Loading...
16-091.10 Meridian Construction: City Hall Iln - 0`'1. 1 . ID SPOKANE VALLY CITY HALL Architects West Inc. Architecture • Landscape Architecture CHANGE ORDER-010 AL Issue Date: 3/22/2017 Exiiect more than great architecture PROJECT OWNER CONTRACTOR DISTRIBUTION X Spokane Valley City Hall City of Spokane Valley Meridian Construction Doug Powell X 10210 E.Sprague 11707 E.Sprague Ave. 12310 E Mirabeau Parkway Mark D'Agostino X Spokane Valley,WA 99206 Suite 106 Suite 100 Steve Roth X Spokane Valley,WA 99206 Spokane Valley,WA 99216 Jim Paras X CONTRACT FOR: GENERAL CONSTRUCTION Todd Ottmar X CONTRACT DATE: 5-20-2016 You are hereby directed to make the following changes in the contract: , REFERENCE DESCRIPTION AMOUNT COP-055 Added Soffit in Room N204&Cable Tray Re-Route $3,090.46 ' PR-015 RFI-100 COP-061 North Stair Veneer Support $2,789.02 CCD-014 ' SK-27 COP-064 Finishes at Stair#2 Columns $787.68 SK-28 PR-018 COP-072 Door Hardware Changes $3,173.72 Sub#051 RFI-043 TOTAL $9,840.88 The Original Contract Sum was: $9,742,700.00 Net Change by PrevioUsly'Authorized Change Orders: $117,919.87 The Contract Sum prior to this Change Order was: $9,860,619.87 The Contract Sum will be increased by this Change Order in the amount of: $9,840.88 The new Contract Sum including this Change Order will be: $9,870,460.75 The Contract time will be unchanged/Changed by: 0 days The Date of Substantial Completion as of the date of this Change Order therefore is: 7/25/2017 ARCHITECT CONTRACTOR OWNER REPRESENTATIVE Architects West,Inc. Meridian Construction City of Spokane Valley 210 E.Lakeside Ave. 12310 E.Mirabeau Parkway,Ste 100 11707 E.Sprague Ave.,Suite 106 ' Coeur d'Alene,ID 83814 Spokane Valley,WA 99216 Spokane VWIley,WA 99206 SIGNATURE: SIGNATOR : SIGNA f JJ�I((''II\\ -DATE: 3/22/2017 DATE:_ —I(. DATE: , / / q/cbi2pc7 1509–SPOKANE VALLEY CITY HALL CHANGE ORDER-010 –3/22/2017 Page 1of1 210 East Lakeside Avenue I Coeur d'Alene,Idaho 83814 I ph 208-667-9402 I fx 208-667-6103 I www.architectswest.com