2008, 11-05 Permit App: 08004372 Pole Bldg Project Number: 08004372 Inv: 1 Application Date: 11/5/2008 Page 1 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: 30 X 42 POLE BLDG Contact: SPOKANE STRUCTURES
Address: 510 N MULLAN ST
C-S-Z: SPOKANE,WA 99206
Setbacks:Front Left: Right: Rear: Phone: (509)927-0655
Group Name:
Site Information
Project Name:
Plat Key: 001393 Name: KOKOMO TOWNSITE(FEES) District: Sout
Parcel Number: 45283.4716 Block: Lot:
SiteAddress: 11107 E 30TH AVE Owner:Name: PARMENTIER,STEPHEN R.
Address: 11107 E 30TH AVE
Location::CSV SPOKANE,WA 99206
Zoning: R-3 SF Res District
Water District: 007 MODEL Hold: ❑
Area: 13,000 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 70
Nbr of Bldgs: 1 Nbr of Dwellings: 1
Review Information: ...._ rtmatt,.., ,,,......
Review
Building Plan Review Released By: I
Originally Released: 11/4/2008 By: tmelbourn
Landuse/Zoning/HE Conditions Released By:
Originally Released: 11/5/2008 By: tschmidt
ermits: . ,., ...._ ... z. F- A.. . . ..... ,� ... . ,ka ... .... ...
Operator: JD Printed By: jmm Print Date: 11/5/2008
Project Number: 08004372 Inv: 1 Application Date: 11/5/2008 Page 2 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Building Permit
Contractor: SPOKANE STRUCTURES INC Firm: SPOKANE STRUCTURES INC
Address: 510 N MULLAN RD Phone: (509)927-0655
SPOKANE,WA 99206
This Application: Total Project:
Description Grp Type Notes Su Ft Valuation Sq Ft Valuation
POLE BDLG U-1 VB 1,260 $23,940.00 1,260 $23,940.00
Totals: 1,260 $23,940.00 1,260 $23,940.00
Item Description Units Unit Desc Fee Amount
RESIDENTIAL PERMIT FEE 1 SELECT $377.25
ACCESSORY PLANS REVIEW 1 SELECT $94.31
WSBC SURCHARGE 1 SELECT $4.50
Permit Total Fees: $476.06
Payment Summary: ,,.- .vv _. ::
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $476.06 $476.06 $0.00 $476.06
$476.06 $476.06 $0.00 $476.06
Disclaimer:
Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information
contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: jmm Print Date: 11/5/2008
Permit Center •
Scm of�T% 11703E Sprague Ave, Suite B-3 PERMIT NUNIBER: L �'�'�
pokane Spokane Valley, WA 99206 PERMIT FEE:
_Valley. (509)688-0036 FAX: (509)688-0037
www.spokanevalley.org
Community Development
Residential Construction ('New Construction Accessory Bldg
Permit Application I—I Addition/Remodel Deck
n Other:
SITE ADDRESS: / / /00 f vo Sp0 11 d,ii1Lei 9 12'
ASSESSORS PARCEL NO: L5 ";' ,9`33- i '7 l 4%7 LEGAL DESCRIPTION:
Building Owner: p Contractor:
. Name: Cir-_ v PAR-N t'Il�1--/E. Name:
�/ C EPORANE STRUCTURBS, INC.
Address:r i 1 0,7
tic Address:
510 N. MULLAN ROAD
City: State: Zip:C/�'J City: State: Zip:
�fJ�(��¢K�C�I�- I`tG� SP(1KANF. VAT,T,RY WA Zip:
Phone:/ " / 10Fax: Phone: Fax:
_ g„.3 1...
509-977-0655 509-977-4067
Contractor Lic No: Exp Date: ii lac/
ContactPerson
/
Person City Buse ess ttic 1112 6 0C
Name: D ',ex)tS -i2- Q 4.("Ake--
Phone:
" e—
Phone: S 0 Q- d-7- 0 G SS`
0
Describe the scope of work in detail: Cost of Project: $ )( �''V
Peis r FRAM-- ' GI 2-l)//1/6—
Proposed Use: Gem'S ( D C-,Jr}Tit''a-t... 6:4--e-46-L7--- Ag.op
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK: DIMENSIONS: #OF STORIES: TOTAL HABITABLE SPACE:
MAIN FLOOR q 0 SQ. 2"" FLOOR SQ. FTG: /
UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE
FTG: AREA:
/ ��D r I
FINISHED BASEMENT RAPE SQ. FTG: DECK/COV. PATIO SQ. FTG: 30% SLOPES ON
SQ. FTG: U PROPERTY:
#OF BEDROOMS: NSTRU TION TYPE: HEAT SOURCE: SEWER OR SEPTIC?
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
SIGNATURE: DATE: 7/474F
Method of Payment:
E Cash ❑ Check ❑ Mastercard ❑ VISA
Bankcard#: Expires: VIN#:
Authorized Signature:
REASED:14s;07
SCITY OF‘ ,
poKane .
�aey�
11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
509.688.0036 • Fax: 509.688.0037 ♦ cityhall®spokanevatley.org
Residential Plan Submittal Minimums
❑ Completed Building & Mechanical application with: Accurate address, Parcel
Number and/or Legal Description, description of work, owner and contractor
information, signature, and date.
❑ Two sets of plans including Site Plan, elevations, floor plans, foundation plans
With details, roof plan, framing plans & details.
O Show the height of any proposed buildings or accessory structures.
❑ Floor plan for each floor: Dimension to scale (minimum 1/8") and label each
Room (including sq. footage of house and garage on plans) Show each
level of existing house and square footage of any additions.
❑ All braced wall panel types: show locations and details of installation, including
engineered design.
❑ Egress windows: Provide at least one window or exterior door approved for
Emergency escape or rescue from a basement and in every room for sleeping.
❑ Smoke detector locations
❑ 22" X 30" attic access location
❑ 18" X 24" crawl space access:
❑ One-hour separation detail: between house and garage
❑ Floor framing details: Joist type, size, spacing and installation details
O Roof framing plan and details
❑ Furnace and hot water heater location.
❑ All header locations: type, size, and connections
❑ Foundation plan
❑ Insulation information
• New project 0
011.1.11\11101k
Project Precious pre-app meeting ❑
san POI(ane
Transmittal Plan recisions
City of Spokane Valley Transmittal Date:
41000
Valley Community Development Thursday,No2ember06,2008
Department
11703 E.Sprague Ave,Suite B3
Spokane Valley,WA 99206
Phone:509.688.0036
Site Address: 11107 E 30TH AVE Project Number: 08004372
Parcel Number: 45283.4716
Zoning: R-3 Water District: MODEL
Fire District: FD 01
Applicant: SPOKANE STRUCTURES Owner: PARMENTIER, STEPHEN R.
510 N MULLAN ST 11107 E 30TH AVE
SPOKANE, WA 99206 SPOKANE, WA 99206
(509) 927-0655
e-mail: e-mail:
Contact: SPOKANE STRUCTURES Occupant:
510 N MULLAN ST
SPOKANE, WA 99206 e-mail:
(509) 927-0655
e-mail:
Contractor: SPOKANE STRUCTURES INC Arch/Engineer:
510 N MULLAN RD
SPOKANE, WA 99206
(509) 927-0655
e-mail:
Project 30 X 42 POLE BLDG
Description:
Building Landuse Engineer Utilities Health Fire Dist Assessor
ENGINEERS LETTER
GABLE OVERHANG
Please send all plan review and project comments via e-mail to the
highlighted individuals.
PERMIT CENTER
CITY OF
pQl< Project Transmittal 4/
jValleY' 11703 E Sprague Ave. Suite B-3 Spokane Valley WA 99206
Phone: 509.688.0036 Fax: 509.688.0037
,.__-:
New Application/Pre-Application ❑ Provide one of the following (REQUIRED FOR ACCEPTANCE):
Response to Review Comments o PLUS Project#: 6'760 4S 7 2
Revisions to Application iQ . Parcel Number: 47.52 23. 47/6
Other (Describe Below): ❑ Site Address: ///p7 ,E.. 0e --.
Route to (Please check all that apply):
1 Division #of Sheets/Type of Document/#of Copies Received by:
wilding v4VER ED/INITIALS
/ -, /we e06 Le ?Z"F,e / 3 ,°- . ...._
/ <sG eG.S 4vee N'e-l< l,.5___ ii j
/ /
/ /
QC Check by:
❑ Development Engineering / / VERIFIED/INITIALS
I /
/ / E
/ /
CI
QC Check by:
VERIFIED/INITIALS
❑ Planning / / o
/ / E
/ /
/ / o
QC Check by:
O SV Fire Department / / VERIFIED/INITIALSo
/ I
/ / o
/ I
0
QC Check by:
Project Contact Information:
Name: Z--.e�� Uh26C ff Phone: F27--eez_ 7S---
Email: / ,o,��Or S S TL C'O.yes�,,s . /t/ ( Fax: 2 7 -4o6 7
Relationshipipto Project:
❑ Architect 0 Engineer 0 Other Design Professional contractor 0 Owner/Applicant
DATE STAMP:
1f2
ifs f - c"
T /
f � �
I
PLANNING DEPT. APPROVED
Ma 7 /4 0ffe i BY:
Asa 8a. 4/7/a
DATE: /1/5/e53
:391L___.......__._
For City Use Only
CITY OF PLUS Project Number ( �
;°; (ijt-4.37�--
pokane Project Address
p
1, i ii; -f-j) l'L .--..
a Q °
y 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 • Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re-submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
> Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure,you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone,fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re-
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE-APPLICANT PINK-BUILDING FILE REV 9/07