Loading...
2008, 11-05 Permit App: 08004372 Pole Bldg Project Number: 08004372 Inv: 1 Application Date: 11/5/2008 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: 30 X 42 POLE BLDG Contact: SPOKANE STRUCTURES Address: 510 N MULLAN ST C-S-Z: SPOKANE,WA 99206 Setbacks:Front Left: Right: Rear: Phone: (509)927-0655 Group Name: Site Information Project Name: Plat Key: 001393 Name: KOKOMO TOWNSITE(FEES) District: Sout Parcel Number: 45283.4716 Block: Lot: SiteAddress: 11107 E 30TH AVE Owner:Name: PARMENTIER,STEPHEN R. Address: 11107 E 30TH AVE Location::CSV SPOKANE,WA 99206 Zoning: R-3 SF Res District Water District: 007 MODEL Hold: ❑ Area: 13,000 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 70 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Review Information: ...._ rtmatt,.., ,,,...... Review Building Plan Review Released By: I Originally Released: 11/4/2008 By: tmelbourn Landuse/Zoning/HE Conditions Released By: Originally Released: 11/5/2008 By: tschmidt ermits: . ,., ...._ ... z. F- A.. . . ..... ,� ... . ,ka ... .... ... Operator: JD Printed By: jmm Print Date: 11/5/2008 Project Number: 08004372 Inv: 1 Application Date: 11/5/2008 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Building Permit Contractor: SPOKANE STRUCTURES INC Firm: SPOKANE STRUCTURES INC Address: 510 N MULLAN RD Phone: (509)927-0655 SPOKANE,WA 99206 This Application: Total Project: Description Grp Type Notes Su Ft Valuation Sq Ft Valuation POLE BDLG U-1 VB 1,260 $23,940.00 1,260 $23,940.00 Totals: 1,260 $23,940.00 1,260 $23,940.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $377.25 ACCESSORY PLANS REVIEW 1 SELECT $94.31 WSBC SURCHARGE 1 SELECT $4.50 Permit Total Fees: $476.06 Payment Summary: ,,.- .vv _. :: Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $476.06 $476.06 $0.00 $476.06 $476.06 $476.06 $0.00 $476.06 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: jmm Print Date: 11/5/2008 Permit Center • Scm of�T% 11703E Sprague Ave, Suite B-3 PERMIT NUNIBER: L �'�'� pokane Spokane Valley, WA 99206 PERMIT FEE: _Valley. (509)688-0036 FAX: (509)688-0037 www.spokanevalley.org Community Development Residential Construction ('New Construction Accessory Bldg Permit Application I—I Addition/Remodel Deck n Other: SITE ADDRESS: / / /00 f vo Sp0 11 d,ii1Lei 9 12' ASSESSORS PARCEL NO: L5 ";' ,9`33- i '7 l 4%7 LEGAL DESCRIPTION: Building Owner: p Contractor: . Name: Cir-_ v PAR-N t'Il�1--/E. Name: �/ C EPORANE STRUCTURBS, INC. Address:r i 1 0,7 tic Address: 510 N. MULLAN ROAD City: State: Zip:C/�'J City: State: Zip: �fJ�(��¢K�C�I�- I`tG� SP(1KANF. VAT,T,RY WA Zip: Phone:/ " / 10Fax: Phone: Fax: _ g„.3 1... 509-977-0655 509-977-4067 Contractor Lic No: Exp Date: ii lac/ ContactPerson / Person City Buse ess ttic 1112 6 0C Name: D ',ex)tS -i2- Q 4.("Ake-- Phone: " e— Phone: S 0 Q- d-7- 0 G SS` 0 Describe the scope of work in detail: Cost of Project: $ )( �''V Peis r FRAM-- ' GI 2-l)//1/6— Proposed Use: Gem'S ( D C-,Jr}Tit''a-t... 6:4--e-46-L7--- Ag.op **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: DIMENSIONS: #OF STORIES: TOTAL HABITABLE SPACE: MAIN FLOOR q 0 SQ. 2"" FLOOR SQ. FTG: / UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE FTG: AREA: / ��D r I FINISHED BASEMENT RAPE SQ. FTG: DECK/COV. PATIO SQ. FTG: 30% SLOPES ON SQ. FTG: U PROPERTY: #OF BEDROOMS: NSTRU TION TYPE: HEAT SOURCE: SEWER OR SEPTIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. SIGNATURE: DATE: 7/474F Method of Payment: E Cash ❑ Check ❑ Mastercard ❑ VISA Bankcard#: Expires: VIN#: Authorized Signature: REASED:14s;07 SCITY OF‘ , poKane . �aey� 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 ♦ cityhall®spokanevatley.org Residential Plan Submittal Minimums ❑ Completed Building & Mechanical application with: Accurate address, Parcel Number and/or Legal Description, description of work, owner and contractor information, signature, and date. ❑ Two sets of plans including Site Plan, elevations, floor plans, foundation plans With details, roof plan, framing plans & details. O Show the height of any proposed buildings or accessory structures. ❑ Floor plan for each floor: Dimension to scale (minimum 1/8") and label each Room (including sq. footage of house and garage on plans) Show each level of existing house and square footage of any additions. ❑ All braced wall panel types: show locations and details of installation, including engineered design. ❑ Egress windows: Provide at least one window or exterior door approved for Emergency escape or rescue from a basement and in every room for sleeping. ❑ Smoke detector locations ❑ 22" X 30" attic access location ❑ 18" X 24" crawl space access: ❑ One-hour separation detail: between house and garage ❑ Floor framing details: Joist type, size, spacing and installation details O Roof framing plan and details ❑ Furnace and hot water heater location. ❑ All header locations: type, size, and connections ❑ Foundation plan ❑ Insulation information • New project 0 011.1.11\11101k Project Precious pre-app meeting ❑ san POI(ane Transmittal Plan recisions City of Spokane Valley Transmittal Date: 41000 Valley Community Development Thursday,No2ember06,2008 Department 11703 E.Sprague Ave,Suite B3 Spokane Valley,WA 99206 Phone:509.688.0036 Site Address: 11107 E 30TH AVE Project Number: 08004372 Parcel Number: 45283.4716 Zoning: R-3 Water District: MODEL Fire District: FD 01 Applicant: SPOKANE STRUCTURES Owner: PARMENTIER, STEPHEN R. 510 N MULLAN ST 11107 E 30TH AVE SPOKANE, WA 99206 SPOKANE, WA 99206 (509) 927-0655 e-mail: e-mail: Contact: SPOKANE STRUCTURES Occupant: 510 N MULLAN ST SPOKANE, WA 99206 e-mail: (509) 927-0655 e-mail: Contractor: SPOKANE STRUCTURES INC Arch/Engineer: 510 N MULLAN RD SPOKANE, WA 99206 (509) 927-0655 e-mail: Project 30 X 42 POLE BLDG Description: Building Landuse Engineer Utilities Health Fire Dist Assessor ENGINEERS LETTER GABLE OVERHANG Please send all plan review and project comments via e-mail to the highlighted individuals. PERMIT CENTER CITY OF pQl< Project Transmittal 4/ jValleY' 11703 E Sprague Ave. Suite B-3 Spokane Valley WA 99206 Phone: 509.688.0036 Fax: 509.688.0037 ,.__-: New Application/Pre-Application ❑ Provide one of the following (REQUIRED FOR ACCEPTANCE): Response to Review Comments o PLUS Project#: 6'760 4S 7 2 Revisions to Application iQ . Parcel Number: 47.52 23. 47/6 Other (Describe Below): ❑ Site Address: ///p7 ,E.. 0e --. Route to (Please check all that apply): 1 Division #of Sheets/Type of Document/#of Copies Received by: wilding v4VER ED/INITIALS / -, /we e06 Le ?Z"F,e / 3 ,°- . ...._ / <sG eG.S 4vee N'e-l< l,.5___ ii j / / / / QC Check by: ❑ Development Engineering / / VERIFIED/INITIALS I / / / E / / CI QC Check by: VERIFIED/INITIALS ❑ Planning / / o / / E / / / / o QC Check by: O SV Fire Department / / VERIFIED/INITIALSo / I / / o / I 0 QC Check by: Project Contact Information: Name: Z--.e�� Uh26C ff Phone: F27--eez_ 7S--- Email: / ,o,��Or S S TL C'O.yes�,,s . /t/ ( Fax: 2 7 -4o6 7 Relationshipipto Project: ❑ Architect 0 Engineer 0 Other Design Professional contractor 0 Owner/Applicant DATE STAMP: 1f2 ifs f - c" T / f � � I PLANNING DEPT. APPROVED Ma 7 /4 0ffe i BY: Asa 8a. 4/7/a DATE: /1/5/e53 :391L___.......__._ For City Use Only CITY OF PLUS Project Number ( � ;°; (ijt-4.37�-- pokane Project Address p 1, i ii; -f-j) l'L .--.. a Q ° y 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. > Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone,fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE-APPLICANT PINK-BUILDING FILE REV 9/07