIVER 1. Do you have an existing garage for parking daily use vehicles? S ❑ NO 2. Is the proposed detached structure used for storage only? SES ❑ NO 3. Do you plan on using the detached structure to park vehicles? EMS ❑ NO If yes, then what type of vehicles? i& v /c6L,,,Artee 4. Do you plan to conduct a business from proposed detached structure? ❑ YES FIQO If so, what is the nature of your business? PART III —AUTHORIZATION I,(PRINT NAME) J tatl,y J YYlaa.0 l owner, hereby confirm that the information provided on this form is true and correct. I acknowledge that any change in the foregoing conditions, could require the City to impose paving requirements. I further agree to report any change in these conditions to the Spokane Valley Community Development Department, Planning Division, within 30 days. 2 / Own- i ature Date PART IV— DECISION STAFF HAS REVIEWED THE PROPOSED PAVING WAIVER ON BEHALF OF THE COMMUNITY DEVELOPMENT DIRECTOR AND FIND THE REQUEST IS GRANTED AT 1/ I© lD 6 < ?‘ szd SAID ADDRESS FOR PERMIT#: • 2-(J'}_.e q/5 7/7 Plan ing ivision Staff Signature Date Created 6/27/11 Page 1 of 1