16-179.00 CH2M: Sullivan West Bridge Replacement Settlement CH2M
999 W.Riverside Ave.
2111ft. Suite 500
Spokane,WA 99201
O 11509 747 2000
F +1509 6231622
www.ch2m.com
November 2 2016
Mr. Eric Guth
Public Works Director
City of Spokane Valley
11707 E.Sprague Avenue,Suite 106
Spokane Valley,WA 99206
Subject: Sullivan Road West Bridge Replacement,Centennial Trail Clearance Design Issue
Project number 428859
Dear Mr.Guth,
CH2M is pleased that we have been able to come to an agreement related to the realignment of the
Centennial Trail("Claim"). The Claim is related specifically and exclusively to the design and
construction required to realign the trail as a result of inadequate clearance under the new structure
resulting from CH2M's final bridge design. This work includes the construction of the trail, retaining
walls,stairs,relocation of the AT&T utility,and other features included as part of the contractor's
change order for this work. As requested,CH2M offers the following to resolve the Claim:
First,CH2M will assume and waive the design and related consulting services costs associated with the
trail relocation design,right-of-way/easement adjustments and permitting. These costs have been
incurred by CH2M and have not been passed on to the City of Spokane Valley. CH2M has captured
these costs separately on our project tracking number.
Second,CH2M will also reimburse the City for additional costs incurred through the contractor as a
result of the changes needed forthe realignment of the Centennial Trail. The total construction costs
:for which CH2M will reimburse the City,agreed to at the meeting on February 18,2016,is$76,216. In
addition,CH2M will reimburse the City for the$9,981.36 cost to relocate the AT&T utility,for a total
.reimbursement of$86,197.36. CH2M proposes to deduct this amount from future invoices until the
full amount is covered. CH2M has held its billings over the past several months anticipating a
resolution Of this Claim. In summary,CH2M proposes to deduct the total reimbursement amount
-from our.next invoice,which will be submitted in early November. If the current invoice doesn't cover
the amount agreed to with the City,a check will be prepared for the remaining amount and sent to
the City.
Third,the City is holding an invoice from June(covering Jan-May 2016). We recommend canceling this
invoice. We will reissue that invoice to include a credit towards the$86,197.36 that is owed to the City.
In consideration of the terms set forth above,which were negotiated in good faith by the parties to
resolve solely the Claim as described above,and effective upon mutual execution of this agreement,the
City forever releases and discharges CH2M and any of its present,former or future employees,officials,
agents,consultants,and their lawyers from any and all manner of action or actions,cause or causes of
CH2M HILL,INC.
Mr. Eric Guth
Page 2
November 2,2016
action,whether in law or in equity,suits,debts,liens,contracts,agreements,promises,liabilities,claims,
demands,damages,losses,costs or expenses,of any kind or nature whatsoever,known or unknown,
suspected or unsuspected,fixed or contingent,relating to the Claim. For the avoidance of doubt,this
release shall apply solely and exclusively to the Claim,and shall not operate to waive,discharge,or impair
any other rights,remedies,or actions the City may have with respect to other services provided by
CH2M,including any other errors or omissions not related to the Claim that may be attributable to
CH2M.
If the City of Spokane Valley agrees with this agreement as the method to reimburse the City for the
$86,197.36,please sign and return a copy of this letter. By executing,both parties agree that there are
no outstanding issues related to the Centennial Trail Design issues,subject to the conditions contained
in the prior paragraph,and this agreement constitutes a full and final accord between them. Nothing
herein shall be construed as an admission of liability by CH2M.
Regards,
•
CH2M HILL,Inc. City of Spokane Valley
Roger W. Flint6Ak l O 12-/k/
Vice President/Transportation /�
Northwest Geographic Manager ( ` y /� abt f
l
CH2M HILL,INC.