Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
2008, 06-03 Permit App: 08002048 Deck
Project Number: 08002048 Inv: I Application Date: 6/3/2008 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Protect Information: Permit Use: 12 X 20 DECK Contact: PHILLIPS, ADAM A Address: 11403 E 28TH AVE C - S - Z: SPOKANE VALLEY, WA 99206 Setbacks: Front Left: Right: Rear: Phone: (509) 922-3130 Group Name: Site Information: Project Name: s^O., VA Plat Key: 001393 Name: KOKOMO TOWNSITE (FEES) District: Sout Parcel Number: 45283.4009 Block: Lot: SiteAddress: 11403 E 28TH AVE Owner: Name: PHILLIPS, ADAM A Address: 11403 E 28TH AVE Location:: CSV SPOKANE VALLEY, WA 99206 Zoning: R-3 SF Res District Water District: 007 MODEL Hold: ❑ Area: 9,750 Sq Ft Width: 0 Depth: 0 Right Of Way (ft): 0 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Review Information: a Review Building Plan Review Released By: Originally Released: 6/3/2008 By: tmelbourn Landuse/Zoning/HE Conditions Released By: Originally Released: 6/2/2008 By: mpalaniuk Operator: JD Printed By: jmm Print Date: 6/3/2008 Project Number: 08002048 Inv: I Application Date: 6/3/2008 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit - Building Permit - - -- - - - — -- Contractor: OWNER Firm: OWNER Phone: (000) 000-0000 This Application: Total Project: Description Gra Type Notes Scl Ft Valuation Scl Ft Valuation DECK OPEN R-3 VB 240 $3,600.00 240 $3,600.00 Totals: 240 $3,600.00 240 $3,600.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $97.25 WSBC SURCHARGE 1 SELECT $4.50 SF PLNS RVW < 7999 SQ FT 1 SELECT $38.90 Permit Total Fees: $140.65 Notes: Payment Summary: Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $140.65 $140.65 $0.00 $140.65 $140.65 $140.65 $0.00 $140.65 Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: jmm Print Date: 6/3/2008 Permit Center C'T''0 11703 E Sprague Ave, Suite B-3 PERMIT NUMBER: OJM�w Spokane Valley, WA 99206 PERMIT FEE: ,;oOWley" (509)688-0036 FAX: (509)688-0037 www.spokanevalley.org Development ww.spokanevalley org Residential Construction ❑ New Construction ❑ Accessory Bldg Permit Application ❑ Addition/Remodel 'KDeck ❑ Other: SITE ADDRESS: I I Lie � L. __)_ c"t � A u p ASSESSORS PARCEL NO: Lf �-� a H C 0 I LEGAL DESCRIPTION: KU 0 in d low n S t JP L 19+ (v1 «C Building Owner: Name: l. 1 N� Address: I alJ I - 7 City: r State: Zip: Phone: f r LI IJ Fax: Contact Pe son Name: fA Ck t'L In F J( ; � Phone: Describe the scope of work in detail: i Proposed Lose: 'fo I,- � �- o , Contractor: r' Name: Address: City: State: Zip: Phone: Fax: Contractor Lic No: Exp Date: City Business Lic. No: Cost of Project: $ a 000. oc, **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: It9 DIMENSIONS: l� # OF ST�IQF�J� ' TOTA HAB ABLE SPACE: a�/ MAIN FLOOR TO SQ. 2 FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE FTG: fi//4 /V//� &Zfi AREA: Nll� FINISHED BAPTT GARAG Q. TG: PAT O SQ. FT DECK/COV. G: 30% SLOP ES ON SQ. FTG I`�j$/ :2 oto PROPERTY: V # OF BEDROOMS CONS CT ON TYPE: r , HEAT SO R �:,1 SE ER OI SEP I �4 ' � The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling istwill be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. SIGNATURE: �, ", DATE: b ' 0 Method of Payment: ❑ Cash ❑ Check ❑ Mastercard ❑ VISA Bankcard #: Expires: VIN#: Authorized Signature: Effective 10-28-07 Page 1 of I http://www.spokanevalley.org/uploads/Community_Development/Documents/FormsBuilding/Residential Building Permit App.doc sTYOF p/� jUalley Site Address: 11403 E 28TH AVE Parcel Number: 45283.4009 Project Transmittal City of Spokane Valley Community Development Department 11703 E. Sprague Ave, Suite B3 Spokane Valley, W_ -k 99206 Phone: 509.688.0036 New project Previous pre -app meeting E] Plan revisioas i n Transmittal Date: Friday, May 30, 2008 Project Number: 08002048 Zoning: R-3 Water District: MODEL Fire District: FD 01 Applicant: PHILLIPS, ADAM A Owner: PHILLIPS, ADAM A 11403 E 28TH AVE 11403 E 28TH AVE SPOKANE VALLEY, WA 99206 SPOKANE VALLEY, WA 99206 (509) 922-3130 e-mail: e-mail: Contact: PHILLIPS, ADAM A Occupant: 11403 E 28TH AVE e-mail: SPOKANE VALLEY, WA 99206 (509) 922-3130 e-mail: Contractor: OWNER Arch /Engineer: () -0 JUN Q z M i e-mail. ❑ C Project 12 X 20 DECK Description: Please send all plan review and project comments via e-mail to the highlighted individuals. SCITY OFIN oKane jUalley. For City Use Only PLUS Project Number { �( 1 Project Address 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenterCspokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is — The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Proiect Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the. entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review, is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07 ex 5O Ilyd3 � ZSfi�'�.,e s Po Hca Re'J G1�1ey �,.)1 rf9 ZO {o Z83.1-1069 PLANNING DEPT. APPROVED w DATE �T< EX ', 5 � i rl 201s; hce -o cJ y5 2Vt' Ai o ZN �-9�4 40 S V I Ts, ►:nom 14--20 it43� i 45 I I 13;I � I 14c--_ ZZ r i Ir 76' - _-1009 Af� Adam Philli s 11403 E 28 Ave Spokane Valley,WA 99206 Front Yard Deck Specifications: 12' by 20' Rectangle Deck 2x8 on all 16" centers All pressure treated wood and composite construction _�3 zZ main beams on peirs will be 2x8's nailed together to make 4x8's 4 peirs supporting each beam Joist hangers to support joists P e (AJ Ap C11 -jx jo , ls� k(O c fid level '2J L XJ-' 1�� J P. lecs L�3 � � p C- Y(fj � &t ©w Aj �- ey N m 1�� J P. lecs L�3 � � p C- Y(fj � &t ©w Aj �- PROVIDE DIAGRAMS AND ENGINEERING LAYOUTS FOR ROOF TRUSSES, BEAMS AND FLOOR SYSTEMS PRIOR TO FRAMING INSPECTIONS CITY COPY THIS BUILDING SUBJECT TO FIELD INSPECTION CORRECTIONS S '.�oowley REVIEWED FOR COO - COMPLIANCE SPOKANE VALLEY DU1, G DIVISION