Loading...
2008, 05-13 Permit App: 08001624 Additioni I Project Number: 08001624 Inv: I Application Date: 5/13/2008 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: BATHROOM ADDITION Contact: DICKINSON LIVING TRUST, JOSEPH Address: 13514 E 28TH AVE C - S - Z: SPOKANE, WA 99216 Setbacks: Front Left: Right: Rear: Phone: (509) 926-4249 Group Name: Site Information: Project Name: Plat Key: 001705 Name: MOUNTAIN VIEW 04TH ADD District: Sout Parcel Number: 45274.0610 Block: Lot: SiteAddress: 13514 E 28TH AVE Owner: Name: DICKINSON LIVING TRUST, JOSE Address: 13514 E 28TH AVE Location:: CSV SPOKANE, WA 99216 Zoning: R-3 SF Res District Water District: 010 VERA Hold: ❑ Area: .00 Acres Width: 160 Depth: 125 Right Of Way (ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 1 Review Information: Review Building Plan Review Released By: Originally Released: Permits: 5/1/2008 By: tmelbourn Building Permit Contractor: OWNER Finn: OWNER Phone: (000)000-0000 This Application: Total Project: Description Grp Type Notes So Ft Valuation Sa Ft Valuation 2ND FLOOR R-3 VB BATH ADD 0 $30,000.00 0 $30,000.00 Totals: 0 $30,000.00 0 $30,000.00 Item Description RESIDENTIAL PERMIT FEE WSBC SURCHARGE SF PLNS RVW < 7999 SQ FT Units Unit Desc Fee Amount 1 SELECT $441.75 1 SELECT $4.50 1 SELECT $176.70 Permit Total Fees: $622.95 Operator: JD Printed By: JD Print Date: 5/13/2008 Project Number: 08001624 Inv: 1 Application Date: 5/13/2008 Page. 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Contractor: GOLD SEAL MECHANICAL INC Address: 5524 E BOONE AVE SPOKANE, WA 99212 Plumbing Permit Firm: GOLD SEAL MECHANICAL INC Phone: (509) 535-5944 Notes: w Y¢a., r,a.:,. - .:mm.mfW Payment Summary: ...: :;. s,P„-,3'�.. �' rya'°.ii'a� ":''i9i.,kaFi«"`i,r:°✓ �,a- „�`-iii, 'e`>. 4. ;h„. ��_, SOFnia'�i,T' �.. Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $622.95 $622.95 $0.00 $622.95 $622.95 $622.95 $0.00 $622.95 11_—../_____ --- Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: JD Print Date: 5/13/2008 Spokane jValley* Community Development Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley,,wA 99206 (509)688-0036 "FAX: (509)688-0037 www. spokanevalley.org PERMIT NUMBER: 2 - PERMIT PERMIT FEE: Residential Construction ❑ New Construction ❑ Accessory Bldg Permit Application Addition/Remodel ❑ Deck Other: SITE ADDRESS: i J� 1 A— e-. ! \ oL ; ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Building Owner: Name: Address: ��JC� - ��trj City:����1i State: pR Zip:Lrtz Phone: Fax: Contact Person Name: Phone: A -)-f_3- Describe the scope of work in detail: Contractor: DIMENS19t,S� # OF STORIES: Name: 00 -AA U- C)1bn Address: > A MAIN FLOOR TO City: D State: (OyZip: IMPERVIOUS SURFACE Phone: 2�0 _92 9 IC�.�--J� Fax: 922„�� Contract I,,i o• p Date: I tel' ' City Business Lic. No: DECK/COV. PATIO SQ. 30% SLO SON Cost of Project: $ Proposed Use: �-:Atos� lot,— Authorized ot, **************The following MUST be complete: (write N/A if nota licable)********************** HEIGHT TO PEAK: DIMENS19t,S� # OF STORIES: TOTAL HABITABLE SPACE: MAIN FLOOR TO 2 FLOOR SQ. F ;= : UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE FTG: AREA: FINISHED BASE T G GE Q. FTG: DECK/COV. PATIO SQ. 30% SLO SON SQ. FTG: 1�" PROPERTY: # OF BEDROOMS: 1C NS UCT TYPE: HEAT SOURCE: SEWER OR S P IC?\� The permitee verifies, acknowledged aA%grees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. SIGNATURE: Method of Payment. ❑ Cash Bankcard #: Authorized Signature: REVISED 2115/07 DATE: ❑ Check ❑ Mastercard ❑ VISA Expires: VIN#: SCITI, Of jj''�� "�` 11703 E Sprague Ave Suite B-3♦ Spokane Valley WA 99206 0�11e ♦ 509.688.0036 ♦ Fax: 509.688.0037 p ,,;o* Valley lx. ❑X Completed Building and Mechanical Application with: Accurate address, Parcel Number and/or Legal Description, description of work, owner and contractor information, signature and date. ❑X Three (3) sets of plans including Site Plan, elevations, floor plans, foundation plans with details, roof plan, framing plans and details. FX Show the height of any proposed buildings or accessory structures. ❑X Floor plan for each floor: Dimension to scale(minimum 1/8") and label each room (including sq footage of house and garage on plans) show each level of existing house and square footage of any additions. FX Egress windows: Provide at least one window or exterior door approved for emergency escape or rescue from basement and in every room for sleeping. FX Floor framing details: Joist type, size, spacing and installation details. FX Roof framing plan and details FX Furnace and hot water heater location ❑X All header locations: type, size and connections FX Foundation plan ❑X Insulation information ❑X Decks and Stairway details All braced wall panel types: show locations and details of installation, including engineered design Smoke detector locations 22" x 30" attic access location 18" x 24" crawl space access One-hour separation detail: between house and garage Site Address: 13514 E 28TH AVE Parcel Number: 45274.0610 Zoning: R-3 Fire District: FD 01 Project Transmittal City of Spokane Valley Community Development Department 11703 E. Sprague Ave, Suite 133 Spokane Valley, W k 99206 Phone: 509.688.0036 Water District: VERA Applicant: DICKINSON LIVING TRUST, JOSEP 13514 E 28TH AVE SPOKANE, WA 99216 (509) 926-4249 e-mail: Contact: DICKINSON LIVING TRUST, JOSEP 13514 E 28TH AVE SPOKANE, WA 99216 (509) 926-4249 e-mail: Contractor: OWNER ( ) - 0 Project BATHROOM ADDITION Description: New project Previous pre -app meeting ❑ Plan revisions E Transmittal Date: Tuesdav, Apri129, 2008 Project Number: 08001624 Owner: DICKINSON LIVING TRUST, JOSE 13514 E 28TH AVE SPOKANE, WA 99216 e-mail: Occupant: e-mail: - � w Arch / Engineer: j FDj e-mail: _-) till Please send all plan review and project comments via e-mail to the highlighted individuals. For City Use Only CITYOF PLUS Project Number PkaneSoProject Address 40;0 Valley 11703 E Sprague Ave Suite B-3 ♦Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Proiect Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07 WASHINGTON STATE ENERGY CODE TABLE 6-2 PRESCRIPTIVE REQUIREMENT So" FOR GROUP R OCCUPANCY CLIMATE ZONE 2 Reference Lase 0. Nominal R -values are for wood frame assemblies only or assemblies built in accordance with Section 601.1. 1. Minimum requirements for each option listed. For example, if a proposed design has a glazing ratio to the conditioned floor area of 13%, it shall comply with all of the requirements of the 15% glazing option (or higher). Proposed designs which cannot meet the specific requirements of a listed option above may calculate compliance by Chapters 4 or 5 of this Code. 2. Requirement applies to all ceilings except single rafter or joist vaulted ceilings complying with note 3. 'Adv' denotes Advanced Framed Ceiling. 3. Requirement applicable only to single rafter or joist vaulted ceilings where both (a) the distance between the top of the ceiling and the underside of the roof sheathing is less than 12 inches and (b) there is a minimum 1 -inch vented airspace above the insulation. Other single rafter or joist vaulted ceilings shall comply with the "ceiling" requirements. This option is limited to 500 square feet of ceiling area for any one dwelling unit. 4. Below grade walls shall be insulated either on the exterior to a minimum level of R-12, or on the interior to the same level as walls above grade. Exterior insulation installed on below grade walls shall be a water resistant material, manufactured for its intended use, and installed according to the manufacturer's specifications. See Section 602.2. 5. Floors over crawl spaces or exposed to ambient air conditions. 6. Required slab perimeter insulation shall be a water resistant material, manufactured for its intended use, and installed according to manufacturer's specifications. See Section 602.4. 7. Int. denotes standard framing 16 inches on center with headers insulated with a minimum of R-10 insulation. 8. This wall insulation requirement denotes R-19 wall cavity insulation plus R-5 foam sheathing. 9. Doors, including all fire doors, shall be assigned default U -factors from Table 10-6C. 10. Where a maximum glazing area is listed, the total glazing area (combined vertical plus overhead) as a percent of gross conditioned floor area shall be less than or equal to that value. Overhead glazing with U -factor of U=0.40 or less is not included in glazing area limitations. 11. Overhead glazing shall have U -factors determined in accordance with NFRC 100 or as specified in Section 502.1.5. 12. Log and solid timber walls with a minimum average thickness of 3.5" are exempt from this insulation requirement. 34 Effective July 1, 2007 Glazing Glazing U -Factor Wall 12 Wall* Wall* Slab' Option Area10: Door 9 Ceiling2 Vaulted Above int ext Floors on % of Floor Vertical Overhead" U -Factor Ceiling Grade Below Below Grade Grade Grade I. 12% 0.35 0.58 0.20 R-38 R-30 R-21 R-21 R-12 R-30 R-10 int? II.* 15% 0.35 0.58 0.20 R-38 R-30 R-19 + R-21 R-12 R-30 R-10 R-58 III. 17% 0.32 0.58 0.20 R-38 R-30 R-19 + R-21 R-12 R-30 R-10 R-58 IV. 25% 0.35 0.58 0.20 R-38 / R-30 / R-21 R-15 R-12 R-30 / R-10 / Group R-1 U=0.031 U=0.034 int' / U=0.029 F=0.54 and R-2 U=0.054 Occupancies Only V. Unlimited 0.35 0.58 0.20 R-38 R-30 R-19+ R-21 R-12 R-30 R-10 Group R-3 R_5s and R-4 Occupancies Only VI. Unlimited 0.30 0.58 0.20 R49 or R-38 R-21 R-21 R-12 R-30 R-10 Group R-3 R-38 Adv int? and R-4 Occupancies Only VII. Unlimited 0.32 0.58 0.20 R-38 / R-30 / R-21 R-15 R-12 R-30 / R-10 / Group R-1 U=0.031 U=0.034 int? / U=0.029 F=0.54 and R-2 U=0.054 Occupancies Onl Reference Lase 0. Nominal R -values are for wood frame assemblies only or assemblies built in accordance with Section 601.1. 1. Minimum requirements for each option listed. For example, if a proposed design has a glazing ratio to the conditioned floor area of 13%, it shall comply with all of the requirements of the 15% glazing option (or higher). Proposed designs which cannot meet the specific requirements of a listed option above may calculate compliance by Chapters 4 or 5 of this Code. 2. Requirement applies to all ceilings except single rafter or joist vaulted ceilings complying with note 3. 'Adv' denotes Advanced Framed Ceiling. 3. Requirement applicable only to single rafter or joist vaulted ceilings where both (a) the distance between the top of the ceiling and the underside of the roof sheathing is less than 12 inches and (b) there is a minimum 1 -inch vented airspace above the insulation. Other single rafter or joist vaulted ceilings shall comply with the "ceiling" requirements. This option is limited to 500 square feet of ceiling area for any one dwelling unit. 4. Below grade walls shall be insulated either on the exterior to a minimum level of R-12, or on the interior to the same level as walls above grade. Exterior insulation installed on below grade walls shall be a water resistant material, manufactured for its intended use, and installed according to the manufacturer's specifications. See Section 602.2. 5. Floors over crawl spaces or exposed to ambient air conditions. 6. Required slab perimeter insulation shall be a water resistant material, manufactured for its intended use, and installed according to manufacturer's specifications. See Section 602.4. 7. Int. denotes standard framing 16 inches on center with headers insulated with a minimum of R-10 insulation. 8. This wall insulation requirement denotes R-19 wall cavity insulation plus R-5 foam sheathing. 9. Doors, including all fire doors, shall be assigned default U -factors from Table 10-6C. 10. Where a maximum glazing area is listed, the total glazing area (combined vertical plus overhead) as a percent of gross conditioned floor area shall be less than or equal to that value. Overhead glazing with U -factor of U=0.40 or less is not included in glazing area limitations. 11. Overhead glazing shall have U -factors determined in accordance with NFRC 100 or as specified in Section 502.1.5. 12. Log and solid timber walls with a minimum average thickness of 3.5" are exempt from this insulation requirement. 34 Effective July 1, 2007 EXHAUST FANS irthlt M;than., ;OCFVM bathrooms 1amwry vaa r¢a xa x-�ua2 garCal Aar 1V �cFA�g vb�rvi{q�"pionory WEA °;. °. O iusi rwr PP S6¢-nAt— fwt5T 2 r,o ✓e FLc I J ,ovs gun« PROVIDE DIAGRAMS AND ENGINEERING LAYOUTS FOR HOOF TRUSSES, BEAMS AND LOOR SYSTEMS PRIOR TO FRAMING .Pf- (PIONS CITY COPY THIS BUILDING SUBJECT TO FIELD INSPECTION CORRECTIONS Spo m_ REVIEWED FOS;G:? C MPLIANCE SPOKANE VALLEYn ' �,r) G DIVISION �� S >