Loading...
1983, 04-19 Permit: 83A-3072 Furnace, PipingNUMBER APPLICATION/PERMIT SPOKANE COUNTY - 1018PARt MENT OF BUILDING & SAFETY NORTH 811 JEFFERSON / SPOKANE, WASHINGTON 99260 / (509) 456-3675 APPLICANT: COMPLETE NUMBERED SPACES - PRESS HARD TO MAKE 3 COPIES STREETADDRESS PARCEL NO. . 0. ZOIC 2. � LOT I BLOCK I SUBDIVISION LEGAL DESCRIPTION: OWNER PHONE PHONE 3. PERMIT NUMBER _`�) 21 /�— MAILING ADDRESS ZIP Actual Set Backs in Feet to: No. Fin. Rooms No. Dwellings North South East West COtiTRAC OR LICENSE EXPIRES PHONE Size of Parcel Zone Classification al ❑ Residential Q G WORK El BLD. ElB PLM ❑ M.H. ElPOOL —� or Variance Commercial ❑ 4. DESCRIB WORKj 8• `> G� Shorelines/ Flood Hazard Plans Required ❑ Yes❑ Not Applic. ❑ ARESS ZIP Type Const. Occupancy Sprinklered �A UBI PLC O SEWAGE EIE PC OwnershipO ❑Yes ❑No ❑Req'd. ] DESIGNER H NE New Const. Valuation Remodeled Valuation Total Bldg. Floor Area v 7. 5. Public ❑ Private ❑ 1 hereby certify that I have read and examined this application and have read the "NOTICE" provisions included on ADDRESS ZIP Main Floor Upper Floors Garage/Storage Greenhouse thority to violate or cancel the provisions of any other state or local law regulating construction or the performance of construction. SEE REVERSE SIDE FOR REQUIRED INSPECTIONS Plumbing SIGNATURE OF %� APPLICATION i CHANGE OF USE FROM TO Cover Deck Uncv. Deck Fin. Basement Unfin. Basement - 6. SP L CONDITIONS: (SEE REVERSE SI E FOR NOTICE) PRELIM. FINAL DATE (/ � j� % �J TYPE No. Baths No. Floors No. Fin. Rooms No. Dwellings NEW ❑ ALT. ❑ N. El RPL. ❑ MVE. 7 OF ❑OTHER Certifi. of Exempt. Required Yes❑ No❑ Number WORK El BLD. ElB PLM ❑ M.H. ElPOOL or Variance Received Yes❑ No❑ DESCRIB WORKj 8• `> G� Shorelines/ Flood Hazard Plans Required ❑ Yes❑ Not Applic. ❑ Received ❑ VALUATION SOURCE GAS ELECTRIC UBI PLC O SEWAGE EIE PC OwnershipO FEES COLLECTED 9• I UTILITIES PRIVATE ❑ SEWER ❑ Public ❑ Private ❑ 1 hereby certify that I have read and examined this application and have read the "NOTICE" provisions included on reverse side, and know the same to be true and correct. All provisions of laws and ordinances governing this type of Building work will be complied with whether specified herein or not. The granting of a permit does not presume to give au- thority to violate or cancel the provisions of any other state or local law regulating construction or the performance of construction. SEE REVERSE SIDE FOR REQUIRED INSPECTIONS Plumbing SIGNATURE OF %� APPLICATION i OWNER OR AGENT c.•c- DATE C � J/--`-- Mach. --h-- SPECIAL APPROVALS SP L CONDITIONS: (SEE REVERSE SI E FOR NOTICE) PRELIM. FINAL DATE (/ � j� % �J Plan Check SEPA Modular/ Env. Health Planning MFG. Home CDCD Fire Prevent. Other (Specify) U tl31 Engineer 4 f tL Utilities TOTAL $ SEPA PERMIT IS NONTRANSFERABLE WHEN MACHINE VALIDA""':D IN THIS SPACE, THIS BECOMES A PERMIT.. Plans Exam. PERMIT IS NULL AND VOID IF WORK HAS NOT COMMENCED IN 180 DAYS o 4 �j n 7 7 9 - 8 3 /' z 18, 0 0 0 -j Tech ing ( I DATE fSSUEDl PERMITN7 `