Loading...
2008, 09-18 Permit App: 08003608 Patio CoverPfoject Number: 08003608 Inv: I Application Date: 9/18/2008 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit SiteAddress: 10820 E 30TH AVE Location:: CSV Zoning: R-3 SF Res District Water District: 007 MODEL Area: 13,000 Sq Ft Width: 0 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Owner: Name: DREHER, RICHARD J & DEANNA Address: 10820 E 30TH AVE SPOKANE, WA 99206-7136 Hold: ❑ Depth: 0 Right Of Way (ft): 0 Review Information:M ,�_... ... ,,.,.. Review Building Plan Review Released By: Originally Released: 9/15/2008 By: tmelbourn Landuse/Zoning/HE Conditions Released By: Originally Released: 9/18/2008 By: mpalaniuk Permits: Operator: JD Printed By: jmm Print Date: 9/18/2008 Project Nwnber: 08003608 Inv: I Application Date: 9/18/2008 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Building Permit Contractor: OWNER Firm: OWNER Phone: (000) 000-0000 This Application: Total Project: Description Grp Type Notes So Ft Valuation Sa Ft Valuation COV DECK R-3 VB 400 $6,000.00 400 $6,000.00 Totals: 400 $6,000.00 400 $6,000.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $125.25 WSBC SURCHARGE 1 SELECT $4.50 SF PLNS RVW < 7999 SQ FT 1 SELECT $50.10 Permit Total Fees: $179.85 Notes v .��r._ ro Payment Summary: ,:: ._ s"n: r.,, _:rsrs �„✓�/, Y , ...;,".;�rio�.«�..?,,,:_ ..�id.�`3. �, , c,.__s2 .�,�%i �%!�5„ ,. n b£k.»�.a..F. Permit Tvne Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $179.85 $179.85 $0.00 $179.85 $179.85 $179.85 $0.00 $179.85 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: jmm Print Date: 9/18/2008 Permit Center 11703 E Sprague Ave, Suite B-3 cm of Spoka`,n�e,Spokane Valley, WA 99206 Alley- (509)688-0036 FAX: (509)688-0037 ,;o0 www.Mokanevalley.org Community Development PERMIT NUMBER: PERMIT FEE: Residential Construction ❑ New Construction ❑ Accessory Bldg Permit Application ❑ Addition/Remodel ❑ Deck ❑ Other: SITE ADDRESS: J��G) 606 9 1a0(�' ASSESSORS PARCEL NO: LrJLS3, 590 LEGAL DESCRIPTION: "'Om'o -t0WA--4e_ Li -a 66a Building Owher• Name: Address:1CaC> 6'& ?�IL` City: i10.�\�, State: U -A Zip: Phone: cia(� q'53 Fax: Contact Person' Name. `� c- Phone: Describe the scope of work in detail: Aec Proposed Use: Contractor: Name: Address: City: State: Zip: Phone: Fax: Contractor Lic No: Exp Date: City Business Lic. No: Cost of Project: $ **************The followin MUST be com Tete: (write N/A if not a licable)********************** HEIGHT .PEAK: Aq DIMENSIONS: wrl'x a�� # OF STORIES: TOTAL HABITABLE SPACE: 4 MAIN FLOOR TO SQ. 2 FLOOR SQ. FTG: UNFINASEMENT SQ. FTG: IMPERVIOUS SURFACE AREA: FTG: \ X30 1i 5hlr ►es FINISHED BASEMENT GARAGE SQ. FTG: DEC COV. PATIO FTG: 1400 30% SLOPES ON NIA SQ. FTG: OM 52a of-- PROPERTY: # OF BEDROOMS: �J CON T�1 CTION TYPE: HEA Gas TA. SEWER OR SEPTIC? 5e'De(z' rtir The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can a::� bbe processed. SIGNATURE: DATE: 9_a os Method of Payment. ❑ Cash ❑ Check Bankcard #: Authorized Signature: REVISED 2/15/07 ❑ Mastercard ❑ VISA Expires: VIN#: SMene'*�11703 E Sprague Ave Suite B-3♦ Spokane Valley WA 99206 ♦509.688.0036 ♦ Fax: 509.688.0037 Valle Y MX Completed Building and Mechanical Application with: Accurate address, Parcel Number and/or Legal Description, description of work, owner and contractor information, signature and date. MX Three (3) sets of plans including Site Plan, elevations, floor plans, foundation plans with details, roof plan, framing plans and details. ❑X Show the height of any proposed buildings or accessory structures. ❑X Floor plan for each floor: Dimension to scale(minimum 1/8") and label each room (including sq footage of house and garage on plans) show each level of existing house and square footage of any additions. r7j Egress windows: Provide at least one window or exterior door approved for emergency escape or rescue from basement and in every room for sleeping. ❑X Floor framing details: Joist type, size, spacing and installation details ❑X Roof framing plan and details ❑X Furnace and hot water heater location ❑X All header locations: type, size and connections EX Foundation plan ❑X Insulation information pR Decks and Stairway details All braced wall panel types: show locations and details of installation, including engineered design Smoke detector locations 22" x 30" attic access location 18" x 24" crawl space access One-hour separation detail: between house and garage &4 0 W O �o o a a W G ............ Z_ Z J W � a m o m 151^" f' 4-1 ince Fie LL P ............ l 1 C,:�%Xcz, oV\ �---1 ��► �\��� �IY1171� ` 1 , ince Fie LL T IC -t4-14-1 C3 cr 0 410 7 7/1 H4S - f)c> Nl -r t c,4rto�f R00�1�sk1% Ig !, � '16, t4 N tgQ"rl �,Q S IC t,)% '� X4 0�,�- e`yej Components uwoL%ncrhw--P M 4976 Industrial Avenue Coeur d'Alene, 10 83814 Phone: 208-766-3307 Fax; 208-785-2876 JOB NAME: 2040 ORDERED BY: ROOF TRUSSES LOADING INFORMATION I PROFILE QTY PITCH TYPE -- -- -- ID SPAN SPAN TOP BOT I LE RIGHT FINK Al 20-00.00 2"13-00 2X 4 2Xe 02-00.00 02-043-09GABLE AIDG 20-00-00 2&4000 2Y b 2 X 4102-0 O.W 0200 00 LOT # SUI3dIV: CONTACT: arAesr iNca. ROQF TRUSS SpACING:24.0 IN. O -C. (iYP-) 10 4.00 .•��T� I 4.00 NOTES: WLL OFF GROUND DELIVERY INCLUDED IN QUOTE. ".USTOMER TO APPROVE TRUSS DRAWINGS and Quanitlas. G M A 8M a -j83 8T I 00 7VIt�1 F?� QT �4 F, 4r! 2M:37 aY8 FIOOJ� >LA, rriT'�4IR1 TERMS AGREFMFNT (PRICE 13 GOOD FOR 9a DAYS FROM DATE QUOTED) A- Delivery to the site I plate line will be determined by aecesslbilsy, STOCK'a equipment Iim Wion and s.erety. S. Any and all labor or material Charges submined to STOCK COMPONENTS must he pre -approved. C. 5100 tee If order Is cancelled or changed afbr the order hes been placed. Additional charge` may also apply. D. Completed Jobe in yard may be itwolced eller build date, unless other terms have been pre -approved - E. Spcciel storage needs or considerations for tho tiinishe0 trusses need to be errenged by tho ov n-. F. Truss hangers, ties, etc. listed by STOCK COMPONENTS are suggections onty. As rcquircd by 2000/2ooe ins, all rural truss dcsign drawings have been providcd to the Customer/OwnerlContmctor for rovicw and approval. TCOUSU? 0010.JI08 4 i 21401T03HF1 0 AOIT')39aL41 GJ319 0"T SUBTOTAL SALES TAX 8,600% GRAND TOTAL $48.14 $746.56 Ca] 1 mlV a C006 L 240 QUIOTEg Q19857 SALES REP: HOUSE Cay DATE a o QUOT@ I HLT 08129!06 YOUT 1 ° 1 D661ONE HLT 08I2WO LOT # SUI3dIV: CONTACT: arAesr iNca. ROQF TRUSS SpACING:24.0 IN. O -C. (iYP-) 10 4.00 .•��T� I 4.00 NOTES: WLL OFF GROUND DELIVERY INCLUDED IN QUOTE. ".USTOMER TO APPROVE TRUSS DRAWINGS and Quanitlas. G M A 8M a -j83 8T I 00 7VIt�1 F?� QT �4 F, 4r! 2M:37 aY8 FIOOJ� >LA, rriT'�4IR1 TERMS AGREFMFNT (PRICE 13 GOOD FOR 9a DAYS FROM DATE QUOTED) A- Delivery to the site I plate line will be determined by aecesslbilsy, STOCK'a equipment Iim Wion and s.erety. S. Any and all labor or material Charges submined to STOCK COMPONENTS must he pre -approved. C. 5100 tee If order Is cancelled or changed afbr the order hes been placed. Additional charge` may also apply. D. Completed Jobe in yard may be itwolced eller build date, unless other terms have been pre -approved - E. Spcciel storage needs or considerations for tho tiinishe0 trusses need to be errenged by tho ov n-. F. Truss hangers, ties, etc. listed by STOCK COMPONENTS are suggections onty. As rcquircd by 2000/2ooe ins, all rural truss dcsign drawings have been providcd to the Customer/OwnerlContmctor for rovicw and approval. TCOUSU? 0010.JI08 4 i 21401T03HF1 0 AOIT')39aL41 GJ319 0"T SUBTOTAL SALES TAX 8,600% GRAND TOTAL $48.14 $746.56 Ca] PROVIDE DIAGRAMS AND ENGINEERING LAYOUTS FOR ROOF TRUSSES, BEAMS AND FLOOR SYSTEMS PRIOR TO FRAMING INSPECTIONS THA BUILDING SUBJECT TO FIELD N- 8PECTION CORRECTIONS �` ky REVIEWED FOR CODE COMPLIANCE SPOKANE VALLEY B LDING VISION ` b For City Use Only d' CITYSp6kane � PLUS Project Number Project Address l t r r Vaylle° 11703 E Sprague Ave Suite B-3 ♦Spokane Valley. WA 99206 41, 00 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org i As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. r _l Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Proiect Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK -BUILDING FILE REV 9/07