McKinnon S 115 McCormack Bldg Dismantle/Reconstruct
~A~ N"O~1 S 115
1VCi
BY E1vGEA(EM1S ]REVIEW SIEEET
XYLAR#
CANCELED
AS Bl3WT FI,ANS ~
BIJDG pFItAM # B95166 .z
ReWed File # -0
Bwtftig Dept l~ (~'Sd092IO)
DM La R"new 1II03/1995 T'.tme ttav«► 7)q* Cammewnt-9
D4te .Received 11l03/.1995
Proje,ct' Name MCG4RMACK Bi.DG DISMASITELlRBCONSTRUCT BI.W SQ Fr
Rnge - Townslug - Searon
35231 I60.3
STIZ ADDIitLS5 ]yiCIMNN0N S 115 /N 3RD PARCEL
AppLcant's .N'ame JOAN MCCORMACK Phone # 456-7552
Address PQ BOR 341 Phcme 2#
sPOKANE wA 99210 FLOOD
ZONE Na
Bftg riiuone Owaer ROBEItT EVANSON Engmer
Address Addmss PO SO.Y 341 CompmY
SBOK;ANIE WA 992I0 Adc1res§
Siped Phone 456-7552 Phone/VAX ~
Phone
Btuldtao Cpntact Person Jeff Fony Ext 103 / JEFF FORRY Phone• # #56.,3M
bate Submgted ' I}esctig#On Wuels.
5d DATE MBS RBCLMED
DATE PRIO$tTY FEES RECEIVED COPX TO ACCOUNfI'IIVG I
NOTJCE TO PUBLIC 4, 13 4 b COMPLSTSD - OR NBBDS'r0 BE SIGATED ~
DESiGN DE'YLATI0N 3L13NIITTfiDIDATE COMPLETED -MAILED
DATE BOND RECENED - BOND AMOUNT RBCEIVED
DA1'E SOIVD REL.BASED - DATB AS BUQ.T RD PLANS
DATE RD PLAN3 APPROVED -NEW ROAD STANDARDS (MAY 15 1995)
STAMPBD M'YLARS TO PB,RYVIYI' TBCHNtCIAN (SYL/SUZA►NNE)
AP'PR4ACH PERMIT ff ROAD/5 VyIDHTIS
14e 1W
.
_J.e- OA4 ~ u ` t~ i~rs•... ~s
- - ~ c"
~ YZa-Qa~
~ ~
~
~-~~.~-z► ~c~'I-'
6
Page 1
OFFICE OF THE COUNTY ENGINBER
SPOKANE COUNTY, WASHINGTON
Pro3ect McCormack Bldg Date 17 Oct 96
Address 115 S McKinnon Ref No B95166
Parcel No 35231 1603 Review # 1
The County Engineering Department has completed a review of
the above referenced project The following information must be
provided in order for us to proceed with our review
1 The improved area of the lot scales out to be substantially
more than 25,200 square feet, soraewhere around 35,000 square
feet Revise the size of the swale accordingly
2 Provide calculations for the number and type of drywells
proposed A Type A drywell will handle 51000 square feet of
impervious area, wh11e a Type B drywell will handle 15,000
square feet of impervious area
3 Road plans for McKinnon Road, prepared by an engineer licensed
in the State of Washington, must be reviewed and approved
prior to release of the builcU.ng permit
Your contact person at the County Engineering Department is
Doug Busko, 456-3600
~
~
~ S
.
Q~5
~
~ 1
. w
Page 1
OFFTGE iC3F THE CC3[]Y3TY ENGINEER
SP4KANE COUI+TfY, WASHINGTOIY
Pro]ect NIcCormack Bldg Date 09-Nov-95
Ad.dress 115 S NlcKinnon Ref Na B95166
Parce1. Na 35231 1603 Revzew # Pre App
The County Engineering Department has cvmpleted a revlew at
the above refereaced pro3ect TYxe follawing inforrnation must be
provided in arder for us to praceed wxth our reva.ew
A) A drain.age plan fvr the site shall be pregared in
compliance with Spokane Cvunty "Guidelines for 5tormwater
Ma.nagentent" At am3-nimum. the plan must contain
I Drainage calculations far storrnwater volumes
generated on site
2 CalcUlations for total impervious surfaces
cantained with-ix~ the site
3 Finished qrade elevations fvr structures to be
constructed on sa.te
4 Copy of the pr4posed landscape glan
5 A typical cross section of the 208 swale
6 Galculations to justify the number and type of
dryweJ.ls proposed
7 Elevation af drywell inl.ets where applicable
8 Finxshed qrade elevations at the tap and bottom of
tlae 208 swa le
C) The folZowinq impravements w-ithin ad]acent Right of Way
are required prior to the telease af a building perrnit
1 Yau must submit road an.d drainage plans for street
impravement5 These must be prepared by an
engineer Plans must be prepared for the followinq
streets
a McKinnan. Industr,~alICommercial Access Stxeet
NOTE The appla.cant sha11 place curb alvng the entire
length of the parcel ad3acent to McKin,non to match existing A
strig af pavement cannecting the edge of existixxg }aavement to
cuzb line will also be requirect Road and drainage plans for
McC~ii!=n will need to be submitted P1ease refer to the Road &
Drainage Submittal Checkllst
All required constructzon (sidewalk/curbinqlpavement) within the
Pub~~c Road Rlght af Way is to be completed prior to the release
of abuilding permit or a financial guararnty in an amount
estimated by the County Engsneer to cover the cost of
construction or izapravements shall be f zled with the Calxnty
En.gineer Required plans are to be submtted prior to estim.ating
the amount af the financial guaranty or permit release
Page 2
2 Approach permits must be obtained, after a site
plan has been approved, and before the issuance of
a buildinq permzt, from the County Engineering
Department for any new or improved driveway
approaches to the following streets
a McKinnon
3 Please submit a copy of the recorded property deed
from the Audltors office for the sub3ect property Upon receipt
of the deed our staff will prepare the right of way deed and/or
RID/CRP agreement
D) Insufficient information was submitted with the proposal
We are unable to proceed with our review We will need
the following before we can proceed
1 Site Plan See Ms.nimum Requirements Checklist
2 Drainage plan as specified
3 Other information
a A parking and traffic circulation plan shall
be submitted and approved by the Spokane County Engineer The
ciesign, location and arrangement of parking stalls shall be in
accordance with standard traffic engineering practices Paving as
required by the County Planning Ordinance, will be required for
any portlon of the pro3ect which is to be occupied or traveled by
vehicles It is illegal to back out onto the Right of Way
E) Utility Condition Permittee is responsible for arranging
for all necessary utility ad3ustments or relocation as
required far completion of the improvement
F) The owner of the property or the authorized
representative must complete and sign Spokane County
Engineers "Agreement to Pay Fees" This document must be
returned to the County Engineers Office Plan review will
not be completed until this document is executed This
document is attached to these comments Please return
the completed Agreement to your contact person at the
Engineers Department
G) See comments on the attached check print Please return
the check print to your contact person at County
Engineering
The applicant or their representative is responsible for
including each item that is marked "Required By This Pro3ect" in
their submzttal in accordance with the checklist descriptions
Each item submi.tted that is to meet the checklist shall be
checked off by the applicant or their representative Submittals
which do not conform to the above requirements will be returned
for further items with no review being accomplished This will
~
~
Page 3
prolong the review proeess If changes accur in the requxrements
for the prol ect because of further conversatlons with Spokane
County regresentatives, please attach a note expla1ning the
agreed upan chan.ge in requirements When the applicants'
submittal is finally approved, the Engineers department will
release their portivn of the Buildiag Permit
Your cantact person at the County Engineering Department is
Katherine Mill.er, 456-3600
.
J ~ J 5
L 6k-- ?M
S P U K A N E C O U N T Y
OEFTCE OF TWE COUN7Y EKCINFER • A DNiStON oF'TfiE PuBWC WoRKS DEPAR7'MBM'
Ronald Cfformann I' E County Bngineer Dennus M. Scott P B Director
AGREENIENT TO PAY FEES
ENGINEER'3 AGREEAIENT NUMBER G 17 J / & &
This agreement between Spokane County aad Robert L Evanson ,
timme ot personi
whose interest in the project is ~
~~r agent etct
is entered mto tlus day of November , 19 95 This agreement ts applicabie to the project
known as 71IcKinnon
m . saamn nr fiename e im a That the indivrduals and parties named herein as having an interest m the above descn'bed prnperty or project
agree to Ehe foUowlag
1 Reimburse Spokane Couaty far project revrew and inspPxtion fee.s as specified in Chapter
9 14 of the Spokane County Code The fees will be based on actual salary costs incurred
by Spokane Counry for projeci cevlews and 1 or mspections plus a ten percent
admtajstrative charge, and will be billed monthly as accrued Any billiag amounts due,
mcluding any eupeases incurred m the collection of an overdue accouat, must be pmd
prior to the County's acceptance of the project for Rling If a project is approved and/or
fited with a balance shll owmg, the unpstd balance shail be paid within 30 days of the
invoice date
2 The undersigned agrees that these fees are due and Auyable upon receipt of the billing as
specifie,d abode
3 Any mvoices not paid wlthin 30 days of the mvoice date will be considered deitnquent
If any outstaadtng balance on the account for this project is not paid widun 30 days of
the invoice date, no further reviews of the project documenta w1U be conductal unttl the
entire account balance is paid Aay balance on the account for this project not paid
within 65 days of the mvoice date may result in legal action or the inlttation of other
collectioa procedures, tnctuding referral to a collection agency The Sponsor wil1 be
liable for any and afl expenses incurred by the County for the collection of overdue
accounts
4 The monthly billing should be sent to the attention of
NAME Western Construction & Design, Inc
ADDRESS PO Box 341
CITY, STATE Spoka ne , WA 99210
ZIP CODE
PHONB # (509) 456-7552
I understand that failure to pay these fees may resutt in delay in completion or approYal of the project or other
possible sanctions
Cl If this fee agteement ts completed by somecme other tban the Sponsor (i e, the project
owner or a princtpal in the firm sponsormg the proaect), such as the Englneer desigmng
the project, then written authonzaiio om the Sponsor specific.aUy authoriztag the
ched this Fee reemeat
Agent to execute this Fee 17/71F~V14
SIGNATURE B ~
Y
0&ee- ai- L ~ ~V 4AJ- D 0
(PRINT NAME)
IMN YEi.LOW COPY TO SPOK;ANE COUNTY ENGINEERS
k1plRagrremen fee 2/1 /9S ~
1026 W Broadway Ave. Spokane WA 99260 0170 (509) 456-3600 FAX (509) 324 3478 1 DI) (509) 324-3166
w
/
~
PERM T DOCUMEIVT TRANSM TTAL
Spokane County Division of Bwtdings
1026 W Broadway Ave
Spokane, WA 99260
ItS
Project Address Project aZ.k u
Business Name
CONTACT Ao tAN Phone 4~r,
Mailing Address
COORDINAT4R Phone
.
14t.~ ''t Q.e- OWP su~ o~~,~ d
DOCUIVIENTS CIRCULATED
~ .
Descflptian ~ UMUIM MAMA
~
Received 6y ~
. , ~
Date of Transmittal Circulated by RECEIVED ~
~
NOU p 3 9995
~
. :
~i SPOiU,lE COUNT1 ENGINEER '
- . - ~
14
S F O K A N E C c> U N T Y
DEPARTMFMOF BUiWMW jAMFS G MMWN G8 O„ DtRLCnpR
TO Revlewinq Agencies
FROM. Department of Buildings
'11per- 'fb2-tr-y (Review Coordxnator)
DATE: tQ3 a-~
The followxnq pro3 eat has been submitted for review
Address : 115 S iNkatLA(vn.a rv.
Contact: AO *oj McC-o¢.wtwrc.K Phone
Descr~~ts.on: -D •~ah.~►rv-c~~ u ~•.-~r ~v 4 ~ ~z~ ~.ac~t~ ,
~"Tb ~7^~ 01 ~e nIF S Olti3 ^R~iZ w~s t~~- ~ vMOV~c
~4.r~ tN 1~45 n►~
A Pre-Application Conference was not sc,heduled for this proposal.
Accordingly, please revx.ew the informatiion submitted for campl3ance
and forward your comments to our Department. Should you need
additional infortaation please feel free to contact the inclividual
coordiLnati.tig the review.
~ ~ N~
r
PROJECT NUMBER= 9500921( APPLICATION DAZ 11/03/95 PAGE= Ol
THIS I3 NOT A PERMIT
PENALTIES WILL BE AS3ESSED E'OR CONMENCING WORK RITHOUT A PERMIT
SITE STREET= 13r2s3 S MCKINNON RD PARCEL#= 35231 1603
ADDRESS= SPOKANE WA 99212
PERMIT USE= DISMANTEL AND RECONSTRIICT RETAIL BUILDING
PLAT#= 000751 PLAT NAME= EVERGREEN COMMERCIAL PARK
BLOCKa LOT= ZONE= I-2 DIST#= D
AREA= 00048000 F/A= F WIDTHa 240 DEPTH= 200 R/Wa
# OF BLDGS= 1 # DAELLINGS= WATER DIST a
OWNER= EVANSON, ROBERT PHONEa 509 244 3000
~ STREET= PO HOX 341
K ADDRES3= SPOKANE WA 99210
r
CONTACT NAME= JOHN MCCORMACK PHONE NUMBER= 509 456 7552
BUILDING SETBACKS FRONT= 52 LEFT= 30 RIGHT= UNK REAR= UNK
~ gEVIEW INFaRMATION *~~******~*****a~*~******~****
N
~ DEPARTMENT REVIEW REQUIREMENT
--------------r------------
BUILDING REVIEW COORDINATOR - J FORRY ,
COAIlMENT S BUILDING PLAN REVIEW REQUIRED .
CONoENTS ~
BIIILDING ZONING/SITE REVIEW ,
COMMENTS
i
, ENGiNEER APPROACH/EZOOn PLAiN/DRAINAGE ,
COMMENTS
ENGINEER SITE DR.AINAGE TO BE REVIEWED ,
COMMENTS
HEALTHDIST NEW OR ADDITIONAL WASTE WATER ,
.
COM1IENTS
I drR We'awww-AL - IA ( i1 rw►I
~ -I ~ t 0 ~
► ' of f 4 , ~
. r 134040 e
1 AN ~ i rT ~
( ~ s ~ r
^ , ~ ~ ~
B ~ ~ o 0-c
FIRST
_ - - -
33-55
6 "L
9 I 0
cv, r-q
tsAr
~
7,. ,
!8 !9 II ~ ~ t,iL~ ~ -
3
s 1
4 13531 ioo,
$r. Or 3
I
450,"
,
OP -N;.~
~ 24 a $o
6
1-2 3 - 6 ~ 120 -
~ c
I UQ ~ . •
. 22 62
-69 I 14 ~ ~
i ~I• ~ I ~
■ ~ ~ '
< • ~s ~ i
71
,
~
T
T O 791-70
~ ~ Ji f I ~ ~Z ~ I -
~,1~ il• - -
71I 1! ~/w I/ I ~ - _1 ~ 1 ~1
MA
~ ~ •~~~5 ~ r • ~ ~ ~ ~ ~ ~ ~ ~
; ~f11 'i' ~.i~ i ~~i '1 s.~ ~ - t_ ~
~ ~ ~ ' 1 ~v f
S
a I r ~
_ ~ ~'~DZt~T~f/ f rH _.rv~wi _ - - ~ ♦ ~ ~ ~ ~
, ~ , fi. ► ~l/E ~ IVR=3
si I; ~t ! ~►1. . ~1
~ ~ ~ ~