Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
1996, 06-21 Permit: 96004720 Storage Shed
SPOKANE COUNTY DIVISION OF BUILDING AND PLANNING 1026 W. BROADWAY • SPOKANE, WA 99260-0050 (509) 456-3675 STYE INFORMATION PROJECT INFORMATION SITE ADDRESS: 10712 E 30TH AVE PROJECT NUMBER: 96004720 ISSUE DATE: 06/21/96 SPOKANE WA 99206 PERMIT USE: STORAGE SHED 16 X 20 PARCEL NUMBER: 45283.5210 APPLICANT: HOLLI BUILT SUBDIVISION: KOKOMO TOWNSITE PHONE: 509 927 6781 LOT: BLOCK: ZONE: UNKN ADDRESS: 1221 N LOCUST RD SPOKANE WA 99206 INSPECTOR: FRANK PALADICHUK CONTACT: MARK HOLLIFIELD PHONE: 509 927 6781 WATER DIST: SETBACKS -> FRONT: 130 LEFT: 40 RIGHT: 5 REAR: 5 OWNER: BECKER, FRANK & BARBARA LENDER NAME: PHONE: 509 928 7136 PHONE: ADDRESS: 10712 E 30TH AVE ADDRESS: SPOKANE WA 99206 „ 8Ui�8i�lfr -06A14I T- CONTRACTOR MARK L HOLLIFIELD LICENSE fit: HOLLIB*099MZ NEW BUILDING DIM.= 16 X 20 1 STORIES SO FT = 320 STORAGE BL U-1 VN 320 TOTAL VALUE: $3,840.00 RESIDENTIAL VALUATION 75.50 STATE SURCHARGE 4.50 RESIDENTIAL SURCHARGE 16.61 TOTAL PERMIT FEE $96.61 PAYMENT SUMMARY PAYMM DATE' `"TtECEiPT# " PAYMENY -AMOUNT -------------------- -------------- 06/21/96 00005651 $96.61 --TOTAL-FEES AMOUNT PAID AMOUNT OWING ----- ------------ ------------- $96.61 $96.61 $.00 ISSUED PERMIT BY: BURRIS, ROBIN NoTFs NOTICE It is the responsibility of the permittee, not Spokane County, to see to it that the use described on the front of this permit complies with applicable codes and requirements and that required inspections are requested. Failure to request required inspections and obtain the necessary approvals prior to progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the owner's/permittee's expense. At a minimum, the following inspections ARE REQUIRED by County Code: 1. FOOTING - when forms and reinforcement are in place and prior to placement of concrete. NOTE: This inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning regulations. Typically, side and rear yard setbacks are measured from property lines, while setbacks for yards abutting streets are measured from the property line or the center line of the roadway right-of-way, whichever provides the greater setback from the center line of the roadway right-of-way. Curb lines and fence lines are not necessarily indicative of property lines. In some residential areas, the County can own as much as 20 feet of right-of-way between your property and the actual improved street/curb. The responsibility to comply with applicable setback provisions lies solely with the permittee —neither Spokane County nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. 2. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete. (Blocking for a manufactured home is required to be inspected prior to the installation of skirting.) 3. FRAMING - after all framing, bracing and blocking is in place, and prior to concealing. 4. INSULATION - prior to the installation of drywall. S. PLUMBING - after rough -in, before covering, and final. 6. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final. 7. FINAL - when complete and prior to occupancy and/or use. Please provide 24 hours notice. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, on-site drainage ("208 swales"), road improvements, parking, and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. In addition to the above any plumbing or mechanical systems or materials which would be concealed by framing, drywall, concrete, etc., must be inspected prior to cover. Check with the department for "special inspections" in conjunction with commercial projects. CALL 456-3675 FOR INSPECTIONS. TO INSURE PROMPT SERVICE, PLEASE GIVE 24 HOUR NOTICE. YOUR INSPECTOR IS UNDER CERTAIN CIRCUMSTANCES, PARTS OF YOUR PROJECT MAY REQUIRE INSPECTIONS FROM OTHER AGENCIES: • Road cuts for utilities or drives, County Engineer's Office 456-3600 or State Department of Transportation 456-3000 • On-site waste disposal system, Spokane County Health District 324-1560 • Construction in a flood plain, County Engineer's Office 456-3600 • Sewer connection, County Utilities Department 456-3604 or City Public Works Department 625-6300 • Electrical wiring, State Department of Labor and Industries 324-2640 EXPIRATION Unless otherwise noted, this permit will be considered null and void by limitation of the work authorized by the permit if not commenced or is stopped for a period of 180 days, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration. At a minimum an inspection should be requested at least once every 180 days to assure the validity of the permit. A permit may be renewed within one year of the date of expiration for one-half the original fee, subject to certain limitations—please call us if you have any questions. MISTAKES? If you think we've made an error in processing this permit or in conducting inspections pertaining to it, or find erroneous information in the permit, please bring it to our attention immediately by filing a written request for correction within 10 working days of discovery. All such requests should be directed to the Division of Building and Planning at the address found on the face of this permit. I certify that I have examined this permit/ application, state that the information contained in it and submitted by me or my agent to compile said permit/ application is true and correct, and authorize Spokane County to proceed with processing. In addition, I have read and understand the INSPECTION REQUIREMENTS/NOTICE provisions included herein and agree to comply with same. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. I understand that the issuance of this permit/ application and any subsequent inspection approvals or Certificates of Occupancy shall not be construed to give authority to violate or cancel the provisions of any state or local law regulating construction, or as a warranty of conformance with the provisions of any state or local laws regulating construction. SIGNATURE OF� APPLICATION OWNER OR AGENT ��v- �'C�o. 4 y� DATE RESIDENTIAL CHAIN LINK FENCE PARTS AND MATERIALS CHECK LIST 'erminal Post Set Line Spacing Posts Apart 30' ....................... 31' ....................... 32' ....................... 33' ....................... 34' ....................... 35' ....................... 36' ....................... 37' ....................... 38' ....................... 39' ....................... 40' ....................... 41' ....................... 42' ....................... 43' ....................... 44' ....................... 45' ....................... 46' .................... 47' ................... 48' ................... 49' ................... 50' .............. .._ 51' ................... 52' ................... 53' ................... 54'__ .............. 55' ................... 56' .......s 57' .......R1 5&' ........ZONI 59' ........ 6b' ........ 041 62' ................... 63' ......... ... 64' ........t.�.:Yi 65' ...............:... 66' ..........: �-.. 67' ................... 68' ............. 69' ................... 70' ................... 7j . i' ................... 7f..............I..... 73' .- ................ 74' ................... 75' ................... 76' ................... 77' ................... 78' ....... 79' ................... 80' ................... 81' ................... 82' ................... 83 .... .......... 84' .- ................ 85' ................... 86' ................... 87' ................... 88' ....................... 89' ....................... 90' ....................... 91' ........ ............. - 92' ....................... 93' ....................... 94' ...................... 95' ....................... 96' ....................... 10' 7' 9.. 8' 8' 3" 8' 6" 8' 9.. 9' 9' 3„ 9' 6„ 9' 9„ 10' 8' 2" 8' 5" 8' 6" 8, 9.. 9' IT'S IMPORTANT... (1) that fence footings do not exceed legally established property lines. If uncertain, refer to real estate agents line plot or consult a professional surveyor. (2) to check local codes for specifications regarding frontage locations, height, etc. A permit may be required. (3) to check with local utility companies for locations of underground cables or pipe lines. LAYOUT/DESIGN TOOLS YOU WILL FIND USEFUL 1. String or chalk line and stakes. 2. Tape measure. 3. Post hole digger. 4. Wheelbarrow, shovel and hoe to mix and transport concrete. 5. Carpenter's level. 6./7" x 9/6" wrench or crescent wrench. T Hacksaw or pipe cutter. 8. Fence stretcher. 9. Pliers. 9, 9,. 9' 10" 9' 9' 2„ 9, 2„ 9' 3„ 9' 5„ 9, 6„ 9. 7.. /v 4 � �t Offset String over property line Stakes Q--- --� ------� ------� ----------C� tL 17 �j End, Posts = E i Corner Posts = C Lt L j 3 r Line Posts = L r L Gate Posts = G DESCRIPTION QUANTITY TO U TERMINAL POSTS As required (2 for each gal (End, Corner, and Gate Posts) Divide the total footage of your (less gate openings) by 10 anc LINE POST tract 1. Subtract 1 additional lir (Intermediate Post) for each comer post used. USE line post is recommended for i longer than 10 feet. For each end post, use 3 for 4', use 4 each for 5' and u TENSION BANDor —'- each for 6'. Same for gate pc Double the quantity for come BRACE BAND tee© 1 for each rail end X 1'/4" CARRIAGE BOLT , 1 for each brace band, 1 for tension band POST CAP 1 for each terminal post EYE -TOP �J 1 for each line post TOP RAIL, Same lineal footage as fencE plain or swedged end 1 for each end post RAIL -END ((�l 1 for each gate post 2 for each corner post 1 for each length of plain end TOP RAIL SLEEVE Not needed for swedged end 1 for each end post TENSION BAR 1 for each gate post 2 for each corner post Same lineal footage of fence FENCE FABRIC gate openings TIE WIRES 1 for every 24" of top rail an, every 12' of line posts I DOUBLE DRIVE Individual fittings as indicate( GATE SINGLE WALK Individual fittings as indicate( GATE POST HINGE q 2 for single walk gate, (Male Hinge) 4 for double drive gate W X 3" CARRIAGE BOLT 1 for each post hinge GATE HINGE �� 2 for single walk gate, (Female Hinge) 4 for double drive gate