Loading...
SP-1018-95 li RECE VED ~ ~ s P O K A N E _s, . C O u 1998 BUILDING AND PLANNING • A DMSION OF THE PUBLIC WORRWNfi%WyENGINEER JAmF_s L. MANsotv, C.B.O., DIRECTOR DEtvrtts M. SCOTT, P.E., DIRECTOR MEIVIORANAUM TO: Division of Engineering and Roads - Transportation Engineering; Pat Harper, c/o Sandy Kimball Division of Engineering and Roads- Development Services; Bill Hemmings Division of Utilities - Information Management; Jim Red Spokane Regional Health District, Steve Holderby Spokane County Fire District No. i Central Valley School District No. 356 Model Irrigation District No. 18 Spokane Regional Transportation Council, Glen Miles - FROM: J. Todd, PlannerC>< DATE: August 19, 1998 RE: Short Plat SP-1018-95 The above-referenced short plat has expired and*is now cor.sidered null and void. Please adjust your records accordingly to reflect this change. If you have any questions regarding this matter, you may contact me at 477-3675. wc c: William J. Purvis, 12810 E. Palouse, Valleyford, WA 99036 Wyatt Engineering, Surveyor 1026 WES? BROADWAY AVENUE • S['OMNE, WAsHiNc:TON 99260 PHONE: (509) 456-3675 • F~x: (509) 456-4703 TDD: (509) 324-3166 ENGINEER' S REVIEW SHEET BLDG. PERMIT # -or -FILE SP-1018 _95 Related File # ( ) Date to Review 04-19-95 Time # Date to AA & DR Time Date Received 04-05-95 Project Name DUPLEXES No. Lots 4 No. Acres 2.4 Range - Township - Section SITE ADDRESS S 12TH/W PIERCE/E UNTVESITY PARCEL # 45213.9064 Applicant's Name DAVID BUCKNER Phone # 360)791-7801 Address 13824 JORDAN RD Work # Dates Conditions mailed Contract person Phone # FLOOD ZONE , No W 4 Si School 35L Engineer / Surveyor's / Architect's Name SARA MARKS WYATT JAYKIM ENGINEERS 1801 W BROADWAY #110 SPOKANE WA 99201 328-5139 Planning Contract Person Phone # 456-2205 Date Submitted . Description Initials AGREEMENT TO PAY FEES OR PRIORITY FEE COMPLETED & COPY TO ACCOUNTING FINAL PLAT FEES COMPLETED & COPY TO ACCOUNTING NOTICE TO PUBLIC # 1 3 4 6 COMPLETED - OR NEEDS TO BE SIGNED DESIGN DEVIATION SUBMITTED ALTERATION TO PLAT - BLOCKS -LOTS BOND RELEASED - ROAD & DRAINAGE IMPROVEMENTS MEARING EXAM APPROVED DENIED- APPEALED BBC / PROJECT APPROVED DENIED BOND QUANTITIES FOR DRAINAGE ITEM CALCULATED STAMPED MYLARS TO PERMIT TECHNICAN (SYL/SUZANNE) / / STAMPED 208 LOT PLANS TO ADMINISTRATIVE ASSISTANT (SANDY) i . . , , . . , , . i , BEFORE SPOKA.NE COUNTY PLANNING RECEtlIED IN THE MATTE - OOI FINDINGS OF FACT, ~~Y 1995 SHORT PLAT O.S~ - 018-95 ) CONCLUSIONS AND - DE CIS IO N ~ Engineeri0.~ THIS MATTER, an application for subdivision of land, from David Buckner has been received and decided upon, pursuant to Spokane County Subdivision regulations, on the day of May, 1995. FINDINGS OF FACT AND CONCLUSIONS 1. The individual signing below has further been properly delegated the responsibility for rendering the decision by the Spokane County Director of Planning. 2. The proposal is to divide approximately 2.4 acres into 41ots for residential lots and those uses permitted in the Urban Residenrial - 3.5 (UR-3.5) zone. 3. The proposal is located south of and adjacent to 12th Avenue, approximately 500 feet east of Pierce Road in the SW 1/4 of Section 21, Township 25 North, Range 44 E.W.M. Spokane County, Washington. 4. 'Z'he exisring zoning of the property described in the application is Urban Residential - 3.5 (UR-3.5), previously establi.shed as Agricultural zoning in 1950 (File No. 181-50) and redesignated to UR-3.5 on January 1, 1991, pursuant to the Program to Implement the Spokane County Zoning Code. Pursuant to RCW 58.17.195 the proposal does confornz to the requirements of the existing zone. 5. The Spokane County Comprehensive Plan designates this area as Urban. The development and uses, as proposed and conditioned are in compliance with this • category. 6. Surrounding uses are primarily residential on parcels similar to or larger than the proposed short plat. 7. The required public notice was provided for this proposal and agencies having a potential interest in the project were notified and recom.mendations Solicited. 8. No written comments were received from any adjoining property owners. 9. The Spokane County Arterial Road Plan identifies 12th Avenue as a Local Access with a future right of way width of 60 feet. The existing right of way width is 40 feet. In order to implement the Arterial Road Plan, the County Engineer has requested 10 feet of dedication for the purpose of additional right of way and 8- 10 feet of asphalt in width along the frontage on the development. Therefore, as conditioned., the proposal conforms to the Plan. 10. The site is located within the Public Tra.risportation Benefit Area (PTBA). 11. The proposed short plat will be served by a public water system. Waste water disposal will be as authorized by the Director of Utilities. 12. The Spokane County Parks Department has commented on the proposed short plat. The Parks Departnzent has requested a voluntary agreement be completed between the Parks Department and the property owner to mitigate i.mpacts to the Counry Park system. County legal counsel has i.ndicated such agreements may be required. Spokane County Planning recoraamends the properry owner negotiate with the Spokane County Parks Deparanent to provide for appropriate capital faciliries as required by the Revised Code of Washington (RCW) 58.17.110. Approval of this short plat should include conditions requiring that provisions for appropriate faciliries be i.n place prior to recording this final plat in the form of a written agreement between the owner and the ` Spokane County Parks Department 13. The Central Valley School District has commented on the proposed Short Plat. The , District has indicated that existing school facilities are inadequate to serve the proposed short plat and wishes to negotiate with the owner to provide adequate capital facilities as required by the Revised Code of Washington (RCW) 58.17.110. Review by County legal counsel indicates the condition requested by the School District can be required for 1 ~ ~ ~ • _ r t , developments. Approval of this short plat should include conditions requiring that provisions for appropriate facilities be in place prior to recording the final short plat in the form of a written agreement between the owner and the school district. 14. The proposed shoxt plat has direct access to public right of way at 12th Avenue. Sidewalks and curbing are required by the County Engineer along 12th Avenue regarding this proposal and have been conditioned as part of the future formarion of a Road Improvement District (RID) project. 15. Recognizing the recommended conditions and Spokane County development standards, appropriate provisions should be made to ensure the public health, safety and general welfare and that the public use and interest will be served by platting the subdivision. The subdivision proposal is generally consistent with RCW 58.17 and the County subdivision regulations, promoting the public health, safety and general welfare in accordance with sandards established by the state and Spokane County. Spokane County Planning has considered the provision of adequate public facilities as cited in RCW 58.17.110 (2). .1Vlore specifically: a. open spaces b. drain age ways c. public and/or private rights-of-way d . rransit e . potable water f. sanitary waste disposal g. parks and recrearion facilities h . playgrounds i. schools and schoolgrounds j . sidewallcs , 16. The project is exempt from environmental review under the State Environmental Policy Act pursuant to WAC 1.97-11-800 (6) (a). DECISION Based upon the above noted Findings of Fact and Conclusions, Short Plat Application SP-1015-95 is hereby APPROVED until June 1,1998, subject to conditions noted below. Most of the condi.tions of approval shall be accomplished by the applicant and/or sponsor prior to finalization of the short subdivision. This decision is final unless appealed in writing, consistent with adopted appeal procedures. COUNTX PLANNING DEPARTMENT CONDITIONS 1. All conditions imposed by Planlung shall be binding on the "Applicant", which term shall include the owner oz owners of the property, heirs, assigns and successors. 2. The proposal shall comply with the Urban Residential - 3.5 zone as amended. 3. The final plat shall be designed substantially in conformance with the prelurunary plat of record. No increase of density or number of lots shall occur without a change of condition application submittal and approval. 4. The Planning Director/designee shall review any proposed final plat to ensure compliance with these Findings and Conditions of Approval. 5. The prelinunary plat is given conditional approval for thzee (3) years, specifcally to June 1, 1998. The applicant may request an extension of time by submitring a written request approximdtely forty-five (45) days prior to the above expiration ciate. . 6. Three (3) current certificates of title shall be furnished to Planning prior to filing the final plat. FrNDYNGS AN.D DECISION SP-1018-95 Page 2 , ' . , 7. Appropriate utility easements shall be indicated on copies of the proposed final plat. Written approval of urility easements by appropriate utiliry companies shall be received with the submittal of the final plat. 8. Prior to filing of final plat, the appropriate road name(s) and street ad.dress(es) shall be indicated. 9. The final plat map shall indicate by a clear, dashed line the required yard setbacks from all private, "Tract X" or public roads. The dedication shall contai.n the following statement: "Side yard and rear yard setbacks shall be determined at the time building permits are requested unless these setbacks are specifically drafted on this final plat. The setbacks indicated on this plat may be varied from if proper zoning approvals are obtained." 10. A plan for water facilities adequate for domestic service and fire protection shall be approved by the water purveyor, appropriate fire protection district, County Division of Buildings and County Health District. The agencies wi.ll certify on the Water Plan, prior to the filing of a final plat, that the plan is in conformance with their respective needs and regulations. The Water Plan and certi.fication shall be drafted on a transparency suitable for reproduction and be signed by the plat sponsor. 11. . The water purveyor shall certify that appropriate contractual arrangements and schedule of improvements have been made with the plat sponsor for construction of the water system in accordance with the approved Water Plan. The time schedule shall provide for completion of the water system and inspection by the appropriate health authorities prior to application for building penmits withi.n the final plat. The arrangements or agreements shall include a provision holding Spokane Counry and the purveyor harrnless from claims by any lot purchaser refused a building permit due to the fai.lure of the subdivision sponsor to satisfactorily complete the approved water system. 12. The final plat dedication shall contain the following statement: "The public water system, pursuant to the Water Plan approved by county and state health authoriaes, the local fire protection district, water purveyor and Spokane County Division of Buildings, shall be installed within this subd.ivision, and the applicant shall provide for individual domestic water service as well as fire protection to each lot prior to sale of each lot and prior to issuance of a building permit for each lot" 13. No building pemzit will be issued for any lot within the final plat until certified by a Washington state-licensed engineer that "the water system has been installed pursuant to the approved Water Plan for the final plat" including a signed license stamp. The certification may be in the form of a letter, but is preferred to be certified on a copy of the Water Plan as a schematic map showing the "as-constructed" water system. 14. The Water Plan and the above four (4) conditions of approval regarding the Water Plan may be waived by the Planning Director/designee upon receipt of letters from the appropriate water purveyor and fire protection district stating that simple conriections to an existing, approved water system will provide adequate domestic and fire protection water to ensure the public health, safety and general welfare. 15. No water plan is required, and a simple tap is needed at the time of building permit , release. 16. The owner shall negotiate with Central Valley School District and submit a recorded copy of a voluntary agreement making provisions for public schools ,prior to finalization and recording of the plat. The agreement shall provide a written description _ of the subject property to which the agreement applies and also state the dollar amount and any other agreed to mitigating measures. The owner shall also notify any potential purchasers who have made an agreement to purchase property within said plat pursuant to the Revised Code of Washington (RCW) 58.17.205, that adequate provisions for school facilities must be made cond.itioned on a future agreement between the plattor and school district. Voluntary agreements between the owner and school district shall conform to the requirements of RCW Chapter 82.02. FllVD1NGS AND DECISI4N SP-1018-95 Page 3 • ~ - 17. A survey is requ.ired prior to the filing of a final plat. COtTNTY DIVISION OF ENGINEERING AND ROADS CONDITIONS 1. That condirional approval of the plat by the County Engineer is given subject to dedication of Right-of-Way and approval of the road system as indicated in the preliminary plat of record. 2. That plans, profiles and cross sections as designed to County standards showing proposed street centerline and curb grades be submitted to the County Engineer for approval prior to construction and/or the filing of a final plat; road plans to be prepared under the direcp.on of a licensed Professional Civil Engineer. 3. That drainage plans and design calculations showing the alignment of drainage facilities be submitted to the County Engineer for approval prior to construction and/or " the filing of the final plat. Drainage plans to be prepared under the direction of a licensed Professional Civil Engineer. 4.' No construction work is to be perfonned within the existing or proposed Public Right- of-Way until a permit has been issued by the County Engineer. All work is subject to inspection and approval by the County Engineer. 5. The applicant should be advised that individual driveway access permits are required prior to issuance of a bu.ild.ing pernait for driveway approaches to the County road system. 6. Dedicarion of 10 feet of additional Right-of-Way along 12th Avenue. 7. Existing County roads providing direct access to the plat shall be paved andJor curbed to Spokane County standards. 8. The word "applicant" shall include the owner(s) of the property, his/her heirs, assigns and successors. 9. To construct the road improvements stated herein, the applicant may, with the approval of the County Engineer, join in and be a willing participant in any petition or resolution which purposes is the formation of a Road Improvement District (RrD) for said i.rnprovements pursuant to RCW 36.88, as amended. At such time as an RID is created or any Road Improvement Project is sanctioned by Spokane County, the improvements required (curb, sidewalk, drainage control and paving to existing pavement) will be at the sole expense of the undersigned owner, their heirs, grantees and assigns. This provision is applicable to 12th Avenue. 10. As an alternative method of constructing the road improvement stated herein, the applicant may, with the approval of the County Engineer, accornplish the road improvements stated herein by joining and participating in a County Road Project (CRP) to the extent of the required road improvement. At such time as an RID is created or any Road Improvement Project is sanctioned by Spokane County, the improvements required (curb, sidewalk, drainage control and paving to existing pavement) will be at the sole expense of the undersigned owner, their heirs, grantees and assigns. This provision is applicable to ] 2th Avenue. 11. That the following statement shall appear within the ded.icatory language of the final . plat: _ The owner(s) or successor(s) in interest agree to authorize Spokane County to place theu name(s) on a petition for the formation of a Road Improvement District (RID) by the petition method pu.rsuant to Chapter 36.88 RCW, which petition includes the owner(s) property, and further not to object, by the signing of a ballot, the formation of a RID by the resolution method pursuant to Chapter 36.88 RCW, which resolution includes the owner(s) property. If a RID is formed by either the petition or resolution method, as provided for in Chapter 36.88 RCW, the owner(s) or successor(s) further agree: (1) that the improvements or construction contemplated within the proposed RID is feasible, (2) That the benefits to be derived from the formation of the RID by the property included therein, together with. the amount of any Counry participation, exceeds the cost and expense of formation of the RID, and (3) that the property within the proposed RID is sufficiently developed. Provided, further, the owner(s) or FINDrNGS AND DECISION 5P-1018-95 Page 4 w ♦ • successor(s) sha11 retain the right, as authorized under RCW 36.88.090, to object to any assessment(s) on the property as a result of the improvements called for in conjunction with the formation of a RID by either petirion or resolution method under Chapter 36.88 RCW, and to appeal to the Superior Court the decision of the Board of . County Commissioners affuming the final assessment roll. It is further agreed that at such ame as an RID is created or any Road Improvement project is sanctioned by Spokane County, the improvements required (curb, sidewalk, drainage control and paving) wi.ll be at the sole expense of the undersigned owner, their heirs, grantees and assigns without participation by Spokane County. The RID waiver contained in this agreement shall expire after ten (10) years from the date of execution below. However, the owner(s) or successor(s) agree that if said RID waiver expizes without construction of the required improvements, the owner(s) or successor(s) agree to construct the required improvements at their own expense; pay to Spokane County the then estimated cost of the required unprovements to enable the County to.complete the same; or furnish a bond or other secure method suitable to the County (which may include the execution of another RID wa.iver agreement), . providing for or securing to the County the actual construction of the unprovements. All of the requirements of this agreement shal.l run with the land and shall be binding upon the owner(s), their successor(s) or assign(s). This provision is applicable to 12th Avenue. 12. The County Engi.neer has designated Typical Roadway Section Number 2 Local Access Standard for the improvement of 12th Avenue which is adjacent to the proposed development. This will require the addition of approximately 8- 10 feet of aspha.lt along the frontage of the development. The construction of curbing is also required. 13. The proposed private road(s) as shown on the preliminary plat serving 4 lots is not approved by the County Engineer. 14. That private road(s) be unproved to Spokane County standard for an Urban private road standard serving 41ots. 15. All vested owners shall sign and record private road documents as prescribed by the Spokane County Engineer. These documents shall be reviewed and approved by the Spokane County Engineer prior to recording with the Spokane County Auditor. Recording numbers shall be referenced i.n the dedicatory language of the plat. 16. That the following statement be placed in the plat dedication: WAIZNLNG: Spokane County has no responsibility to build, improve, maintain or other wise sezvice the private roads contained within or providing service to the property described in this . plat. By accepting this plat or subsequently by allowing a building permit to be issued on property on a private road, Spokane County assumes no obligation for said private road and the owners hereby acknowledge that the County has no obligarion of any kind or nature whatsoever to establish, exannine, survey, construct, alter, repair, improve, maintain, provide drainage or snow removal on a private road. This requirement is and shall run with the land and shall be binding upon the owner, their heirs, successors or assigns including the obligation to participate in the maintenance of the private road as provided herein. 17. The proposed subdivision shall be i_m.proved to the standards set forth in Spokane County Board of Commissioners Resolution No. 95-0498, as amended, which resolution establishes regulations for roads, approaches, drainage and fees in new construction. 18. The Counry Engineer has examined this development proposal and has detemvuled that the impact of this proposal upon the existing County Road System warrants the dedication of addirional Right of Way and the roadway improvements herein specified. 19. That the following statement must be placed in the plat dedication: "The private road as shown hereon is an easement which provides a means of ingress and egress for those lots within the plat having frontage thereon." 20. The applicant should be advised that there may exist utilities either underground or overhead affecting the applicants property, including property to be dedicated or set aside for future acquisition. Spokane County will assume no financial obligation for FINDINGS AND DECIS.ION SP-1018-95 Page 5 - adjustments or relocation regarding these utilities. The applicant should check with the applicable utilities and Spokane County Engineer to determine whether the applicant or utility is responsible for adjustment or relocation costs and to make arrangements for any necessary work. . 21. The applicant shall provide documentation to the satisfaction of the County Engineer that the local fire district will approve the proposed turn around as shown on the preliminary plat. The County Engineer shall also review and approve the proposed turn around. COUNTX HEALTH DISTRICT CONDITIONS , 1. The final plat shall be designed as indicated on the preliminary plat of record and/or any attached sheets as noted. 2. Appropriate utility easements shall be indicated on copies of the preliminary plat of record for distribution by Planning to the utility companies, Spokane County Engineer and the Spokane County Health District. Written approval of the easements by the utility companies must be received prior to the submittal of the final piat. 3. Sewage disposal method shall be as authorized by the Director of Utilities, Spokane County. 4. Water service shall be coordinated through the Director of Utilities, Spokane County. 5. Water service shall be by an existing public water supply when approved by the Regional Engineer (Spokane), State Department of Health. 6. Prior to filing the fina] plat, the sponsor shall demonsCrate to the satisfaction of the Spokane County Health District that an adequate and potable water supply is available to each tract of the plat. 7. Prior to faling the final plat, the sponsoz shall present evidence that the plat lies within the recorded service area of the water system proposed to serve the plat. 8. A plan for water facilities adequate for domestic use, domestic irrigation use and fire protection use shall be approved by the water purveyor. Said water plan must have been approved by the fire protection district and the appropriate health authorities. The health authorities, water supplier (purveyor) and the fire protection district will certify, prior to the filing of the final plat, on the face of said water plan that the plan is in conformance with their requirements and will adequately satisfy their respective needs. Said water plan and certification will be drafted on a transparency suitable for reproduction. 9. The purveyor will also certify prior to filing the final plat on a copy of said water plan that appropriate contractual arrangements have been made with the plat sponsor for construction of the water system, in accordance with the approved plan and time schedule. The time schedule will provide, in any case, for completion of the water system and inspection by the appropriate health authorities prior to application for building permits within the plat. The contractual arrangements will include a provi'sion holding Spokane County, Spokane County Health District and the purveyor harmless from claims by any tract purchaser refused a building permit due to failure of the plat sponsor to satisfactorily complete the approved water system. 10. Prior to filing the final plat, the sponsor shall demonstrate to the satisfaction of the Spokane County Health District that suitable sites for on-site sewage di.sposal systems are available on all lots within the short plat. 11. Subject to specific application approval and issuance of permits by the Health Officer, the use of individual on-site sewage disposal systems may be authorized. 12. The dedicatory language of the plat will state: "Subject to specific application approval and issuance of pemuts by the Health Officer, the use of individual on-site sewage systems may be authorized." 13. The dedicatory ]anguage on the plat shall state: "Use of private wells and water systems is prohibited." FII~TDYNGS AND DECISION SP-1018-95 Page 6 ` ` • - 14. The plat dedication shall contain a statement to the effect that: "The public water system, pursuant to the Water Plan approved by county and state health authoriries, the local fire protection district, water purveyor and County Division of Buildings, shall be installed within this plat, and the applicant shall provide for individual domestic water service as well as fire protection to each lot prior to sale of each lot and prior to issuance of a build.ing permit for each lot." COUNTY DIVISION OF UTILITIES CONDITIONS. 1. Pursuant to the Board of County Commissioners Resolution No. 80-0418, the use of on-site sewer disposal systems is hereby authorized. This authorization is condirioned in compliance with all rules and regulations of the Spokane County Health District and is further conditioned and subject to specific application approval and issuance of pennits by the Health District. 2. The Dedication shall state: The owner(s) or successor(s) in interest agree to authorize the County to place their name(s) on a petition for the fonnation of ULID by pee.tion method pursuant to RCW 36.94, which petition includes the owner(s)' property; and further not to object by the signing of a protest petition against the formation of a ULID by resolution method pursuant to RCW Chapter 36.94 which includes the owner(s)' property. PROVIDED, this condition shall not prohibit the owner(s) or successor(s) from objecring to any assessment(s) on the property as a result of improvements called for in conjunction with the formation of a ULID by either perition or resolution undez RCW Chapter 36.94. 3. Each dwelling unit shal,l be double-plumbed for corulection to future areawide collection systems. 4. Sewer easement shall be shown on the face of the plat as "Sewer and Utilities Easement". 5. A dry sewer connection to the future areawide Sewerage System is to be constructed. 6. Public Sanitary Sewer easement shall be shown on the face of the plat and the ' dedication shall sta.te: "The perpetual .(exclusive) easement granted to Spokane County, its' successors and assigns is for the sole purpose of construcCing, installing, operating, maintaining, repairing, altering, replacing, removing, and all other uses or purposes which are or may be related to a sewer system. Spokane County, its' successors and assigns at all times hereinafter, at their own cost and expense, may remove all crops, brush, grass or trees that may interfere with the constructing, installing, operating, maintaining, repairulg, altering, replacing, removing and all other uses or purposes which are/may be related to a sewer system. The grantor(s) reserves the right to use and enjoy that property which is the subject of this easement for purposes which will not interfere with the County's full enjoyment of the rights hereby granted; provided, the Grantor(s) shall not erect or construct any building or other structure or drill on the easement, or diminish or substantially add to the ground cover over the easement. The easement described hereinabove is to and shall run with the land." 7. Applicant shall submit expressly to Spokane County Utilities Department "under separate cover", only those plan sheets showing sewer plans and specifications for: Public Sewer/Double Plumbing/Private Sewer or Dry Sewer connections for review and approval by the Utilities Department prior to issuance of permit to connect. 8. Security shall be deposited with the Utilities Department for construction of public facilities/double plumbing/private connection/dryline. 9. Any water service for this project shall be provided in accordance with the Coordinated Water System Plan for Spokane County, as amended. FrNDINGS AND DECISION SP-1018-95 Page 7 . ~ - . . . . PARKS DEPARTMENT CONDITIONS 1. To satisfy the requirements of RCW-58-17-110 that a subdivision make appropriate provisions for public parks, recreation and playgrounds, the owner, at his/her option, shall either ded.icate land within the subdivision or enter into a voluntary agreement with Spokane County to mitigate the direct impacts that the subdivi.sion has on public parks, open spaces and recrearional facilities within the unincorporated areas of Spokane County. If the owner opts to enter into a voluntary agreement, the agreement shall be executeti prior to the finalization and recording of the plat and recorded in conjunction therewith. the agreement shall be consistent with RCW 82.02.020 an substantially the same as the standardized agreement prepared by the Spokane County Parks, Recreation and Fair Department. Prior to finalization of the plat, the owner shall advise any purchaser of property, as authorized under RCW 58.17.205, of the obligarions within the voluntary agreement. Additionally, the owner shall submit a recorded copy of sa.id voluntary agreement to Spokane County Planning prior to finalization. COUNTY DIVISION OF BUILDINGS CONDITIONS 1. The applicant shall contact the Division of Buildings at the earliest possible stage in order to be informed of code requirements administered/enforced as authorized by the State Building Code Act. Design/development concerns include: ADDRESSING, FIRE A.PPARA.TUS ACCESS ROADS; FiRE HYDRANT/FLOW; APPROVED WATER SYSTEMS; BUII.DING ACCESSIBILITY; CONSTRUCTION TYPE; OCCUPANCY Q,ASSIFICATION; EXIT'ING; EXTERIOR WALL PROTECTION; AND ENERGY CODE REGULATTONS. (Note: The Division of Buildings reserves the right to confirm the actual address at the time of building permit.) C~-//-1 APProved the daY of MaY, 1995. J hn Nunn~ry enior Plan.ner , For: Doug R. Smith, Planner I , Under State Law and County Orclinance, you have the right to appeal this decision to the Spokane County Hearing Examiner Committee. If you desire to file an appeal, you must submit the appropriate Appeal Application together with the required Fee, payable to Spokane County Planning, within ten (10) calendar days from the date this decision is signed. Upon receipt of a complete appeal application, a public hearing will be scheduled. If you have any questions, please call Spokane County Planning at 456-2205. pc: County Division of Engineering and Roads County Division of Utilities County Health District County Division of Buildings County Division of Parks, Recreation and Fair Central Valley School District Fire District 1 Model Irrigation Dist. ~David Buckner, 13824 Jordan Rd, Arlington WA 98223 Sara Marks, 1801 W. Broadway, Ste 110, Spokane WA 99201 FINDINGS AND DECISION SP-1018-95 Page 8 r - OFFICE OF THE SPOKANE COUNTY ENGINEER 1026 W Broadway Ave, Spokane, WA 99260-0170 (509)456-3600 Fax 324-3478 -SHORTPLAT CONDITIONS- ' ' TO: Spokane County Planning Department, John Nunnery FROM: Division'of Engineering & Roads, Scott Engelhard 5e, DATE: April 25, 1995 SUBJECT: SHORT PLAT # 1018-95 / BUCKNER, DAVID The following "Conditions of Approval" for the above referenced subdivision are submitted to the Spokane County Planning Department for inclusion in the "Findings and Order" should the short plat be approved. E 1 That conditional approval of the plat by the County Engineer is given subject to dedication of Right-of-Way and approval of the road system as indicated in the preliminary plat of record. ' E 2 That plans, profiles and cross sections as designed to County standards showing proposed street centerline and curb grades be submitted to the County Engineer for approval prior to construction and/or the filing of a final plat; road plans to be prepared under the direction of a licensed Professional Civil Engineer. E 3 That drainage plans and design calculations showing the alignment of , drainage facilities be submitted to the County Engineer for approval prior to construction and/or the filing of the final plat. Drainage plans to be prepared under the direction of a licensed Professional Civil Engineer. E 6 No construction work is to be performed within the existing or proposed Public Right'-of-Way until a permit has been issued by the County Engineer. All work is subject to inspection and approval py the County Engineer. E12 The applicant should be advised that individual driveway access permits are required prior to issuance of a building permit for driveway approaches to the County road system. E13 Dedication of 10 feet of additional Right-of-Way along 12th Avenue. E16 Existing County roads providing direct access to the plat'shall be paved and/or curbed to Spokane County standards. E19 The word "applicant" shall include the owner(s) of the property, his/her heirs, assigns and successors. E20 To construct the road improvements stated herein, the applicant may, with the approval of the County Engineer, join in and be a willing participant 'in any petition or resolution whicr purposes is the formation of a Road Improvement District (RID) for said improvements pursuant to kCW 36.88, as amended. At such time as an RID is created or any Road Improvement Project is sanctioned by Spokane County, the improvements required (curb, sidewalk, drainage control and paving to existing pavement) will be at the sole expense of the undersianed owner, their heirs, grantees and assigns. This provision is applicable to 12th Avenue. E21 As an alternative method of constructing the road improvement stated herein, the applicant may, with the approval of the County Engineer, accomplish- the road improvements stated herein by joining and participating in a County Road Project (CRP) to the extent of the required road improvement. At such time as an RID is created or any Road Improvement Project is sanctioned by Spokane -County, the improvements required (curb, sidewalk, drainage control and paving to existing pavement) will be at the sole expense of the undersigned owner, their heirs, grantees and assigns. This provision is applicable to 12th Avenue. E22 That the following statement shall appear within the dedicatory language of the f inal plat : ~ . SHORT PLAT # 1018--95 / BUCKNER, DAVID 2 The owner(s) or successor(s) in interest agree to authorize Spokane County to place their name(s) on a petition for the formation of a Road Improvement District (RID) by the petition method pursuant to Chapter 36.88 RCW, which petition includes the owner(s) property, and further not to object, by the signing of a ballot, the formation of a RID by the resolution method pursuant to Chapter 36.88 RCW, which resolution includes the owner (s) property. If a RID is formed by either the petition or resolution method, as provided for in Chapter 3 6. 8 8 RCW, the owner ( s) or successor ( s) f urther agree :1 (1) that the improvements or construction contemplated within the proposed RID is feasible, (2) That the benefits to be derived from the fortilation of the RID by the property included therein, together with the amount of any County participation, exceeds the cost and expense of formation - of the RID, and (3) that the property within the proposed RID is sufficiently developed. Provided, further, - the owner(s) or successor(s) shall retain the right, as authorized under RCW 36.88.090, to object to any assessment(s) on the property as a result of the improvements called for in conjunction with the formation of a RID by either petition or resolution method under Chapter 36.88 RC'fnT, and to appeal to the Superior Court the decision of the Board of County Commissioners affirming the final assessment roll. It is further agreed that at such time as an RID is created or any Road Improvement project is sanctioned by Spokane County, the irrtprovements required (curb, sidewalk, drainage control and paving) will be at the sole expense of the undersigned owner, their heirs, grantees and assigns without participation by Spokane County. , . The RID waiver contained in this agreement shall expire after ten (10) years, f rom the date of execution below. However, the owner ( s) or successor(s) agree that if said RID waiver expires without construction of the required improvements, the owner(s) or successor(s) agree to construct the required improvements at their own expense; pay to Spokane County the then estimated cost of the required improvements to enable the County to complete the same; or furnish a bond or other secure method suitable to the County•(which may include the execution of another RID waiver agreement), providing for or securing to the County the actual construction of the improvements. All of the*requirements of this agreement shall run with the land and shall be binding upon the owner(s), their successor(s) or assign(s). This provision is applicable to 12th Avenue. E24 The County Engineer has designated Typical Roadway Section Number 2 Local Access Standard for the improvement of 12th Avenue which is adjacent to the proposed development. This will require the addition of approximately 8-10 feet of asphalt along the frontage of the development. .The construction of curbing and sidewalk is also required. E26 The proposed private road as shown on the preliminary plat serving 4 lots is not approved by the County Engineer. E27 That private road(s) be improved to Spokane County standard for a urban private road standard serving 4 lots. E30 Al1 vested owners shall sign and record private road documents as prescribed by the Spokane County Engineer. These documents shall be reviewed and approved by the Spokane County Engineer prior to recording with the Spokane County Auditor. Recording numbers shall be referenced in the dedicatory language of the plat. E31 That the following statement be placed in the plat dedication: WARNING: Spokane County has no responsibility to build, improve,, maintain or other wise service the private roads contained within or providing service to the property described in this plat. By dccepting this plat or subsequenfily by allowing a building permit to be issued on property on a private road, Spokane County assumes no obligation for said private road and the owners hereby acknowledge that the County has no obligation of any kind or nature whatsoever to establish, examine, SHORT PLAT # 1018-95 / BUCKNER, DAVID 3 survey, cor_struct, alter, repair, improve, maintain, provide drainage or snow removal on a private road. This requirement is and shall run with the land and shall be binding upon the owner, their heirs, successors or assigns including the obligation to participate in the maintenance of the private road as provided herein. E32 The proposed plat shall be improved to the standards set forth in Spokane County Board of Commissioners Resolution No. 80-1592, as amended, which establishes regulations for roads, approaches, drainage and fees in new construction. E33 The County Engineer has examined this development proposal and has determined that the impact of this proposal upon the existing County Road System warrants the dedication of additional Right of Way and the roadway improvements herein specified. E35 That the following statement must be placed in the plat dedication: "The private road as shown hereon is an easement which provides a means of ingress and egress for those lots within the plat having frontage thereon." _ E90 The applicant should be advised that there may exist utilities either underground or overhead affecting the applicants property, including property to be dedicated or set aside future acquisition. Spokane County will assume no financial obligation for adjustments or relocation regarding these utilities. The applicant should check with the applicable utilities and Spokane County Engineer to determine whether the applicant or. utility is responsible for adjustment or relocation costs and to make arrangements for any necessary work. SPECIAL CONDITION: The applicant shall submit to the County Engineer from the applicable fire district written approval for the proposed turn around. The County Engineer shall also review the proposed turn around. PAGE 1 11:10:19 06 APR 1995 Road# Road Names.......... MPost.,Reference Descriptio Road Log Info.......... 05893 12TH AV (START) 00.000 WEST END TO SIESTA D U 19 PAVED 50 12TH AV 00.010 SIESTA DR (END) U 19 PAVED 50 12TH AV (END) 00.040 DISHMAN RD 05894 12TH AV (START) 00.000 UNIVERSITY RD U 19 PAVED 20 12TH AV 00.250 PIERCE RD U 19 PAVED 20 00.340 SKIPWORTH RD (END) U 19 PAVED 20 00.500 BOWDISH RD U 19 PAVED 20 00.590 WILBUR RD (END) U 19 PAVED 20 . 00.620 WILBUR RD (START) U 19 PAVED 20 00.660 FOX RD (START) U 19 PAVED 20 00.720 REEVES RD (END) U 19 PAVED 20 00.750 UNION RD (START) U 19 PAVED 20 00.840 ROBIE RD (START) U 19 PAVED 20 00.910 WHIPPLE RD (START) U 19 PAVED 20 01.000 SR 27 (PINES) U 19 PAVED 20 01.130 HOUK RD U 19 PAVED 20 01.250 VERCLER RD (START) U 19 PAVED 20 01.320 VIRGINIA ST (END) U 19 PAVED 20 01.380 WOODLAWN RD (START) U 19 PAVED 20 . 01.510 MCDONALD RD U 19 PAVED 20 ' 01.640 CL INTON RD ( START ) U 19 PAVED 20 01.760 BLAKE RD (END) U 19 PAVED 20 01.800 BLAKE RD (START) U 19 PAVED 20 02.010 EVERGREEN RD U 19 PAVED 20 12TH AVE 02.170 BANNEN RD (END) U 19 PAVED 20 12TH AV 02.230 BEST RD (END) U 19 PAVED . 20 02.390 CALVIN RD (START) U 19 PAVED 20 02.450 WARREN RD (START) U 19 PAVED 20 02.520 ADAMS RD U 19 PAVED 22 02.570 MARIGOLD ST (END) U 19 PAVED 22 02.680 BURNS RD (START) U 19 PAVED 22 • 02.770 PROGRESS RD U 19 PAVED 22 02.870 ST CHARLES (END) U 19 PAVED 22 02.920 NFWER RD (END) U 19 PAVED 22 02.980 CENTURY RD U 19 PAVED 22 12TH AV (END) 03.020 SULLIVAN RD 06079 12TH AV (START) 00.000 COLEMAN RD (START) U 19 UNIMPROVED 08 12TH-AV 00.120 GIRARD RD (START) U 19 UNIMPROVED 08 12TH AV (END) 00.250 PARK RD U 19 GRAVEL 18 05892 12TH AV (START) 00.000 WEST END TO DICKEY R U 19 GR.AVEL 32 12TH AVE 00.120 BETTMAN RD (END) & D U 19 PAVED 36 12 TH AV ( END ) 00.250 EASTERN RD ( START ) 06228 12TH AV (START) 00.000 FAIRCHILD ST (START) R. 09 GR.AVEL 30 12TH AV (END) 00.300 BARTHOLOMEW ST (STAR 06185 12TH AVE (START) 00.000 CHRISTENSEN RD R 09 GRAVEL 30 12TH AVE 00.250 WHEATLAND (START) R 09 GRAVEL 30 12TH-AVE (END) 00.370 EAST END OF ROAD R 09 GR.AVEL 30 06037 12TH AVE (START) 00.000 SHAMROCK ST (END) U 19 PAVED 30 12TH AVE (END) 00.050 EAST END OF ROAD U 19 PAVED 30 7 Records Processed ' • ,j , . S P O K A N' E C O U N T Y PLANNING DEPARTMENT WALLIS D. HUI3DARD, DIRECTOR MEMORANDUM Division of Engineering and Roads, Pat Harper Division of Utilities, Jim Red Division of Buildings, Tom Davis Spokane County Health District, Steve Holderby Spokane County Parks Department, Wyn Birkenthal Spokane Regional Transportadon Council Spokane Counry Fire District # 1 Central Valley School District RECEIVED Model Irrigation District FROM: Doug R. Smith, Planner I A P R 051995 DA''E: Apri15, 1995 Ccunty Engineeri[i SUBJECT: Preliminary Short Plat SP-1018-95 Attached is a copy of the application and proposed preliminary Short Plat map submitted by David Buckner for the subdivision of approximately 2.4 acres into 4 residential lots and those uses pernutted in the Urban Residential-3.5 (UR-3.5) zone. Please review this proposal and return your comments and recommendations by April 19, 1995. If you have any questions regard.ing this file, you may contact me at 456-2205. Please direct any written response to Doug R. Smith. Thank you for your prompt attention. rP c: David Buckner, 13824 Jordan Rd, Arlington WA 98223 Sara Marks, 1801 W. Broadway, Ste 110, Spokane WA 99201 1026 WEST BROADWAY AVGNUG • SnoKnxc, WASHINGTON 99260-0240 •(509) 456-2205 • FAX: (509) 456-2243 • TDD: (509) 324-31 b6 . , , . . . . SPOKANE COUNTY PLANNING 1'RELYMINA.IZY SHOR1, I'LA'I' APPLICAr.CIUN . ~ ~ PAR~' I , , A. GENERAL INFnRMADO~L- - . , . NAME OF APPLICANT/REPRESENTATIVE: -rD,4.V10 MAILING ADDRESS: CITY: STATE: ZIP: s-)(ePHQNE: (36o),791_ 760/ (work) I~\ / (home) iF API'LICANT IS NO'I' OWNI.R, IN(:I,Ui)!: WEti'I"1'fi'N OWNT;R ALJ7'llt)RT%A7'ION FOIt APPLICANT TU SI?ItVI? AS (tj;l'I2E51;N'f A'1'tVF. LECAL OWNER'S NAME: PHONE: MAILING ADDRESS: PROJECT/PROPOSAL SITE AFtLA (acres or sq. ft) 9~4 P-\ C-r P AD.IACENT AREA OWNED OR CONTROLLED (acres or sq. ft.) (2) ASSESSOR PARCEL, #S Or PROJECT/PROPOSAL 452 I'3: 9004 ASSESSUT2 1'Al2CCL 11'S UI= AllJACL:N'1' AL2EA 0WtJLD OIt CONTROLLEll NA S'I'N.EET ADllRESS OF PxoYOSALF, 109069 AN.ra loq(^?p) I Z~ ~q 2 0(O EXISTIlNG ZONE CLASSIFTCATION(S) (DATE ESTAT3LTS1-IED) V I"' . 17 sa) EXIS"i'fNG USE OF PI20I'CIt'1'Y , _ - COMPREHENSIVE PLAN CATEGORY Ucban SCHOOL DISTRICT CentyQ~ V a I 'C.L-I . FIRE DISTRICT ~ WATER PURVEYOR Mv00L LRRt&p-ftJ "~~S i • 1 ~ PROPOSED USE OF PROPERTY: Single family dwellings DLiplcxcs (V< Multifamily dwcllings Manufactured homes ( } E3usincss ( ) Industrial ( ) Mixcci Usc ( ) Olher ( ) - Describe: LIST PREVIOUS PLANNING DEF'ARTMCN"f nCTIONS INVOLVING THiS PROPCRTY: 14/k B . LEC AI INFORMATION: . LOCATION OF PROPOS AL: ~ C~ k Q. Yl~~ I 1 e tl ~ r SECTION Z ~ TQWNSHTP Z15 NOZT+) RANGE Yqm NAMr-- OF PUIILIC ROAD(S) PROVIDING nCCLSS: I Zn' A vFNU,E I WI~ ~ WIll'1'1-I 017PItOI'E:lt'1'Y FLtUN"1'INC UN I'U13LIC 1ZUAD: DOES THE PROPOSAL HAVE ACCESS TO AN ARTERIAL OR PLANNED ARTERIAL (~YES NO NA.M.E(S) OF AR'I`ERIAL RUAUS I Ave--t,)UE~ LEGAL DESCRIPTION OI' PROPER'I`Y (Atcach lcgal description swmped by Land Surveyor). INCLUDE LEGAL DESCRIPTION FOR ENTIRE AREA T4 BE SUBDIVIDED ON PRELIMINARY SHORT PLAT. 018 d el 95 • ' PRELIMINARY SHORT PLAT APPLICATION Page 2 of 4 TF YOU DO NOT HOLD TiTlrr TO PROPFRTY, Wl-lAT I.S YOUR 1NTFREST TN I'f? WHAT ARF TEiE CHANGL:D CnND1TIONS (7f '1'f IT: J\REn WI-TIC1-I YOU FEEL MAKE T1-I1S PROPOSAI, WARRAN"1'LD? WHAT IMP'ACT WILL. THE PROPOSED SI-I012T PLAT F[AVE ON THE ADJACENT PROPERTIES? WHAT FACTORS SUPFORT THE PROPOSED SHORT PLAT? WHAT MEASURES DO YOU PROPOSE 7'O MITIGATE YOUR. PROPOSAL'S IMPACT ON . SURROUNDING LAND USE? C. pR.ELIMINARY SHOR'L,Pi_,A"I' (1ENERAL YNFnRUATIQbL, NUMBER OF LOTS: 4 GROSS AREA: ,~5 oC) TYPICAL LOT SIZE: -t4EY 21),QC)01~~ PROPOSED NET DENSITY*: 10TAQ2C)o SMALLEST LOT SIZE: MINIMUM I-RONTAGE: PROPOSED SOURCE OF WATER: Individual wells Public system Priva[e Community System Other ( ) -17cscribe: PROPOSED MEANS OF SEWAGE DISPOSAL: Public sewer O Community syslcm O . Scptic tank and drainficlc] Doublc Plumbing ( Dr~ SIcwcr ( ) Othcr ( ) D!~SGtibC: - )~lE~~ P~'`rlb► r ~c~~Or` ~er ~=c C ~i n:~ ~ 1 ~ . UTILITY COMPANIES ANDiOR DISTRi(-.fS TO PROVIDE SERVICE TO TElIS PROPOSAL: Clcctricity: 60aS~l -WC~~~r pnt.t}P c Scwcr: l\ lo 1t~ Gas: atGt er. wt°-r Watcr: Phone: DO YOU, OR THE OWNER IN THE EVENT YOU DO NOT OWN TI3IS PROPERTY, HAVE ANY • PLANS FOR FUTUR.E ADDITIONS, EXPANSIONS OR FURTHER ACTIVITY RELATED TO THIS PROPOSAL? Ycs No ~ Ir- YES, EXPLAIN: D. PRELIMIKARY SHnRT PLA'l, IiVtPRnVEMF,NT INFC)$LM,ATrn~L- LEVEL OF STREET IMPROVEMCNTS PROI'OSED: Private roads O Public roads Arterial roads Tract X roads DESCRIBE ANY COMBINATION OF ABQVL: ESTIMATED TIME PERIOD EXPECTED FOR COMPLETE DEVELOPMENT OF THE SUBDTVTSION: ~ IS PI-IASING OFTI-1C FIN/1LiZn'I'IUN 01711I1-7 S140lt'I' 1'LA'[' PROI'OSCD? Ycs O No ~ IF YES, SHOW PHASING ON THE PRELIMINARY SHORT PLAT MAP. 1S DrD1CATTQN (7r LnNi7 F01't I'UI31,IC; USi': C;ON"1TMi'1.n'f'LD (1'arks, sch(x)ls, ctc.)? Yc;s)QNo O IF YES, DESCRIBE: * NET DENSITY IS UMTS OR LOTS PER ACRE MINUS PRIVATE AND/OR PUBLIC ROAD AREA. v. • ~ PRELIMINARY SHORT PLAT A..PPLICATI4N Page 3 of 4 PART II THIS SECTION OF THE APPLICATION WILL Pf20VIDE TFiE PLANNING DEPA.RTMENT STAFF WITH WRTTTEN VERIFTCATION THAT TNE APPLICANT HAS HAD PRELIMINARY CONSULTATION WITH THE AGENCIES IDENTIFIED. RESULTS Or THE PRLLIMINARY CONSULTATION SNALL IIE INCORPQRA'TED 1N THE PROPOSAL BEFORE FINAL SU£3MIT1'AL TO THE PLAIVNING DEPARTMENT. FIRE MARSHALL/FIRE DTSTRICT A. THIS PROPOSAL IS WITHIN FIRE PROTEC O. B. ADEQUATE ARRANGEMENTS (HA V F H A VF, N OT EEN MADE TO MEET OUR NEEDS IN PROVIDING FOR AN ADEQUATE WATER SYSTEM AND FACILIT'IES FOR FIRE PRO'IECTION PURPOSES. C. RECOMMENDED FIRE FLOW:( 6 //q ; OR UNABLE TO CALCULATE NOW BECAUSE USE TS NOT DEFIIIITIV~; AND WILL BE DETERMINED AT BUII.DING PERMIT APPLICATION TIME. D. REQtTIREMENTS INCLUDE: /F~ v!1 ~5~ XII~+.~~~+~- 'ld_Cl~,~y~- - -W- V . ll ' " FIRE DISZICT ~ SIGNAT'URrfPI"T'LC DA'I'F WA'1'14,R PURVEYOR A. SATISFA,CTORY ARRANGEMENT -STIC WATER AND FIRE F~.OW REQUIREMENTS (I-IAVI;) (~-iAVI~, NOT nEEN MADE. B. REQUIREMENTS/COMMENTS: /Q~.Q~-o•` , o . WATER DI. RICT SICiVATUKE/I'1'("LE DATC d"01 COUN'I'Y ENGINEER A P12ELIMINARY ll1SCUSSION MAS 'I'AK.E:N PLAC:C AND GENEKAL REQUIREMLNTS- FOR kOADS AND DRAINAGE HAYE BEEN DISCUSSED WITH THE APPLICANT. A. COMMENTS: ~ . . l I'` v rC/ ~ 60 ~ SIGNATURE TLE DATE COUN1'Y UTILI'I'TI;S A PRELIMINARY DiSC[JSSION HAS Z'A.KEN PLACE AND GENERAL REQUiREMENTS FOR SUBMITTAL OF THIS PR4POSAi, (EIAVL) (HA~V~Fj NC)T) BEEN SATISFTED. THE DESTGNATED W ATER PURVEYOR FOR TI-iIS S ITE i S A. COMMENTS: - ~ - ~ %~il x/C~ - SICINATUREV1'ITLE DA'I"E HEALTH DISTRICT A PRELIMINARY DISCUSSION HAS TAKEN PL • ERAL REQUIREMENTS FOR SLifiMii fAL OF THIS PROYOSAL (IYAvF~ (HAVE NOT BEEN SATISFIED. A. COMMF.NTS: /11-1 ti S nTuRrtriTr_,r nnT•r r S1:wi:R PuizvEYVit A PRELIMTNARY DI5CUSSION I-IAS TAKCN PI-nCC AND GENCRAL REQUIREMrNTS FOR '('f-IF_, PItOVISION Or f'UB1.IC SEWLIZ Altl~ tJNllE'_-'1tS'1'(JUI) 13Y "t'IIL: AI'1' CA.N'I'. ~ A. COMMENTS . G : SIGNATUREjI'I'T'LE- DATE ~ - , ~ . 0 1 . ~ • . s ~ PRELIMINARY SHORT PLAT APPLYCATION Page 4 of 4 PART YI7 . SURVEYOR VER[FiCATION ~,iuE 4t,q~ r n I.,ICrC:N5t~D I,nNn SURVRYOi7, 1(AVI: COMPI.,ETTD'I'11E 1NFOftM/1'f IQN E. .~~t:G l, L:SCfZ1lYl'IUN AN13 i'14:t_.IMINJ\1'tY S1-IO1tT PLAT }-1/1VL I3EEN P(tE:1'ARCD !3Y ME OR"U YP ~I ISION IN ACC:UItI7ANCL W1'1'l•1 '1'FIE IZLQUIREMCNTS OF THE SF'UKANE COUN? ~z4NIN DIVI~I REG LATIONS AND THE LAWS OF THE STATE OF WASHINCTON. C' 2z9s1 DATE: ~',s v ~~NaL LA RES S PHONE: C~Z 93) Sl~~ 9 EXP+RES 7/29i y~ G ZIP: , PART ZV (SIGNATURE OF PROPLI2TY OWNERS OR LETTER OF AUTHORIZATION) I, THE UNDERSIGNED, SWEAR UNDER PLNALTY OF PERJURY THAT THE ABOVE RESPONSES ARE MADF_ TRUTf-IFJLLY AND TO "I'RC 13F.,S"I' Or MY KNOWLEDCE. I FURTHER SWEAR THAT I AM THC OWNER OF RECORD OF TH_E AREA PROPOSED FOR THE PREVIOUSLY IDENTIFIED LANI7 USE ACTION, OR, IF NOT THE OWNER, ATTACHED HEREWITH IS WRITTEN PERMISSION FROM THE OWNER AUTFIORIZING MY ACTIONS ON HIS(HER BEHALF. SIGNED: DA V t,1*) :UV rSUC-. ►'t -e r" DATE: 3- l3 " 9I_s-- ADDRESS: 13 -T. r~LG ~ !rZ cI • PHONE: 340 " ZgOI A r l►'~`~~ % f 1': SIGNATURE OF APPL~CANT OR REPRESENTnTIVE DATE STATE OF WASHINGTON ) ) ss: COUNTY OF ) ~ ypko ~ SIGNED AND SWORN TO/AFFIRMED BEFORE ME ON Tf-IIS DAY OF ~YYIOL~e,~`.. l ,499-3, BY . - ' NOir..A~:Fc S~A'z. ~I/~ ~ U he State of Washington -Not.ar~ ubl' ='tt Resicii\g ZIL: My appoinlmcnl cxpires: -7 1'Alt'I' V (TO BE COMYLETED BY THE PLANrNING DEPARTMENT) llATE SUBMITI'ED: ~ I12 J3,S FILE It: SP- 1 J 1IF 9 S DATE ACCEPTED: BY: ~ - i TOTAL FEES: I ~ , 0 0 RECEIPT Yz ~ ~ 95 . r ` ~ V SPOKANE COUNTY PLANNING 1~j . ~ PiZLLIMI.NARX SHOIZ'1,, 1'LA.rI' A.I'PL,ICAri,IUN - ~ v . PAR'I' I 2 Y A. (TENER,A,L INF'OBMAT.. ON: ~ NAM.F_ OF APPLtCANT/.RCPRESEN`i'nTIVF: nc, , MAIL]NG ADDRESS: i lD ~ ~ ~ CI'I"Y: STA7'L: ~ 7I E': ~.~ZQ I PHONE: (%vork) ~ ~ ~ (homc) lF APPi,ICAN'1' I5 NO`I' OWN1?R, IN(:LCIUE, Wf2I'I°I'1?N OWNf;R Al1'I110RII.A'1'(UN FOlt AI'PI.,ICAN'C TO SElZVI; AS IZ1;1'l71.,S1;N"I'A'1'fVl;. l.,EC►AL UWNER'S NAM1:: ~~..--e _ l'1-IONE: MAILING A.TaDRESS: ~ . PROJEC'I'/f'ROPUSAI SITE- AREA (1Ct'Cti C)f S(l. fL) 2,4 IV-rE'--s ADJACENT' AREn 0'A'NFD OR CONTROI.,LEll (acres or sq. ft.) ~ ASSESSOR PARCEL #S OF PROII:CTJPROPOSnL 4-5-2~--,~, q C) (o~- ASS}:SSUR YA12CE-1, ll'S UFAl)JnCI--'N'1' ARC:n UWNI~~I) UR CON7°RULi,Lll fqA sTxEcTAnuREss OF PxoPosni- F, 1090(0 AN,, I 0(0 P-) 1 Zt}' EXISTTNG ZONE CLASSIr'ICATiON(S) (DAT` ESTnr3L►sl-ir:u) v ExIsTINC us17,c~~7 PRorF RTv - ~ . COMPREHENSIVE PLAN CA"I'EGORY OCL-xD,,n SCHOOL DISTRICT rnl~~1 vakE'-_t-°i FIRE D15TRIC'I' 7j~- WA"1'ER PURVFYOR MvDEL- PROPOSED USE OF PROPERTY: Singlc farnily ciwellings O Duplcxr.s (vI/ Multifamily dwellings O M anufacturcd Iioi►ics ( ) I3tisiricsti ( } Indusl.rial Mixcd Usc ( ) ~ Othcr ( ) - llcscribc: LIST PRt:V10US I'LnNNING D1:Pr1R"l MI---N'f' AC"1,lUN,~', INVOLVING TF-11S P42QP`RTY; r , B. LEGAL INFOWALr[c)~L- LOCATION OF PROI'OSAL: SECTION 2) TOWNSI-1iP 2-5, NDR-n-I RANGF /4 YJM NAML OF PURLIC RQnD(S) ('170V1171NG ACCESS: 12-9 Av~NUr 1L'Ila'1'tl UI', 1'1ttJI'Llt'1'Y FIZUN'I'iNG ON 1'U13l-lCr ItUAU: llOES THE PRQPOSAL HAV~' ACCFSS TO AN ARTE-RIAL pR PLANNEll ARTERInI- (V~YFS NO ~ NAME-,(S) OF niZ"1'fa12IAL ltOAD5 1 Z A Ve~N U G LEGAL DESCRIPTION OF PCZOPER"I"Y (ntuich icgal dcscripiion stampcd by Land Surveyor). INCLUDE LEGAI.. DESCRIPTION FOR FNTTRE AREn TQ k3E SUBDIVII7CD QN PRELIMINARY SfiOnT PLAT. tiF-c A T r" .-i En ( 1 ( ♦ P.IZELIMINARY SHORT PLAT APPLZCAT.[QN I'age 3 of 4 PA.RT iT TI-I1S SEC°I'ION Or TIIE Anl'L1CA'1'lOTI WI[_.I.. PROV].DE '1'HE PLnNNING DFPARI'MEN7' STA~ WI7'ki tiVRITTEN VERIFICA'I'ION THnT TE-{E APPLICnN'T' NhS 11All PRELIMINARY CONSUI 'i"ATION W1TIi Z"t4E nCLNCIES IDEN'i'Ir1CD. RCSUL7'S OF'I'Hr PftFI1..1MfNnRI' CONSULT/1TION SHALL BE iNCORi'ORA'TEn IN Tl-IE PROI'OSAI.. I3ErORE F[NAL SUIiMI'I"1'A1- '1°0'1'{-i1: PLi1NNING DFPARTMFNT. FIRI: MARS1IALLIFIE2E 1)X,S'I'RICT A. TIIIS PROPOSAL 1S WITHZN FIRE PROT.EC)jQAd-DI;TRi ' O. B. ADEQUATE ARRANGEMENTS (1TAVE~, IJIAV~ NOT~LEN MADE TO MEET OUR NEEDS IN PROVIDING FOR AN ADFQUnTE WATE12 SYSTEM AND FACILITIES FOR FTRE PROTECTION PURPOSES. C. RECOMMENDED FIRE FLOW: 1666 OR UNABLE TO CALCULATE NOW BECAUSE USE IS N0T DEFTNI'I'IV~; AND WILL BE DFTEI2MZNED AT BUILDING PERMIT APPLICA'I'ION 77ME. n. REQUIREMFNTS INCIIUDC: ifIvhl"I A~~ivn~.~ i_6604-aL-- _ r , ~l~ ~ ri~tE urs~lc-r StGNnTUitEDn•rr ~ . 1VA'I'I;I2 PU[7VI?YOR A. SATISFACTORY ARRANGEMENefli S T'IC WAI'ER /lND rIRE FLOW REQUIREMENTS (1[AVI,) AY l; NQ"I' T3ECN MADE. 13. REQUIRFMENTSJCOMMFNTS: f ~ _ t /v V//vs. Q/V¢1t~ (o II ,x..IJC ~ Aw.-s- ~ L~~ ► - ratI4 e 'f i'oAI wnI°Elz 17[S 'cztC~' SiC,tvnTurtr/i~~~~'Lr DnTc ~ - COUN'I'X FNGJ iVE f:R n PRLL1111INARY 171SCUSSlON i-1/1S '1'nK.LN PL/1CC AND GENE-17AI., RCQUIREMEN'l:S FoR RoA.ns ANll DRAINAGE k[AVE BEEN DiSCUSSED WI"I'H THF, APPI ICANT. A. COMMCN`I'S: SIGNATURE 'I ILE DATE COUN'l'Y 1J'1'1L,I'1'II,S A PREL1MINnRY I7iSCUSSION I-1nS '1'nKEN I'LnCI: ANll GCNERnL REQUIREMLNTS TUR SUBNiITTAL OF I'}iIS PR4POS/AL (I1AVL) (tlAVi, NU"I') 13EEN SATISFIEU. TFIE 17ESIGNA'I`F-D `VATER PURVFYOR FOR TI-1IS SI'I"E 1S A. COMMEN'T'S: • S [G Nn"1"URl-V 1'1'{'Lr-, Dn"I'E 11E A i.,' 1' f-I I).i STR 1 C`I' A PRELIMINARY DISCUSSION HAS TAKEN PLACF AND GENERAL 12LQUXREMENTS FOR SUBMITTAL OF THIS PROPOSAL (1-IAVi's) (IIAVE N07') BEEN SATISFIFD. A. coMMENrs: Sic ►NnTURr:[riT1..r DnTF, SE'W(;li t'UftVf;Yt)12 A PfZEI.,IMINARY DISCCJSSiON i(nS TAKF,N 1'I.,nCi.; 11N1) IZFQU(Rf~Mf:N'f'S FOR 'I'Hf: I"IZOViS1UN UF-1'Ulli.1C Si:WC?it AIti: I_1NDEltS'1'(.)U1) 13Y 'l'I Ifr nl'I'LIC,'AN't'. A. COMMENTS: SIGNATURGfl'1TI_E DATE r ._:RMIT CENTER PASSPORT . _ ~ Date: f ~ 2- C-i ` Number: ` Name Phone Address Comments: CUSTOMER ROUTING . . . . . . . . . M1•::'.. . v . 'l ':A:.:~ :•.1:~' ~ . . D.: ~ . . ~ . . ~ • ~:'.::•.i~.. , ' : . • ~ . h•::::1.. ' / ~.'fi: :1.~ ~ BUtLDiNG e artmeni::~::~::::::~:::::::~~:::::.> :Pt:ANNING De artment ~ENGI..NEER . . . P . . . . P- • r.. ~ - . - -Pa::_ . . i Addressing i Admin. Fxception i Approach Permit i l3uilding Permit Arterial Rd Plan Info ` Flood Plain Permit i Codc Infornoation ~ Binding Site Plan Info : Public/Private Roads _ CommErcial Rcview _ Cert. of L^'xemption ~ Res. Bldg Permit Rev. i Conference _ Comprehensive Plan i Site Drainage Info Zr-~ ,A~~. = Energy Code Info ` Cond. Use Permit ~ Subciivision Review i Firc Safety Review ' i Nonconfomi ing Use i Utility Permit Manufactured Home Pcrmit Rcview Zone Change Rcview ~ Mechanical Permiis ~ Shorelincs Infa ~ q,~ Z~ 3.c7o<< l - - ~ ~ Other Pertuits ` Short P13t Info NO FET? IZEQUIIf:ED iReviewer / 1'ime out !]'lumbing PcrniiLs ~ Subdivision Info ~j C. G~ I V. Private Raad Info '1'emp. Use Permit Y~UTlUT1ES Residential Review Variance Appl. APA Payment Sewcr Permits Zone Check Cert. of rxcmption Zone Info Subdivision Review ULID/Scwer Tnfo ~ 7~onc Ctiange Rcview . NO l~l?I? KF_QUIIt1:D NO I%Ii1: XEQUIIZI;D ' Rcvicwcr l'imc out Rcvicwcr I-imc out Rcvicwcr Time out AAS"IER1t'ASSPU:tI.CIR 2118/93 ~ , v TRANSACTION NUMBEK: T9402050 DATE: 11/28/94 APPLICANT: DAVID BUCKNER PHONE= 206 334 4795 ADDRESS: 219 81ST AVE NE EVERETT WA 98205 CONTACT NAME: DAVID BUCKNER PHONE= 206 334 4795 TRANSACTION: PRELIMINARY SHORT PLAT DOCUMENT ID: 1) 2) 3) 4) 5) 6) COMMENTS: 45213.9044 FEE & PAYMENT SUMMARY ITEM DESCRIPTION QUANTITY FEE AMOUNT PRELIMINARY PLATS - SHORT 1 100.00 LAND USE ACTION REVW 1 20.00 TOTAL DUE = 120.00 TOTAL PAID= 120.00 BALANCE OWING= .00 PAYMENT DATE RECEIPT# CHECK# PAYMENT AMOUNT 11/28/94 00013998 5168 120.00 PROCESSED BY: CAROL FRAZIER PRINTED BY: CAROL FRAZIER *************************,r****** THANK YOU ********************************,r***