Loading...
09-138.00 Inland Asphalt: Pines-Mansfield Corridor Congestion Relief 4 ~ t Washington State Change O e r Departmerrt of TYansportation Date 8/12/2009 Page 1 of 3 Pages Contract Number 08-016 Federal Aid Number CM-9932 (032) Contract Title Pines-Manfield Corridor Congestion Relief Project Change Order Number 31 Prime Contractor Inland Asphalt ~ Ordered by Engineer under the terms of Section 1-04.4 of the Standard Specifications ❑ Change proposed by Contractor Endorsed By Surety Consent 1 ~ c Contractor t// Attomey on Fact - 0° 4-n I Date I Date Original Contract Amount 3,061,916.95 Current Contract Amount 3,278,386.32 Estimated Net Change This Order 5,201.28 Estimated Contract Total After Change 3,2833587.60 Approval Required [I Region ❑ Olympia Service Center ~ Local Agency - If the amount authorized in the Local Agency Agreement is exceeded and federal funds are not available for this change, the Local Agency will assume the total cost of this Change Order. ~ Approval Recommended F-] Approved Approved - ~ ProJect Englneer Approving Authority per C.A. Agreement 2~ ~~v d 9 k' ~ ?~d Date ~ Date F] Approval Recommended F-] Approved Other Approval When Required By Stgnature Date Date RepTesent(ng DOT Form 140-005 EF Revised 10/97 rCoo) - 13~ L CHANGE ORDER Page 2 of 3 Contract No: 08-016 Change Order No. 31 This Contract is revised as follows: Description of Work The Contractor shall install an additional curb wall along Mansfield Avenue. The additional curb wall shall extend from the previously constructed curb wall to approximately Station M 21 +25. The additional curb wall shall be approximately 130 LF. The work shall include any excavation necessary to complete the additional curb wall. Payment Payment shall be made for the following item: New contract item: "Additional Curb Wall", Lump Sum. Contract Time ' Contract tirne will not be adjusted as a result of this Change Order. ~a CHANGE ORDER Page 3 of 3 Contract No: 08-016 Change Order No. 31 Item No. Group No. Item Description Unit Unit Price Est. Qty. Est. Amt. Change Measure Change NEUV 5 Additional Curb Wall L.S 5,201.28 1 $ 5,201.28 TOTAL $5,201.28