2008, 06-30 Permit App: 08002387 PatioProject Number: 08002387 Inv: I Application Date: 6/30/2008 Page 1 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Proiect Information:
SiteAddress: 11411 E 28TH AVE Owner: Name: SCHOO, BRET L
Address: 11411 E 28TH AVE
Location:: CSV SPOKANE VALLEY, WA 99206-711
Zoning: UR -3.5 Urban Residential 3.5
Water District: 007 MODEL Hold: ❑
Area: 9,750 Sq Ft Width: 0 Depth: 0 Right Of Way (ft): 0
Nbr of Bldgs: 1 Nbr of Dwellings: 1
Review Information: .: R'
Review
Building Plan Review Released By:
Originally Released:
Landuse/Zoning/HE Conditions
6/27/2008 By: tmelbourn
Released By:
Originally Released: 6/24/2008 By: cjjanssen
Permits:
Operator: JD Printed By: JD Print Date: 6/30/2008
Project Number: 08002387 Inv: 1 Application Date: 6/30/2008 Page 2 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
- - Building Permit
Contractor: OWNER
Firm: OWNER
Phone: (000) 000-0000
This Application:
Total Project:
Description Grp Type
Notes
Sq Ft Valuation
Sg Ft Valuation
COV DECK R-3 VB
384 $5,760.00
384 $5,760.00
Totals:
384 $5,760.00
384 $5,760.00
Item Description
Units
Unit Desc
Fee Amount
RESIDENTIAL PERMIT FEE
1
SELECT
$125.25
WSBC SURCHARGE
1
SELECT
$4.50
SF PLNS RV W < 7999 SQ FT
I
SELECT
$50.10
Permit Total Fees:
$179.85
Notes:,
_.:
PaymentSummary: _
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $179.85 $179.85 $0.00 $179.85
$179.85 $179.85 $0.00 $179.85
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: JD Print Date: 6/30/2008
Permit Center
cm of 11703 E Sprague Ave, Suite B-3 PERMIT NUMBER: 2
Spokane - 2y
Spokane Valley, WA 99206 PERMIT FEE:
jvalleyt (509)688-0036 FAX: (509)688-0037
www.spokanevalley.org
Community Development
Residential Construction ❑ New Construction ❑ Accessory Bldg
Permit Application ❑ Addition/Remodel ❑ Deck
0 Other:
SITE ADDRESS: l i LW rs::zs` Spbl-ay e. kI °xkk tq
ASSESSORS PARCEL NO: LA S'Q B . WD D I O LEGAL DESCRIPTION: i -`W/ -R—
Building Owner:
Name: 13 tt�
Address`.
City: State: e.rl� zip: QCjZoco
Phone: 0 _ W q3 Fax: N
Contact Person
Name: ct Q
Phone:
Contractor:
Name:
Address:
City: State: zip.
Phone: Fax:
Contractor Lic No: Exp Date:
City Business Lic. No:
CZoo
Describe the scope of work in detail: Cost of Project: $
�✓ WI 11; :
i�t��incs SCF y est — C,1, i s� 9ea�`S /.� �.7fjQX (., �o LAO VL ��O :ty f�yytt
&Pt'01. 2lil* clS Pott 'd 1!OWi '5IOOt OUBn.�XrSl�ir� A00,y
Proposed Use: e o WeJ :y'�L'o
**************The followina MUST be com lete: (write N/A if nota licable)**********************
HEIGHT TO PEAK:
DIMENSIONS: vtf
3
# OF STORIES:
TOTAL HBITABLE SPACE:
12'�3z'
N I
MAIN LOOR TO SQ.
2 FLOOR SQ. FTG:
- , FIN 6ASEMENT SQ. FTG:
IMPERVIOUS SURFACE
FTG:*
1
AREA:
FINISHED BASEMENT
GARAGE SQ. FTG:
DE COV. PATIO Q. FTG:
30% SLOP S ON
SQ. FTG: tj
PROPERTY:
# OF BEDR MS:
CONSTRUCTION TYPE:
HE R(E:
SEWE R SEPTIC?
N
From, v>
'
1 --3 '
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
SIGNATURE:
Method of Payment.
❑ Cash ❑ Check
Bankcard #:
Authorized Signature:
REVISED 2/15/07
DATE: �-23-ab
CITY _= V.ALLEY
❑ Mastercard ❑ VISA JUN 2 3 2008
Expires: VIN#:
PER I
BY CENTER
SCITY OF 11703 E Sprague Ave Suite B-3♦ Spokane Valley WA 99206
p♦509.688.0036 ♦ Fax: 509.688.0037
Valley„;�oA
❑X Completed Building and Mechanical Application with: Accurate address, Parcel
Number and/or Legal Description, description of work, owner and contractor
information, signature and date.
IZIThree (3) sets of plans including Site Plan, elevations, floor plans, foundation plans
with details, roof plan, framing plans and details.
❑X Show the height of any proposed buildings or accessory structures.
❑X Floor plan for each floor: Dimension to scale(minimum 1/8") and label each room
(including sq footage of house and garage on plans) show each level of existing
house and square footage of any additions.
❑X Egress windows: Provide at least one window or exterior door approved for
emergency escape or rescue from basement and in every room for sleeping.
❑X Floor framing details: Joist type, size, spacing and installation details.
pX Roof framing plan and details
❑X Furnace and hot water heater location
❑X All header locations: type, size and connections
FX Foundation plan
❑X Insulation information
pX Decks and Stairway details
All braced wall panel types: show locations and details of installation, including
engineered design
Smoke detector locations
22" x 30” attic access location
18" x 24" crawl space access
One-hour separation detail: between house and garage
Site Address: 11411 E 28TH AVE
Parcel Number: 45283.4010
Project
Transmittal
City of Spokane Valley
Community Development
Department
11703 E. Sprague Ave, Suite 133
Spokane Valley, WA 99206
Phone: 509.688.0036
Newproject 11
PrcT4ous pre -app meeting ❑
Plan revisions 0
Transmittal Date:
Tuesdav, June 24, 2008
Project Number. 08002387
Zoning: UR -3.5 Water District: MODEL
Fire District: FD 01
Applicant: SCHOO, BRET L Owner. SCHOO, BRET L
11411 E 28TH AVE 11411 E 28TH AVE
SPOKANE VALLEY, WA 99206-711 SPOKANE VALLEY, WA 99206-711
(509) 590-6343
e-mail:
e-mail:
Contact: SCHOO, BRET L
Occupant:
11411 E 28TH AVE
e-mail:
SPOKANE VALLEY, WA
99206-711
(509) 590-6343
e-mail:
_
Contractor: OWNER
Arch / Engineer:
` E CG [..E �1 J 1E
O - o
LN�i
JUN 25 2008
e-mail:
i
Project COVERED PATIO
Description:
Please send all plan review and project comments via e-mail to the
highlighted individuals.
Spokane
jUalley`
For City Use Only
PLUS Project Number 0C;c_O1 N��
Project Address
t
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE —APPLICANT PINK — BUILDING FILE REV 9/07
ii
Eli
`c7Cc�.�r-c O�5
Lo. — L -t gaz-
r6,�ac 2 5�,V f, 4s
3 bcrx;,DVs
PiA
C yV�•U . �jrQu� e� S 1; Q I feloar
-.;- -� Iq I%
S�ec�l SCre come, th .x -�
bo ckeks
'90
Se+ ,� �a \cC� �C�-l�'o� �4� � l�"I �C�x•�fe �-�fCr<.�-e�V [�s� SLC �rR.
Ciu,�'Sr�R- c5f�'"7fr�
a �eawI5
(j ( t � Jia ase cgscq,�e. ��� '•�cerec�/
`jw\'ro✓� "" ler V -,k5
5v�, ouyA5 F-�.V. tto+
rTaC,� � ✓� o2oC 1p I v QCT
ayLK
W%O CvvTIN G kO 'L -S �F
L k 1 $T" N(, f-oA kc—tCJu tAdz)
_Ll_ 1�
M JUN 2 3 2008
,
1/8" GAP
8E, O EEN SHEATHING
ry i
roil
PROVIDE DIAGRAMS AND
ENGINEERING LAYOUTS FOR
ROOF TRUSSES, BEAMS AND
FLOOR SYSTEMS PRIOR TO FRAMING
INSPECTIONS
CITY CQPY
THIS BUILDING SUBJECT
TO FIELD INSPECTION CORRECTIONS
REVIEWED FOR CODE COMPLIANCE
SPOKANE VP,' ' ' ' 3isP fNfG DIVISION