1978, 05-10 Permit: M6198 ResidenceSPOKANE COUNTY BUILDING CODE DEPARTMENT RESIDENTIAL NUMBER M 019 8
811 N. Jefferson, Spokane, Washington 99201
Land Use or Structure Permit Property Address -------- 28th--AVemaj1*,St --- 1324----------------------
Group
324-- ---------------
Group ........ 1� ---- Type ... ------- Zone ----- Agri .. Sib- -------------------- Permit for .........*I(AIA"Llul -
ii ... 98r"s--attached ------------ ------------
own er.11rac-E. _Jf1tCtMftk --------------------_-------- ------Address....-- ------------ _-*twPhone41*4,613 -------
Architect----------------_--- ------------------------------------------------------- Address .... ----------------------------------- ------------_---------- - ----------- Phone ..............................
Contractor ... 3r_VC_*..-EA_._R1_tChC9Ck ---------------------- __ --- Address .... ... $aft - - - ---------- .................. -------------------------------- Phone --- SW ----------------
Location: Parcel Number -----2$643 44 . ..---i.9.t..7-.&--B....Block--41.r--.Ko--- Toonai -to ------ d_.r/w_.V0..---- Min---------
8142._..set!o.backs ... from..&I.1- property ---lines------From.-yard- -of- - at -_ Itatt-561 ... .-C11-n-of --rd ...r/ -w --or -
25 --- fmnt...p/_I_n,._vh1ch*ver_ Js..Sroater - ----- 451 - f rw c/1 -n- . ati.t. r./V_er --- IS I. -fm.-flanking----------
5-tr.eats..Pll-n-,,..wh-i-cbw.er ---- is --- oreater,.-.5_1 --- side -yard ----- for -ort--ano--slide ... for--
wAy.,--whon..garage--is--deUcW-- -and --no-alley-iii-2V --r-"r--y*rd_or-_ppr
Rt', i#
Bldg. Zone -------- I.Fire Zone -----5._._-Size of Lot --- 102.'XM' -------------------------------------- Sewage ---- SeptiC ----_._.-_Const. __f-r-OMO -------- _ -------------
Stories.------I---Dimensions---241441---IV- 201 --- 22lx241 --- -----------------------------Total Sq. Ft.. --2.104- ----- Valuation -$60,01M,00 ---------
Rms ------ 7 --- Baths/RR --------ft--Basement --- ft -1-1 --- Foundation.-CMerete ------ . Chimney ---- MS ... Fireplace------ Htg. System-. --- ejec ---f,#-__-___.
Type of Roofing ------- C40P --------- --- .-- Ext. Finish ---Cedar-__ . ___ ---------_.___Int. Wall Finish -------- dryWl_j____ ----------- ----- Bdrms..3 ---------
Certificate of Occupancy Issued for. ----- 9!t"plLimbing.-&M--boati-r4--pamiU an._r.W_1d.-- --EAO- - STAGI
Remarks ---- OF.-.-(:OXS-TRUC-TIOtt--NUST--NAVE -INSPECTLM-.JMLED..FDR,--*U--REQUIRM--RY-CODE - ----- MUST-CONFOW..
TO. -ALL. -COUNTY - ME _ REQUIRMTS. FINAL - - INSPECTION- -.4UST- - BE - CALLED- - FOR, - -UPON--t LETION - - ANP -------
PRIORJO --- OCCUPANCY --OF RESIDENCE.- --CALL - - 456"367t, - - Pr -for -to --- M* W- -*'x. -_ -ftr-, all --- inspecti-ont -----------
Uad/-or --- firt--tWet - ----- Smoke - -detector(t) --- reqatrod - ----- A-4/hr ---- rate44 Im -wall _"paration---ry - --- - -------
quired. -between - -ruldence - and- -gan 9* - --------------------------------------------------------------- ---------------- ----------------------- * ----------------------
THIS PERMIT isgranted upon the express condition that the building or land use for which the permit is issued shall conform in all respects to all the ordinances of the County Of
Spokane, regulating the construction, use and occupancy of buildings in Spokane County, and may
y be revoked at any time upon the violation of any of the provisions of said ordinances, or
failure of plans as approved, to comply with said ordinances
11 consideration of the issuance of the permit for the erection of signs the grantee must place the said signs where directed by County Officials and shall remove the sail sigr,at the
expiration on of the permit unless regularly renewed.
This permit will be good only for commencement of work within six months, and the entire completion thereof within....-- --- YAWT
from this date; after which time this permit will be void. Authorize by Building Official BUILDING CODE DEPARTMENT
May 10* 1979
PermitExpires----------------------- ----------------- ....... ...... ........ . ...........
INSPEQTOR
97.00 meBuilding
----------------
Fee Paid $ ................................... Date Issued----
PLANS
2. snn
3. FRAMING.-
4. LATHING -4.;
-lm
riEY..........
.... .........:._..
1. FIREPLACES
9. HEATING
SYSTEM.._.._