2008, 01-25 Permit App: 08000230 GarageProject Number: 08000230 Inv: 1 Application Date: 1/25/2008 Page 1 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Proiect Information:r�k
rr A Frr y
Permit Use: CONSTRUCTION OF (2) CAR GARAGE
Contact: PEPLINSKI, MICHAEL
Address: 12810 E 29TH AVE
C - S - Z: SPOKANE VALLEY, WA 99216
Setbacks: Front Left: Right: Rear:
Phone: (509) 928-6443
Group Name:
Site Information:
Project Name:
Plat Key: 001218 Name: HILL VIEW EST
District: West
Parcel Number: 45273.0803 Block:
Lot:
SiteAddress: 12810 E 29TH AVE Owner: Name: PEPLINSKI, MICHAEL
Address: 12810 E 29TH AVE
Location:: CSV
SPOKANE VALLEY, WA 99216
Zoning: R-2 SF Res Suburban District
Water District: 101 SPO CO WATER DIST#3B
Hold: ❑
Area: .00 Acres Width: 84
Depth: 120 Right Of Way (ft): 0
Nbr of Bldgs: 1 Nbr of Dwellings: 1
Review Information: ,r x .,
Review
Building Plan Review
Originally Released:
Landuse/Zoning/HE Conditions
Originally Released
Released By:
1/25/2008 By: tmelbourn
1/25/2008 By: cjjanssen
Permits:.
Operator: jmm Printed By: jmm Print Date: 1/25/2008
Project Number: 08000230 Inv: I Application Date: 1/25/2008 Page 2 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Contractor: OWNER
Description Grp Type Notes
GARAGE U-1 VB GARAGE
Item Description
RESIDENTIAL PERMIT FEE
ACCESSORY PLANS REVIEW
WSBC SURCHARGE
Building Permit
Firm: OWNER
Phone: (000) 000-0000
This Application: Total Project:
So Ft Valuation SSC Ft Valuation
720 $13,680.00 720 $13,680.00
Totals: 720 $13,680.00 720 $13,680.00
Units
Unit Desc
Fee Amount
1
SELECT
$237.25
1
SELECT
$59.31
1
SELECT
$4.50
Permit Total Fees: $301.06
Notes:
Payment Summary: 2M... -
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $301.06 $301.06 $0.00 $301.06
$301.06 $301.06 $0.00 $301.06
Disclaimer.
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: jmm Print Date: 1/25/2008
9000
MY. 10
aIle
jWky.
Community Development
Permit Center ` '" gy
11703 E Sprague Av to B-3 !ALLEY
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)6gJkPP37 (1
www.spokanevalley.org
Residential Construction
Permit Application
PERMIT NUMBER. -c2,-_ L-,
PERMIT FEE:
Art E cF
t3Ya Ceas ruction ❑ Accessory Bldg
T` Addition/Remodel ❑ Deck ❑ Other:
SITE ADDRESS: 12810 East 29`h Avenue Spokane Valley, WA 99216
ASSESSORS PARCEL NO: 45273.0803 LEGAL DESCRIPTION: Single Family Dwelling
Building Owner:
Name: Mike Peplinski
Address: 12810 East 29 th Avenue
City: Spokane Valley State: Wa Zip:99216
Phone: 370-1696 Fax:
Contact Person
Name: Mike Pe linski
Phone: 370-1696
Describe the scope of work in detail:
Construct 2 car garage
Proposed Use: Garage
Contractor:
Name:
Address:
City: State: Zip:
Phone: Fax:
Contractor Lic No: Exp Date:
City Business Lic. No:
Cost of Project: $ 9500.00
**************The Mowing MUST be complete: write N/A if notapplicable)**********************
HEIGHT TO PEAK:
DIMENSIONS:
# OF STORIES:
TOTAL HABITABLE SPACE:
14'-4"
24'x30'
1
NA
MAIN FLOOR TO SQ.
2 FLOOR SQ. FTG: NA
UNFIN BASEMENT SQ. FTG:
IMPERVIOUS SURFACE
F72�
NA
AREA: 720
FINISHED BASEMENT
GA GE SQ. FTG: 720o
DECK/COV. PATIO SQ. FTG:
30% SLOPES ON
SQ. FTG: 0
72-4D
NA
PROPERTY: None
# OF BEDROOMS: None
CONSTRUCTION TYPE:
HEAT SOURCE: None
SEWER OR SEPTIC? Sewer
Stick Frame
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
SIGNATURE: ���� DATE: 1-24-2008
Method of Payment:
❑ Cash ❑ Check ❑ Mastercard ❑ VISA
Bankcard #: Expires: VIN#:
Authorized Signature:
Effective 10-28-07
Page I of 1
C:\Users\Mike Peplinksi0esktop\Residential Building Permit App.doc
Site Address: 12810 E 29TH AVE
Parcel Number. 45273.0803
Zoning: R-2
Fire District: FD 01
Project
Transmittal
City of Spokane Valley
Community Development
Department
11703 E. Sprague Ave, Suite B3
Spokane Valley, WA 99206
Phone: 509.688.0036
New project El
Previous pre -app meeting ❑
Plan revisions El
Transmittal Date:
Friday, January25, 2008
Project Number. 08000230
Water District: SPO CO WATER DIST#313
Applicant: PEPLINSKI, MICHAEL
12810 E 29TH AVE
SPOKANE VALLEY, WA 99216
(509) 928-6443
e-mail:
Contact: PEPLINSKI, MICHAEL
12810 E 29TH AVE
SPOKANE VALLEY, WA 99216
(509) 928-6443
e-mail:
Contractor. OWNER
( ) - 0
Owner: PEPLINSKI, MICHAEL
12810 E 29TH AVE
SPOKANE VALLEY, WA 99216
e-mail:
Occupant:
e-mail:
Arch / Engineer:
e-mail-
Project CONSTRUCTION OF (2) CAR GARAGE
Description:
Please send all plan review and project comments via e-mail to the
highlighted individuals.
=�SZ73._U8v3
I0,_&Zs. (w --I F4
W
�
�
0
�
Q
.Z
ZLij
m
CL
i
p
I
CITY OF
P
SoKane
,,;WoValle °
Y
For City Use Only
PLUS Project Number
Project Address
11703 E Sprague Ave Suite B-3 ♦ Spokane Vatley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us ifyou haven't heardfrom us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE REV 9/07