Loading...
2013, 05-01 Permit: SW-13000578 Sewer SPOKANE COUNTY BUILDING AND PLANNING PERMIT APPLICATION Penalties will be assessed for commencing work without a permit. Application Number: SW-13000578 Application Date: 05/01/2013 Project Description: REPAIR Project Name: HILLVIEW EST Primary Contact: H&S CONSTRUCTION Applicant: H&S CONSTRUCTION Phone: 509-926-8964 Address: 11817 E VALLEYWAY SPOKANE VALLEY,WA 99206 Phone: 509-926-8964 Email: SITE INFORMATION: Site Address: 12704 E 31ST AVE Owner: HALPIN, KEVIN&SANDRA Parcel Number: 45273.1914 Address: 1617 STONEHENGE WAY PETALUMA, CA 94954 Phone: Assessor's Description: HILL VIEW EST E57.71'OF LT 4&W39.43'OF LT Email: 5 BLK 18 Inspection Area: : (509)-477-3675 Water District: Spokane County Water Fire District: Spokane Valley Fire District#3 Zoning: Land Area: 12143 Square Feet CONTRACTOR INFORMATION: HSCON**123KF, Exp.05/08/2013 H&S CONSTRUCTION 11817 E VALLEYWAY SPOKANE VALLEY,WA 99206 i 509-926-8964 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER REPAIR 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing-Utilities $26.32 Utilities Permit $125.00 Total Fee: $151.32 REVIEW STEPS REQUIRED: Utilities Sewer 05/01/2013 Chris Knudson COMPLETE CONDITIONS: Inside Public Transit Benefit Area Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Date Printed:05/01/2013 13:00:17 Project Coordinator:Julie Shatto SPOKANE COUNTY BUILDING AND PLANNING PERMIT APPLICATION Penalties will be assessed for commencing work without a permit. Application Number: SW-13000578 Application Date: 05/01/2013 CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE.SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR& INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. _ SEWER PERMITS ARE VALID FOR ONE(1)YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. _ INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. _ SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. _ THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. SIGNATURE AND DISCLAIMER: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of law and/or regulations governing this type of work will be complied with.Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Date Printed:05/01/2013 13:00:17 Project Coordinator:Julie Shatto