09-144.00 WSDOT: Broadway Ave Rehab Project 2 ~ ---z ~ ~ Washingt< rarte AGEIVC~ ~ WArf Department of 7ransportation Local Agency Agreement Supplement Agency Suppiement Number City of Spokane Valley 1 Federal Aid Project Number Agreement Number CFDA No. 20.205 STPUL - 3 846 (008) LA 6776 (Catalop of Federal Domestic Assistance) The Local Agency desires to supplement the agreement entered into and executed on lune 19, 2006 All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Project Description Name Broadway Avenue Rehabilitation Project No. 2 Length 1900LF Termini 200' east of Fancher Rd to 300' west of Thierman Rd Description of Work 0 No Change The project will patch grind and overlay 2 inches of HMA. Work will include ADA improvements to the sidewalk and addition of concrete inlets, catchbasin Type 2 with spill control separators and replacement of existing drywells. Reason for Supp9emznt To authorize construction funds and advertise June 12, 2009. Does this change require additional Right of Way or Easements? ā‘ Yes Eg No Estimate of Funding T e of Work (2) (3) (a) (5) yp Previous Supplement Estimated Total Estimated Agency Estimated AgreemenVSuppl. Project Funds Funds Federal Funds PE a. Aqencv 59,800.001 59,800.001 8,073.001 51,727.00 86.5 % b.Other c. Other I Federal Aid d. State I 1,000.00 1,000.00 135.00 865.00 Participation Ratio for PE e. Total PE Cost Estimate (a+b+c+d) I 60,800.00 ā€¢ I 60,800.00 8,208.001 52,592.00 Right of Way f. AQencv % g.Other Federal Aid h. Other Participation I I ( ( ~ Ratio for RW i. State j. Total R/W Cost Estimate (f+g+h+i) I ~ ~ ! Construction k. Contract I ~ 545,800.00 545,800.00 73,683.001 472,117.00 1. Other m. Other n. Other 86.5 % o. AQencv Federal Aid Participation pā€¢ State I I 1,000.00 1,000.001 135.001 865.00 Ratio for CN q. Total CN Cost Estimate (k+l+m+n+o+p) 1 546,800.00 1 546,800.00 73.818.001 472,982.00 r. Total Proaect Cost Estlmate (e+i+q) 1 60.800.001 546.800.00 1 607.600.00 1 82.026.001 525374.00 , The Local Agency further stipulates that pursuant to said Title 23, regulations and policies and procedures, and as a condition to payment of the Federal funds obligated, it accepts and will comply with the applicable provisions. A Washington State Ou pa ment of Tra Rportation . sy _ ~ . By āœ“ Title rector of Highways and Local Programs uvli 1 O 2009 I Date Executed DOT Form 140-041 EF Revised 1/2007 Loq-1~I~ ~ AdML Washington State Transportation Buildin Department of Transportation 310 Maple Park Avenue S.E. Paula J. Hammond, P.E. P.O. Box 47300 Secretary of Transportation Olympia, WA 98504-730 360-705-7000 Copy TTY: 1 800-833-6388 www.wsdot.wa.go ~ Jwne 16, 2009 r- - Mr. Neil Kersten N; n Public Works Director City of Spokane Valley ~~J tJ1~ C=, Q 11707 East Sprague Ave., Suite 106 Spokane Valley, WA 99206-6124 ~ity of Spokane VaIiey Broadway Ave. Rehab - Phase 2 STPUL-3846(008) FUND AUTHORIZATION Dear Mr. en: We have received FHWA fund authorization, effective June 11, 2009, for this project as follows: PHASE TOTAL FEDERAL SHARE Construction $546,800 $472,982 Enclosed for your information and file is a fully executed copy of Supplement Number 1 to Local Agency Agreement LA-6776 between the state and your agency. All costs exceeding those shown on this agreement are the sole responsibility of your agency. All future correspondence relating to the project is to be submitted to your Region Local Programs- E:ig'ineer, Keith Martin at (509)3-24-{080: Sincerely, ( Stephanie Tax Manager, Program Management . Highways & Local Programs Division ST:jg:ac Enclosure ~ cc: Keith Martin, Eastern Region Local Progxams Engineer