BROADWAY E 10814 ADD NURSERY TO NAZARENE CHURCH
t 6
~
BLDG. PERMIT or - FILE #99 ~/14 1i-
t z ~ s / Date to Review . ime #
Date Received 191
~
Project Name iWJJ,/2,7 No. Lots No. Acres
SITE ADDRESS /-r- /CIf/4~&rt~'1ACe ~ /lv ~ PARCEL # /Cc r ~ ~ -
~ y~ s-t-r
Sponsor's Name 7~I ~1-le , ~.~l~~°z~' ~Phone #
.
Address Work #
, - /
Date conditions mailed
Contac person 1,1.~1fn4 Phone # &v?
FLOOD ZONE Yes No Engineer / Surve or's / Architect's Name D,~,~ Y ~ ~
Water _ Address Ld ~ /
P
Sewer
SchUOI ~
Planning Contact Person Phone #
Date Submitted Description Initials
-Clt
,
~ .
NOT CE OF TRANSM TTAL (P
. . • . •;:.~M1i ~i}. r _ _ . ' , " - .
• r - . . - . . . . ' ' . ' • ' " -
. . _ " • . . ti~ , ~ . - ' . . _ , ' . . . . • "
. . : ' . • r..:~..v..'.. ' ' '•t '
AD D.R~E~S~S~~ ._P:ARC~EL
-
- - . . . . . . .
- -
. . . . . . . . . . . . . - ~ . : _ - . . _ . . . - : . .
AA11sr/' y 4c'~ ~ ;
P ROJ3ECT:~ R'OJ ECT::#::: 71 j
.
. .
. . . . .
.
D E:.:.::.::.:.....:
. s
i..
~
. . r ~ . . . . ~ .
S
' • J'Y1•}fh.••:::: ..."...'y:.~. ...'v:f:::XJ......:'. • .
. . " • _
.
. . . ~ . . . l . •
. . _ . • I~ t•.:ti'-..
P... , . . . - -
. .
. .
R . , . . . . . : .
. . .........:.:::..:r. . .
. .
. . . . .~~ti.~:..:::.::~:-.:__.:- . . . .
- . . . . .
- - - ~ . . - . : _
. . . . . . . . . . . ~
. . .
. .
: - - - .
- ~ .
. . _ : ~ : r.... ~
. . . . - . .
- . ......r.~~ . . :.r. . .
. .
-
. . .
. . .
.
. . . .
. . . .
.
r.:.:
.
.
.hx r
:.v ..:ri:v'r::ti~:~?}:•:
"
}'r'.::ti:k:.:: rr" :
? . ~j
l~.::: :•"'}{i:;:::
{;r.;;'-r`" j~ L•
;r: ti{::.P:~:OfN~E..
.OUVN.~F~>:~:::::::.
.
~ ....:.>:.r:r::...:::::.
..r:-.
. . .
. .
.
. . - . . .
. . . . - -
.
- - . . . _ . . . .
" . . r ' ' ' : . ~ :;:n.'; :
. . . . . . , . . . .r:::;~
:.::{r: ~ : -
.
. .
- • - •••.~..~u •r•+r :
, . . - ,
• . "
.....:'t::.~..: .
.
•~:.:ti::
. ' ::.:ti'..L:•l.:..... . .
- -
. . ~ ..........r.~ .:~i:.~~ : _
. '
. . ~ . . ' . 7 ' ; ' ' ~ Y ~}4}r}_.~.}:•.,~.:
. . . - . - "
. . """"r";'
. ' ' ........:.:•:5.:::~:::y:;:i
. • . ~~•y•• . . .:1ti
. . . . ~ r:::: • : : - . . . .
CONT C.. - .
. : ~ ~ . . .
.......N.....
. . . .
TYPE OF CONFERENCE
Pre-Application ~Pre-Construction Other: DATE:
TIME:
DOCUMENTS CIRCULATED
DATED REVISED
APPLICATION I
SITE PLAN I
DRAINAGE PLAN ~
LANDSCAPE PLAN ~
Other: . ~
Other: ~
ADDITIONAL iNFORMATION
CIRCULATED TO CIRCULATED BY
SCAPCA-M. Caine Utilities ~
Engineering Fire District #
Health District Liberty Lake Sewer Questions? Contact .leff Forry or:
Planning Other:
Spokane County -
DIVlSION OF BUlL01NGS
West 1303 Broadway Spokane, WA 99260
(509) 456-3675 (office) or (509) 456-4703 (fax)
SPOKANE COi1NTY DIEPARTMENT OF BUILDINGS
r . ~
I W. 1303 BROADWAY AVENUE
SPOKANE, WASHINGTON 99260
(509) 456-3675
I certify that I have examined this permiVapplication, state that the informetion contained in it and submitted by me or my agent to compile said permiVapplication is true
and correct, and authorize Spokane County to proceed with processing. In addition, I have read and understand the INSPECTION REQUIREMENTS/NOTICE
provisions included herein and agree to comply with same. All provisions of taws and ordinances governing this type of work will be complied with whether specified
herein or not. I understand thet the issuance of this permiVapplication and any subsequent inspection approvels or Certificates ot Occupancy shall not be construed to
give euthority to violate or cancel the provlsions oi any state or local law regulating construction, or as a warranty of conformance with the provisions oi any state or local
laws regulating constructlon. , •<•>,;i • ~ ~
SIGNATURE OF',`-' APPLICATION
OWNER OR AGENT DATE
i~'I~it?.~i:::C;'T' Nl1~i~iE::F'tiss 5~~i ni)~a.'A'. , , L. 1 C:` r=1
F l: C) ~1
P r+
'1; h~l :I: ;l' ti ~'1 A F' i:°~ I~: t`' 'f: l'
I~' C:: N Fl i... 'Y' C:,S W:~ I... t.. S:~ 9 I::: P I"- Cl i.. (.1 t,S ~S f., l. NG W!)Pi< I..~ I I'T i~~' I~~: i~i ~
, :C 'T (7
~S' "f' F~ f::' E" 'T' : •1 04 1~~ E~ I:i F'~ f~1I} ~~J r11~' ~1,'+,~ ° ~ ,
.f:;~• . .
r~X) Dl~i(:"~'~'=~ ,'f'°' r3 1< A i~l:-Wf1 ~~~i ;?~?E}
F'I:_fttl :C1' IIS E:-° NlJRSI:::I°iY tAi*!"'f Cl ir()I.A.E"y t44i;%r;~;~►,•"T=a~:,.' r'.;•i;F,(.•!
I':' I... (1 ' T' 4'3: 0 0 1 f33 r~ f..' L. A'1" N A °'f F" 0 „ T fR . 1 • :3 5 4
I:{ L C) C I<"... l.. C) 'i' l.~ N C:' -:I.J!"i 3 F:
r•'1 I' I ~ r-j 00000000 I•' i (`i f= GJ.T.DT ~-i = i 4 E~ ~ 4~ F e ; ' 7 0 RGJ 4
.11~ CJ F Bl.. C3 C S= i A~ D WE L. f... .T. N E ~ W A t' F. R Y:'1:C '3' "f
(a W N I" g 1=' f:1 K(I iq r.:: V l I r° `r` iti! (1 r'~ F~ E: t~ F.:: C: {~I .i I~~ C' I-i f~' I•4 (:1 t~f E.~ ; :y ~2
> 4 w;
.ST(~i~:F~:1' - 10 H14 I:" N1~~Cl~I?WF1`r' AVf:" .
A i) UR I:'S'S=: tiS`POKANN Wf•1 99206
. . A r.:•
t:: t:l N'C' Fa C' T Fl ~'f f•_" =
f' C? i'~ ~ I, ~ fi• , >~';~C'~ s'):? ''4 fi; 3 F:,
~ .
B!.1:f.I..n1:NG;.SE7BACKS,;.,-. FROAlT:.. Nr•`1 i...~~1°:•i":.. NA R :CCxl+T'::-- NA
•)f ~t ~E ~t ~.~t H ~ ~ ~ 3~ # #f,?1E ~i ~ # # i~ ~ ~t ~F x ~ ~E ~i ~G ~i: REVIEW 7 ~ ~ ~ ~ ~ ~ TIrl N }t'• ~r lr ~tl'• 3i fi: )t. .}ti yr, .?t ~1ti• ~~i~ ~rt i~: at ~ri #i •}i• ii ir ~i~ ~)t• ~t ~tv
X) L•:: I"ARTME0 • ~ ' IRE 11:f. I::: W i7 M i`'S C:A'T' S Al p I'ti f ;11.~ C~i ~
F~ M 17. 14
r-ilJ:i;I...U:l:N t.; P L..FaN- IR E 1.r:CF:W I;I°:C;l1:CR I:::D ~
. . . _ < . .
T:{ t.l ? T) .T. N f r Sf:. f 1.+ AC; K I`4 E; V1: f:: W RI::: QU:C REI) ~
P 4J :l: L U 7: iN t.", 1::7 NC:r r, GY i°' I._ AN i-i f::: br f::: W F? f:: Q !.l 1 1RI:': D . . . _ . .
f::~lC71:~lf::r::r~ S'~~'E: n~'~r1~:,~F~CTf: "T'Cl T:zF: F~E:V:C~"W~'T? ~.._...e_..._._.__._._..~........._..____.._._..._
!•i E. r11...'1' IA D :I: N T NE W Q R r1 DI)1 T:G f_1 NAl... W ii 9 7" r: W r.,'f E R _ . _
1':'L-- r-)NN :i: NG ET. T r" PI... AtJ fti EV:i: l::: W I:**: QlJ T RED _
F° F2 C= D 19 T F :l' IRfi : f' LOW TC.l z? ! = :F. i W r" D ~ .w .r.
)i• ~i ~yt * * * ac 9. X. k at• X. M. * U. * it• * * * * * ii• * k * ia- # ii• 1:1I.) 1 L D I N Cr PE h M .T T 3i ~z ai• p i~: ?t• .ti• ~n: 3t •3E )f• ii iE 3ti •?i ~lt• ~ •?i :K• ~1~ ~i iE ~}E ~t
c;t~N T rtA c:T caR~ uNKNOw~ I"Fi0 N C:::::..
9 TR E:f"T,--: IJAIKNQWN
A UD FR C"S'S':r- lJNK NOWN Wo- tJNK NOWN ~
Nl^W= Fi'E M f:lT1E l... r) D 1> 1: T 7: i:?`rti~.. Cl~~ (,l x F'
D W f: l_. L. tJ ~I :I: '1" S'-.. 0 C',111T` e L. D~- C{ l_ l~ t:~ h~ CY 'i' .W 4 ~T't1 ~i' 'r F. _
T~1..,1.UC W X I? 36 X R$() EQ C•"T ~ 1440 at"F'Fi.T.N K i...l°'d:.. N
R E: Q P n R i< 'i: N t; 1. HF) .l~? :f: C`. F> f'; Fti :I: 'T' :f. L~ /a~ L. 4~~
1) 17 S C R x F'I'r, c~ N cY R cz (i r~' 'T' y P 1:7 Sc, F*T ~f A i. 'r 11) N
r_:i...nSS r,0 0 M Y{--- 2 V~~ 1440 14.;1 -0 6 0,,)
. .
t~ t.l 1~4 , ~ f::: I~~ 1► 2 . v . r~ 14~a U . .
f.; m I) E:. l.. 7.4 - ? VN r: i}o i~
U~ f~ I...(') C) k ,?1\1 8 0 .•''::::7 f. ~.°i~:i
T f-:: H D I::: "N" c f•; I FT 10 N rr! i.; r'~ N1-1 f . ~ ~ ~ + ~ i ; ~ ~r
t~ ~'i ►:w' Fi :I: F+ L. 'Ur a11... l s F"~ 'T' 'f. t ~1 Pd 4' 0
I`'i...AN RE::V:I'I:::w ,.:;..y
lJ N'r' Y ,S' lJ !••i ~i F~ C: Y . .
*•)i• f:: NCY :i: NF: f.-:: RS Ft F.:: V:I: F1,J
• . • ~ r~. , .
t i• . ~ 1~,r?'~w;,~„ y, ~ . „ ~
~f 4'
~M' . I ~ • ~ ~ i~ ' ~ ' ~~i
PUBLIC WORKS DEPARTMENT
' •',S'~~ ~ ':L:.~!~.~;':~' OFFICE OF
COUNTY ENGI N EER
.~w...'.'.'T ~*.~;~~;tw !~`.~:`•J~a~;"'"''i~L 1
v-~ ~ 5;~; ~ r , RONALO C. HORMANN P.E.
,~..~h,.,;:-~, • ~X : ~,t ,
COUNTY ENGINEER
w•-- _ _
SPOKANE, WASHINGTON 99260-0170
•X01,.,N1 (.,t ,.M)SC
AGREEMENT TO PAY FEES
t Number 5or 00~
Agreemen
This agreement between Spokane County and Spokane Valley Church of the Nazarene
whose interest in the project is Snrnkane vallPV Chiirrh nf rhP Nazarene
, is entered into
this lLtr day of a„ ,Mr , 19 C)1 . This agreement is
applicable to the pro7ect known as:
Spokane Valley Church of the Nazarene; 10814 E. Broadway; Spokane, Wa 99206
. That the individuals and parties named herein as having an
interest in the above described property or project agree to the
following:
1. Reimburse Spokane County for project review and inspecti.an
fees as specified in Board of County Commissioner's
Resolution 80-1592 attachment C, as amended. The fees will
be based on actual salary costs incurred by Spokane County
for project reviews and / or inspections plus a ten percent
administrative charge, and will be bi.lled monthly as
accrued.
2. The undersigned agrees that these fees are due and payable
upon receipt of the billing as specified above. The
monthly billing should be sent to the attention of:
Marge Millard. treasurer
l f1R~/ E. $r. oadwav
Snokane _ ~,TA
z
99?.0h
(509) 926-1545
I undcrstand that £ailure to pay these f_ees may result i.n
del.ay in completion or appzoval of the pzoject oz othez possibl_e
sanctions.
IIy
R.andal E. Denny, Presid t
Spokane Valley Church of the Nazarene
I)ulflic Works [3uilding j Nortl) 811 Jefferson Street / Spokane, Washington 99260-0170 (:709) 456-3600
- - t.
. _ • . - - •2 i - • - ,"7 y ' 'r~. 4, ~ . . i- r . _ F . ~ - . v.. r
- ~ ~ - T Ti' - - . r ' - ~
_ - 'F _ ~ ~i' • . ' _ .R' ~ Y . ~ '
_ 'v.k k ' - ' ~ ' ' • _ ~ . ~ . ' ~ ~
, . _
4 +
. ' '
_ , . • '
0 -ry r ~ - • ~ .
POKAN.~
,
A
3 S,, S ~ :1$
~ - .
't
° °*'q - ~ ~ - '~.zk~~~ -rf
_ . _ . r ~ ` - _ ~t . . - - . -
c.•~'~
1
~ R*A
1 N'.
i
34D
u3.~
~ - . ` - ' - l .
_ ~ :~•r 91) Er
❑ ~
87
h ' LEf~~J~
H r "r ~
QD,c CQe 'O CJ~
~If 1~ r F7❑
~ ~ ~ ~ ~ ~I, ~ _ - -
_ ~ 'z~ ~ ~ I~ • ~ r~. ~ ~ r 4 7 L ti f r'9 ~ ~
- ~ - , ~ r G77c~3a
_ _ - . ' ' ° fl ,s ►..4~ f✓S-~~ + l~S 65 8l. Z7 ~
~
fr,c ~ ~ '
~
I ~o
. ~ fi.
4z
. ~ ' r r ~ ~ y! ` ~ ~ ~ ~ f ~
14 1'{~
''9
Iq~{~,
4 - ~ , I ~ ~ ~ ~
r
rl @Ij72 T ~ _
r
~ 3N
L5
~
- -L_.. I { ; . - - ' ~ - ~'~.~-,t, _ ~M q ~ `
- -1 r .esi - i - . J~~ 'e • t,.
,r _ ~ , ~ k • - ~ ' 4 { '~~.Y* ~ + t+~ :.r'T~`"t~ ~".~S s r~s ~~~r~s- ~ r }~4 9~ ~
f T~ 7,F739 i • {dz.S~r
~ ~ ~ ~ ~ $ ~ ~ ~ ~ ~ ~ ~
~ I k r . • 41-7
~
~
I ,
~
. , _~s~. xy,~.• ~ ~ ~ t ~ ~ , ~ R i :.,sa:~ras.~~ _ _ _ ~ -
J 7 . . L f' • ~ . , .
~.,i ' . •
~
dV o
. '~a.
, . , ' ~ •
Br"FORE THE EOAR.?~ OF COUNZ'Y COMTviISSZOIlTEIZ& OF SPOIS:ANE CQUN7y, WASHINGTON ' . . . `t , . , . . . -
.
IN TH~ MATTER OF CH~RICrNG T1r-.~O~tl~t~.~.'~ MAF'
FROM AGRICULTURAL TU ACRICOLT URAI,; 3Uat;TRg,AId' ~ ON PROFERTY_IN SECTIQItiS' 16, & 1`7; TOWNSI3IP ~ - -
25 N., RANCE 44, E`: W. M': ;'SPOXANE' COUNTY,
WASHIIIIGTUN. . - . ~ R E S G LUTI ON
. . , ~
. - . , , ~ . .
. . . .
The above entitled.mat#:er coFninq on regularly for hear3,ncr before the Board of Gou-nty
Comuzissionexs.o¢ SApkane Countys Washington, on this dayr anci it aDrAearxng to the
Roarcl that the Spokarae,County:Plann►ing Commissinn has given due notice off the rearing
om t2he rnatter in the manner arid, for the time provided by I,aws t-haY saici Planni.ng Commission has.held a, pubiic'heaa°ing as required; and fihat the said PIan:l.ng k'-"*om-- .
rrds sion concurs in: the- plan to zQ'ne ttae foiiowlxig de scYibed property as ~
AGRYCU.LTIJRAL 3UBURBAN
' , 3ections 16 & 17, Township 25 IV. , Rangd 44, E. W. M Beginn,tnQ at the interaection .
of Miasion Avenue and Woodruff. Rd4d; . thenee ea$~. on Missionr .to Bowd#.sh-,Road; thence -
, . . . _
south on 'Bowdish Road to Nalleywa.y; thence* wast°.on Vall.eyway to Felts. Road; thence
nerth on Felts- Road to Broadwayt4henee: west-,oa Btaadway ta Woodru#f; thence.. narth .
on Woddruftlo point of beginniicig;: EXCEPt t, Tr-~&bts..ll, `Oppoi~tunityr Fi6lc~'s Addttion,
~ Maxwe2ls Subdlvision (Replats'of 3,'raat,l, 2, Opportunity), Tracts 29 and 30, f3pp-
ortumity, and EXCEPT 3`he .EaA1/2.;~f.~Tracfi; S Z, Qpportunlty , ar3d the we st 460 feet
of Tract 51, * OPportunitY: . ALSOEXC, EPT -those, areas- p'reaently. zaned .Agrl.cultural
Subuiban;- hefng. .Clacki s A,dc~f~ioi~,;' ~'i~waxds-'~ubdivxsian; ..G~;ennolive Subdtvi-aion,
Bawdt sh ~ Place 'I st Addttion;, arid ~It~Iick`6S*ub&vi sion #Z , . . .
- . . - . . , . . , . ;
NrJW , TFZREFOREJBE IT RESC)LV£D, that the above de,scxibed property bea a.n'd the saine .
hereby iso zoned under the ciass3ficatlon of .AGRrCUI.TU'RAL SUBUFtBAN
as defined in the Zoning Grdinanca of S olsane Countyo adopted Augast 25, 1553 0 as amendeda t . .
PA"SuED BY THE BC?AR.D TIIIS DAY'',,QF
ATTES'T.:
FRANK J, GLC3VER -
Cl rt- aQ~e }3aard 13OARD OF COUNTY C4lvi.uIISSIC»TERS
P ` . cF sPo~~~ ~~UNixY, ~~=GTON
.Deputy
This is to certify that Ithis i.s a t.ruo and carrect copy of Resolufian
passed by the o d s
day of
Ihes~~ ce~ that I have osted
~ ~ I~ the . - .
above changes and revisions on the ~ . , . ,.~zarizag rnap in the Bui:tdii3g Code- Department,, and do further certify tha~ the zone classii~~ation ' . .
change i, t~`~e same as descs-ibed above anc'~ ;hown .
ora the attached mapo . ~
DJAIT-4 D;
A, d
S I G N~D:
f
I
S P O K A N E . ' o~. . C O U N T Y
OFFICE OF THE COUNTY ENGWEER • A DNISION OF THE PUBLIC WORKS DEPARTMENT
Ronald C. Hormann, P.E., County Engineer Dennis M. Scott, P.E., D'uector
TO: Tom Davis
FROM: Bob Turner DATE: September 25, 1992
SUBJECT: E. 10814 Broadway, Valley Church of The Nazarene
Tom,
The Engineers Department requests that the certificate of occupancy for
the project in question not be issued until the plans show no parking in the
county right of way on Glenn road.
Thank You
Robert Turner
N. 811 Jefferson Spokane, WA 99260-0180 (509) 456-3600 FAX (509) 456-4715 ,
~ OT CE OF TRANSM TTAL
- - - . . ~
. ~ - ~ - - - - - - - - - ~
- - . - - r . - . -
.
, . - ~ ' ~~~~•r` _
. - - . - ~ - - - r~~. . - - ~ - - - - - - -
,
. . , ~ - - - - ~ - - • - ~
-
• . - , . ~ - ~ - - - - - - . - - - - - - • - -
- ~ ~ , - - _ . - - - ~ - " - -•u- . .
, ~ , - - _ - ~ , . - - - , , . - - - - - , _ - - . • . . - - - ` ' '
f~
_ e
ADDF~ESS, PAR*~~_~~`~
- -
• ' ~ - - • ~ .
"
-
~ -
- PR~~JEC~;_~~~-
P~ ~
.
• _ _ - - _
, . .
' ' . • • " ' _ _ _
.
•
~ - . i~. , , _ • _ _ . - , . .
- Y~~
. .
.
.
P.
, , , • -
• 'x
~ ^c±,.
~1 P
. -
. t
r
. ~ _
. . : . . . . , • , - - - - •
.
J~.
- - - , ~ - - - 'r-:r.~, 4 ~
1 4v
- - ' ~ ~ - - - -
: ~ . i i~ 'Y-•_____ _ _ _ _ ~ _ _ _ . .
- _ _ . . - . ~ ~ . ~i"~~ ~if'1. '
f . . ~
. _ }dr•?:' _ ' ~t:Ft'?'-::~~: _ _ _ .?}'i:,=ti--. ' ; t~.
_ _ ~•.4
'
~ - -
~ i ~ ~'~ti'~'~'''• - - ~ ~ i l ~'~'}i ~ -
C'i•~~ _ .':S''~'-'nf-.,._ _ _ _ _ _
" ~ :.,•=-r . _
.•.;C• _ . . , - : ' ' ,r., ti~w. . ~ _ _ ~
- - - ~ -
- - - _ -
,r1~-,
- - r ~ : .
- - _ ~:4•, _ _ ~ 1 - - -`~,~'4`x2kFF~~-~'r' . f L.
h - ~ f
_f.;s,R4 ~~~N E==~~:~~:~
.r.
- - - -
- r::~--:- - - +
v
_ _ _
ti-
1 }
' - . - ~ - - ----~.t'}'~?:,.•.,•,:~„• - . - - :~.Ka."-a+~v--=,-----'_-"_`-'_-"`_,_' + ' - - -
-
~
~ ----:k ~S^:~. - - ,;~}~r:~ - - ifti~};~.ti~~'-'~'.',','.';'
' ' • ' ' ~ ' . . •
~
_____t.~~tid€{\ .t
i~ r v
. ' r'i
..'.Z. -
_ •~4t '.4~ .l~'.'.'~'.'.'~'.'.~ _
. ' . ~ ~ i ..v---v-' ~1~~.. ~
_ • • ~~~r~.,..,.:,... :ti~:
~
, -
i~~ .
_ ..~..1....._ ~ . _
. . ~..~..~.t~ti.~
" '
~ TYPE OF CONFERENCE
Pre-Appaication Pfe-Canstruction Other; DATE:
T! ME:
D~CUMENTS CIRCULATED
aATED REvESED
APPLICATIOiV
SITE PLAN
DRAlNAGE PLAhf ~
LANQSCAPE PLAW I
Other: ~
Qther: ~
ADDITIONAL INFC)RMA►TION
C1RCULATED TO ~ CIRCULATED BY:= u DAM
SCAPCA-M. Caine Uti[ities ~
U[nogin edlin d Fire Disirict # .
` Hea tWffijstrIt Liber#y Lake Sewe Questions? Cantact Jeff Forry or;
PlannEng O#her:
Spakane Caunty
D11fI5C0N OF BUILD1NGS
West 1303 Braadway Spokane, wA 99260
(509) 456-3675 (affice) or (509) 456-4703 {fax}
Pacific Architecture Corbin Mansion
Engineering Marycliff Center
Design Planning West 815 7th Avenue
. Interior Oesign Spokane, Washington 99204
Group, P.S. Environmental Assessment 509/624-1186
R E C GI VGQ
July 29, 1991 AUG 5 1991
Spokane County Department of Building BUItDlNC 8 SAFETY
West 1303 Broadway
Spokane, Washington 99260
ATTN: Mr. Tom Davis
RE: Spokane Vailey Church of the Nazarene
, East 10814 Broadway Avenue
,
Dear Mr. Davis:
After thorough review of the comments generated for the above-referenced project and received by
our office on June 19, 1991, the following responses are being transmitted:
i. Planning Department (456-2205)
A. Discussion/Requirements
1. The proposed is located in a UR3.5 zone.
2. Please submit a revised site plan illustrating the use and square foot of each
story.
3. No additional landscaping is required.
4. Additional parking may be required for the change of use from a garage to
teen center.
5. The three involved parcels need to be aggregated into one parcel of land
through certificaie of exemptions.
B. Permit Release Requirements '
1. Please submit a revised site plan as described above for review and approval.
Response: An amended Site Plan, Sheet A100, has been attached indicating the
square footage and use of each level of the addition. In addition, new parking has
beeo indicated for the existiog teea center as well as for the parkiog lost in the
reconfiguration of the existing parking to meet code.
2. Certificates of exemptions to aggregate the three involved parcels shall be
obtained. Response: The owner has subsequently submitted a Certificate of Exemption for the
parcels in question.
II. Division of Engineering & Roads (456-3600) A. Discussion/Requirements
1. Comments were given to the applicant and the Division of Buildings by Bob
Turner.
2. Please submit a drainage plan for any new hard surfaced areas that is in
compliance with Spokane County Guidelines for Stormwater Management.
~
Mr. Tom Uavis
July 29, 1991
Page 2
3. The proposed will have a composition roof therefore, atl roof drainage must
be directed to 208 drainage swales.
4. County code stipulates that it is not permissible to back onto the public right
of way, -therefore, the 10 parking stalls abutting Glenn Road shall be
abandoned. Curb stops shall be placed along the road to delineate ingress and
egress.
S. All new traveled surfaces are required to be paved.
~ 6. An Agreement to Pay Fees was given to the applicant during the meeting. The
agreement is to be signed by the owner and returned to the Division of
Engineering & Roads. Plan review will not be completed until this document
is executed. .
B. Permit Release Requirements
1. Please submit a drainage plan as described above for review and approval.
Response: A revised Site Plan, Sheet A100, has been attached showing drainage of
new parking surfaces and location and detail for new 208 drain swale.
2. The parking problem along Glenn Road shall be corrected prior to permit
issuance.
Response: Also included on the above mentioned Site Plao is a new parking layout
showing the new striping on the existing paved parking area and, also, the new layout
for the newly paved area. Existing paved parking = 49 spaces
New paved parking = 65 spaces
3. Please submit a copy of the Agreement to Pay Fees signed by the Owner.
Response: It is my understanding that the Agreement to Pay Fees was signed at the
Pre-Construction Meeting. Please cootact me if this Is not the case.
III. Health District (456-6040) A. Discussion/Requireinents .
1. There are a series of on site sewage disposal systems located on the property.
Please submit a revised site plan illustrating the disposal systems to verify that
the proposed addition does not conflict with the disposal systems.
2. The applicant stated that there would be no changes to the existing kitchen and
that the classes would be used for religious instruction only.
3. The water purveyor for the proposed is Modern Electric Water Co. (456-
8000). Please contact the water purveyor to review requirements for back flow
preventors.
,
Mr. Tom Davis
July 29, 1991
Page 3
B. Permit Release Requirements
1. The Health District will release their portion of the building permit once
verification has been submitted that the proposed addition will not conflict
with existing on site sewage disposal systems.
Response: It is my uuderstanding that the only site sewage disposal system of
concern is the one located along the west side of the existing buildiog. We have been
informed by Mr. Daryl Way of the Spokane County Health District that the septic
system in this area is located approximately 60 feet from the aorth edge of the
j existing buildiag. Our addition is located approximately 82'-0" from this same face
which is 20'-0"± from the septic system.
IV. Fire District No. 1(928-2462)
A. Discussion/Requirements
1. If the three subject parcels are aggregated the fire flow for the site will be
2,500 g.p.m. Two fire hydrants are required to meet the minimum fire flow.
The existing fire hydrant No. 1743 is adequate. The old hydrant located across
the street from the proposed needs to be changed from a two port hydrant to
a three port hydrant, or install a new hydrant on the property.
2. If the applicant decides to install a new fire hydrant it shall be installed as per
an approved water plan. The water plan shall contain the location of the
hydrant, hydrant assembly detail, and plumbing detail. The water plan shall
be submitted to the fire district and water purveyor for approval prior to
installation.
3. A lock (Knox) box entry system for fire department personnel access is
required to be installed. Forms for ordering was given to the applicant. The
completed forms are to be returned to the fire district.
V. Division of Buildings (456-3675)
A. Discussion/Requirements 1. Plan review has been completed on preliminary plans and a letter was sent to
the applicant by Tom Postlewait.
2. A change of use permit and certificate of occupancy shall be obtained for the
teen center. .
3. The three involved parcels shall be aggregated into one parcel.
4. The basement is over 1,500 square feet and therefore may need to be
sprinkled. Tom Postlewait stated that he would like to further discuss this
matter with the fire district and get back to the applicant.
5. Please submit a critical materials list to the Division of Buildings for review.
6. If construction specifications require concrete with a design strength over
2,500 p.s.i., high strength bolting, or structural welding special inspections will
be required on the proposed. Please indicated the name of the testing
laboratory and submit copies of the inspection reports to the Division of
Buildings for review.
Mr. Tom Davis
Juty 29, 1991
Page 4
B. Permit Release Requirements
1. Two complete revised sets of plans addressing the items discussed during the
meeting and other items from the plan review letter needs to be submitted for
review and approval.
Response: Please refer to responses following letter from Mr. Tom Postlewait.
If, after your careful review, you have any questions or comments, please do not hesitate to contact
, me so that a clarification can be made.
' Your help and cooperation to work with our firm is sincerely appreciated.
Sincerely,
>
William A. Froemke, A.I.A.
PACIFIC DESIGN GROUP, P.S.
Enclosure
cc: Bob Luhn
Joe Bozo
.
ATTACHMENT 1
Comments fram;
Dffice of the County Engineer
RE: Spakane Valley Church of the Nazarene
East 10814 Broadway Avenue
After thorvugh review of the comments generaked ior the above-referenced pro ject and rece ived by
our of fice on June 19, 1991, the foilnwing responses are being transmitted:
A} A drainage plan for an}r new a~pha1t surfacjng and for the new roof if it is of asphaltic
composition or Supports a HVAC uni# (If the raaf is non-asphaltic it can be drained
' directly into a drywell). The site drainage snall in compliance wi#h Spokane Coun#y
"CuideYines far 5tormvvater Management". At a minimurn the plan must contain.
1. I]rainage calculations for stormwater volumes generated
on site.
2. Calculations for total irnpervious surfaces contained
ur,ithin the site.
3. Finished grade elevations for structures to be
eonstructed orr si#e.
4. Finished grade elevatians at- the top and bottom ❑f the
20$ swaie.
5. At}rpical cross section of the 208 swale.
6. Calcuiations to jus#ify the nuxnber and type of drywells
proposed_
7. E,leuation of drywell s"n1ets where appiicable.
Respanse for Items 1-7; P1ease refer #o the new Site Plara, Sheet A1UD, with #he
requested information shawn,
)3} Insufficient information was submitted with the prvposal. We are unable ta prdceed
with our review. We will need the fnllowing be£ore we can proceed:
Site Plan.
2. Drainage plan as specified.
3. Other informa#ian:
The current parking arrangement is nat in compliance
with County code. It is not permissible to back out
anta the Count}r right af way. Therefore, the 10 most
easterly parking stalls shall be abandvned and physical
restrictions, such as conerete bumper curbs, shall be
p1aced on Clen Road parallel to the right of way.
Parallel paFking on Glen Road is sti1I permissibie. A
revised site qlan shall be submitted ta reflect this
change.
Response for I#ems #1-3: An amended Site Plan, Sheet AIUO, has been attached
rvith the requested inforrnstion. Also included oa the Drawing is arevised parking
layout indicating direction nf drainage for the newly paved surfaces.
r
•
ATTACHMENT 1
PAGE 2
C) Utility condition: Permittee is responsible for arranging for all necessary utility
adjustments or relocation as required for completion of the improvement.
Response: We understand that any utilities that need to be relocated shall be the
responsibility of the permittee. The Drawings indicate the relocation of an existing
gas meter and two HVAC condensing units. To the best of our knowledge, no other
utilities should be impacted by the construction of the proposed addition.
D) The owner of the property or the authorized representative must complete and sign
Spokane County Engineers "Agreement to Pay Fees". This document must be
returned to the County Engineers Office. Plan review will not be completed until
• this document is executed. This document is attached to these comments. Please
return the completed Agreement to your contact person at the Engineers Department.
" Response: It is my understaading that this form was signed by the owner and
returned to the appropriate party at the Pre-Construction meeting held on June 19,
1991. If this is not the case, please contact our office immediately so we can
proceed with the necessary paperwork.
~
. ~
~r
;
S P O K A P4 E • C O U N T Y
DEPARTMENT OF BUILDINGS • A DIVIS[ON OF THE 1'UBLIC WORKS UEI'ARTMENT
JAV1ES L. Mr1NSON, C.B.O., DiRECTOR DENNIS M. SCOTT, P.E., DIRECTOR
dUN 1991
~
0
I
TO: Lorne Lakshas, Planning Department ~~~~i~`~+tl~ ~;v~~E:,;~€~
Tom Postlewait, Division of Buildings
Bob Turner, Division of Engineering & Roads
Daryl Way, Health District
Clyde Wisenor, Fire District No. 1
_ I . 1
FROM; om Davis, Code Compliance Coordinator
Division of Buildings
DATE: June 19, 1991
RE: June 19, 1991 Pre-Construction Conference
East 10814 Broadway Avenue /
Enclosed is your copy of the minutes to the referenced meeting.
Should you have any questions or need additional information, please
f eel f ree to contact me.
TLD:rmd
cc: Mr. Dave Cox, Valley Church of Nazarene
Mr. Bill Froemke, Pacific Design Group
Mr. Bob Lishn, Valley Church of Nazarene
Ms. Mabel Caine, Air Pollution Control Authority
Mr. Dennis Scott, Public Works Department
CODE ENFORCEMENT DIVI5ION
4VEST 1303 BROADWAY 0 SPOKANE, WASHINGTON 99260-0.550 0 (300) 456-3675
FAX (509) 456-4703
MINiJTEB
PRE-CONSTRUCTION CONFERENCE
EAST 10814 BROADWAY AVENi1E
NIIRSERY ADDZTION - VALLEY NAZARENE CHIIRCH
JUNE 19, 1991
CALL TO ORDER: The meeting was called to order at approximately
11:00 a.m. by the Division of Buildings Code Compliance Coordinator,
Tom Davis, with the following in attendance.
PERMIT REVIEW PARTICIPANTB:
Lorne Lakshas, Planning Department
Robin Domitrovich, Division of Buildings
Tom Postlewait, Division of Buildings
Bob Turner, Division of Engineering & Roads
Daryl, Way, Health District ,r
Clyde Wisenor, Fire District No. 1 ~
APPLICANTS: Dave Cox, Valley Church of the Nazarene, E. 10814 Broadway Ave
Spokane, WA 99204 (509) 926-1545
Bill Froemke, Pacific Design Group P.S., W. 815 7th Ave
Spokane, WA 99204 (509) 624-1186
Bob Lishn, Valley Church of the Nazarene, W. 7022 Hallett Rd
Spokane, WA 99204 (509) 747-6252
SCOPElPROJECT DESCRIPTION:
I. General Overview - The owner Spokane Valley Nazarene Church is
proposing the construction of a 1,440 square foot nursery addition
to Valley Nazarene Church. The proposed addition will be two
stories with a basement. The top story will be used for the
instruction af Sunday School and storage, the main f loor will be
used as a nursery, and the basement will be used as a fellowship
hall.
II. Please Note: There is a garage located on the adjacent parcel
(East 10810 Broadway Avenue) belonging to the church that is being
used as a teen center. The Division Buildings have no record of a
permit for the change in use being obtained. A permit for the
change in use along with a certificate of occupancy shall be
obtained for the teen center.
- 1 -
SUMMARY OF DEPARTMENTAL REnUIREMENTB:
I. Planning Department (456-2205)
A. Discussion/Requirements
1. The proposed is located in a UR3.5 zone.
2. Please submit a revised site plan illustrating the use
and square foot of each story.
3. No additional landscaping is required.
4. Additional parking may be required for the change of
use f rom a garage to teen cer.ter.
.
5. The three involved parcels need to be aggregated into
one parcel of land through certif icate of exemptions ._e
~
B. Permit Release Requirements
1. Please submit a revised site plan as described above
for review and approval.
2. Certif icates of exemptions to aggregate the three
involved parcels shall be obtained.
II. Division of Engineering & Roads (456-3600)
A. Discussion/Requirement
1. Comments were given to the applicant and the Division
of Buildings by Bob Turner.
2. Please submit a drainage plan for any new hard
surfaced areas that is in compliance with Spokane County
Guidelines for Stormwater Management.
3. The proposed will have a composition roof therefore,
all roof drainage must be directed to 208 drainage swales.
4. County Code stipulates that it is not permissible to
back onto the public right of way, therefore, the 10
parking stalls abutting Glenn Road shall be abandoned.
Curb stops shall be placed along the road to delineate
ingress and egress.
5. All new traveled surfaces are required to be paved.
- 2 -
l
6. An Agreement to Pay Fees was given to the applicant
during the meeting. The agreement is to be signed by the
owner and returned to the Division of Engineering & Roads.
Plan review will not be completed until this document is
executed.
B. Permit Release Requirements
1. Please submit a drainage plan as described above for
review and approval.
2. The parking problem along Glenn Road shall be
corrected prior to permit issuance.
3. Please submit a copy of the P_greement to Pay Fees
signed by the owner.
III. Health District (456-6040) _C
~
A. Discussion/Requirements
1. There are a series of on site sewage disposal systems
located on the property. Please submit a revised site
plan illustrating the disposal systems to verify that the
proposed addition does not conflict with the disposal
systems.
2. The applicant stated that there would be no changes to
the existing kitchen and that the classes would be used
for religious instruction only.
3. The water purveyor for the proposed is Modern Electric
Water Co. (456-8000). Please contact the water purveyor to
review requirements for back flow preventers.
B. Permit Release Requirements
1. The Health District will release their portion of the
building permit once verification has been submitted that
the proposed addition will not conflict with the existing
on site sewage disposal systems.
IV. Fire District No. 1(928-2462)
A. Discussion/Requirements
1. If the three subject parcels are aggregated the f ire
f low for the site will be 2,500 g.p.m. Two f ire hydrants
are required to meet the minimum fire flow. The existing
- 3 -
•
f ire hydrant No. 17 4 3 is adequate. The o ld hydrant
located across the street from the proposed needs to be
changed from a two port hydrant to a three port hydrant,
or install a new hydrant on the property.
2. If the applicant decides to install a new fire hydrant
it shall be installed as per an approved water glan. The
water plan shall contain the location of the hydrant,
hydrant assembly detail, and plumbing detail. The water
plan shall be submitted to the fire district and water
purveyor for approval prior to installation.
3. A lock (Knox) box entry system for f ire department
personnel access is required to be installed. Forms for
ordering was given to the applicant. The completed forms
are to be returned to the fire district.
V. Division of Buildings (456-3675)
_c
t
A. Discussion/Requirements
1. Plan review has been completed on preliminary plans
and a letter was sent to the applicant by Tom Postlewait.
2. A change of use permit and certificate of occupancy
shall be obtained for the teen center.
3. The three involved parcels shall be aggregated into
one parcel.
4. The basement is over 1,500 square feet and therefore
may need to be sprinkled. Tom Postlewait stated that he
would like to further discuss this matter with the f ire
district and get back to the applicant.
5. Please submit a critical materials list to the Division
of Buildings for review.
6. If construction specifications require concrete_with a
design strength over 2,500 p.s.i., high strength bolting,
or structural welding special inspections will be required
on the proposed. Please indicate the name of the testing
laboratory and submit copies of the inspection reports to
the Division of Buildings for review.
B. Permit Release Requirements
1. Two complete revised sets of plans addressing the
items discussed during the meeting and other items from
- 4 -
l
r
the plan review letter needs to be submitted for review
and approval.
APPLICANT'S COMMENTS/ACRNOWLEDGEMENT:
The applicant acknowledged that all comments/requirements were
understood and had no further questions at this time regarding
permit requirements.
CORRECTIONB:
To minutes or changes from what appears in the minutes, we should be
notified within one day of your receipt of these minutes.
To site plans as required by any or all of the above-listed
departments shall be submitted to the Division of Buildings who will
then distribute accordingly to those departments.
_t
ADJOIIRNMENT: There being no further business, Tom Davis thanked the applicant and the departments for their participation and reminded
all that he should be contacted if there are any unforeseen problems
which may arise.
The meeting was adjourned at approximately 11:35 a.m.
Copies of Minutes to: Al1 participants
File - East 10814 Broadway Avenue
Nursery Addition - Valley Nazarene
Church
NOTE TO APPLICANT: Some time ago the County recognized the need to
streamline the building permit system and accordingly initiated
these Pre-Construction Conferences. Comments so far would indicate
these conferences are successful and do enhance the permit system.
As a recent participant, we would appreciate any comments you might
have to further improve the process or, should you have any
questions or concerns regarding your conference, please contact
either Jim Manson, Division of Buildings Director, at 456-3675 or
Dennis Scott, Public Works Director, at 456-3600.
Sincerely,
James L. Manson, Director
- 5 -
\
SP 'NE COUNTY DEPARTMENT OF B~:DINGS
~
• W. 1303 BROADWAY AVENUE
SPOKANE, WASHINGTON 99260 ~N • ~ ~ ~ • (509) 456-3675 - ~
I certify that I have examined this permiVapplication, state that the information contained in it and submitted by me or my agent to compile said permiVappticetion is true '
and correct, and euthorize Spokane County to proceed with processing. In addition, I have read and understand the INSPECTION REQUIREMENTS/NOTICE
provisions included herein and agrea to comply with same. All provisions of laws and ordinances governing this type of work will be complied with whether specified
herein or not. I understand that the issuance of this permiVapplication and any subsequent inspection approvals or Certificates of Occupancy shall not be construed to
give authority to violate orcancel the provisions of any state or local law regulating construction, or as a warranty of conformance with the provisions oi any state or local •
laws regulating construction.
SIGNATURE OF APPLICATION - - '-~y
OWNER OR AGENT ' DATE ~ ~ ~ ~ ~ ~
19 "1 '•.-!2 i-e) N r,~ .
E; • SEP 41992
V"'ooTY ~6~EER ' •
.
I'1~.'C,.f~::f.:~' ~lUMk~E:Fi= 91 n~7 a;??~? F~F'!~`1...:1:(:'f~~'l:Q~t D F'1"F-:. 7ow)/i ~/~i F'~~E~ ni
'T'HTS :I:.S Nt1T A PFRMIY
I~•'~:t~~'~I...rI[=.S W:~l_ ~:iE HS,SI`:,S'~:C'D _!~'f.l~~'CO~ir~Ei~lC:1~t~C~l~(:li'ti'K~W]jTFit:IIJT~r1MF'EF~'tiT.T____~~~.~. ,
_ f
~.S':CTE~ 1'f~iF.::~~~f 081 4 F:: F.+F:Q~'~I?~JF11►' ~^~4'f° !'f1fiCFH:I. /l,- i ~~c43°0155
ADDRffS,S= ,SFnKANE WA 99206 •
PI.:RHYT !JSE= NlJk'aERY ADC?xT.T.ON UNTf.l VAI...I...EY NA.i ARF /F CHl.lRCH .
i=` I._ AT -4: = t? a18135 PI-fa T NAMN: = OPN.T-R.1 5si /
' N L Q C K= E_ 0 1' 7Q NE== R 3. 5 D 1..5' T;
Af~~:H•~= 0C~Q0wJG0 i~'i f=' GJIDT~1=~ 10 TE F'Ti•4300 Rr W•-= 40
nF BL.DGS= i ti~ D WE- L.{_.7:N C;aS'm. WATEFt' D:CET ~
OGJNF:"R~-, S1='f71<Ai'!F' VAi...l_E Y NA:'_rafiiENE (:I-II.JIRC'I-i F'HC'Ni=.= 509 926 1545 '
,STkEET'=- 10814 E rqRClAbWAY AVI:' .
FanDRE5S-:: .S'Pf1KANE WA 99206
`'GA'~t , •9•-7 ro,~ire a ~ry
~ ~ / ~~11.. ""l~ ~ ~ ~.l
ON1 ACT 1 { r"1 ~ 1E~° ~ ~ ♦J 47 L) A N~~, 1 ~~E,\=
x{l_JI _D.T.NG .SETBArKS• FFtClN7= Na1 L E- i='T-: NA R HT=-- N A R FFaR::. hlA '
A3 8~~~sc VNFiE::4'T.EW INFQ ►AT1C' 4 ~~~~~•~x~~~yf~i•~~~~~~~~~a~•~•~~~~~
Xif•:F'ARTirfENT F'tE11IE.W f.:fJMMl"n-.NTs F'tl~ 'f•.,.V A L.. f.:QM M E- N'TS"
n.. w. _ ~ _ ~ _ _ M
I;U:I:I...U:CN G f'I...AN REV:tEW 11i=.f41l:CREn . ._.r..~.... i.W..,.✓~~........_.__
:i { E.17: E,_ I) IN G .S' E"f BAC; k Ni E: VIE:: W Pf= QU x C'.C? I'i .
. ~
BU1: i_ D:I NG E- N F Fi CX Y I°' I._ A N> R i: :1! 1 f ~ ~W ' fi" QlJ IR.. D ~ _ w
.8/~L9i
r~~lr~~ .r. N ~:r::r~ s~I~~c: n~~F~, x NAc~~: ~r~~ r~f. ~~EV.w~:n ~ _ .
!•i : r i..'" f~1D 7: s"~' ~fE W Cl1R r~nL~:~'~':Ef]i'~!~'3l_.'W~a,CT~' WF1'T(=f~
I~ .1
r
I~~°l.. r•`l ~l ~1.7~lG 9 ITF F'E.. A ~d F~~:br?~~i~i1 Fi ~::Q l!' ~;E:: AdZeL`a- F:, r~ I'--. ~ 19 T R h 1: f~ F_. t~ l._ Cll~! T O B i~ ir'~~ _ W r~ D _.l~t.~~~~.. . _ .
. ~ ~~~tr6M
ii' '1r '~l 3Y yl ~ 'fC ~L ~ ~L af• ~ ~ ~fi }t ~l 3'N 9t ~ ~N ~ K ~t' ~L ~ 'Yl ~i ii• ' .0.) ILDING F'' ER'M7 Y ~ a • ~ 9i. . .?i ~i~ 3~} ~r • ~h ~i• ~ . . ~ ~i •~E ~i
, ~
CONTI°i(aC:TtaR= UAfk:l'd(.7WN f" HiN E"~.:
aI'FEE:F"T=: UNKNQWN
F1DD~'~ESS'= IJNK NOWN W44 lJNlt N,. IjJN
.
NEW•-: F'F~SQDE w11~1>J:Y1C1N~; CNAi~G~' C)i~" l.(`>~~::-~
DWfM_L l.lP~:tT,S= CICr ..L1{°'. L.ICi;:. B l...Dt'.~ HG7 40 ,>TflR ;i:l":,STM
D L. D G W k D :a 6 ; X i~ S"Q T 1440 t> F.' Ft .T. t! K l_. k' E1: N .
R 1:7- t; F'A Fti44 i.N G ~I~ It/A F''i N l~~;r1i°'::.. -t Zt;f~:['r.T.(..~f~t_ r~~~T =~f
~l1 ~t'i ~ I
DEScr-,rPT1ON cY1-~' - ur~~ ..t~Y F'I'-- <<~Q r.._~' VAi..UAT:tON
r_:i.. Ass~cOnt~ .2 v J44c~ 6 0 . 0 ~ ,
~C~t~irsnEr[~'~`~ti• ._2 1440 63360.00
[)p/~~.7 i71~Fy~~ 1"1l./ .V I., 2 i 7"
~ ~ 1~ 0wt/Q
~Np F~..aai~ /B~-.~ V ~O ~6 8 a 29920. 00
:I: TEM, nESch 15;TION QU~NTa: rY FEE AMOUNT
70. 50
t:;QM~'fC~'iC:~~t.. ~~lr-it.G!P1TTC~tl....~...._..~._ ~,.Y....
.
Pi_. AN REVT t" W F' E . Y 565.83
,~T~1TE ~StJ~iC?'F~AF~'Crf` `r' 4.50 .
C-tJl1NTY Sl.1kCHORGE Y 1139.28
ENGINEE: hS h EV1: E" W y 50.00
~
. ~
Few-MITI; AO~~ -AVMO . ;
J.~
{~IP
. ~ , . . ~
,
r ~ Page 1
/
OFFICE OF THE COUNTY ENGINEER
SPORANE COUNTY, WASHINGTON
~ Project: Nursery Addition to Nazarene Church Date 6-19-91
~ Address: E. 10814 Broadway
Parcel No: 16543-0155 Ref No. B91048
The,County Engineering Department has completed a review of
the above referenced project. The following information must be
provided in order for us to proceed with our review.
A) A drainage plan for any new asphalt surfacing and for
the new roof if it is of asphaltic composition or
supports a HVAC unit (I-f--t-rrt- reerf 14-ea-ft
_ The site drainage
shall in compliance with Spokane County "Guidelines for
~ Stormwater Management". At a minimum the plan must
, contain:
~ 1. Drainaqe calculations for stormwater volumes
~ generated on site.
2. Calculations for total impervious surfaces
contained within the site.
3. Finished grade elevations for structures to be
constructed on site.
4. Finished grade elevations at the top and bottom of
the 208 swale.
5. A typical cross section of the 208 swale.
6. Calculations to justify the number and type of
drywells proposed.
7. Elevation of drywell inlets where applicable.
B) Insufficient information was submitted with the proposalo
We are unable to proceed with our review. We will need
the following before we can proceed:
1. Site Plan.
2. Drainage plan as specified.
3. Other information:
a. The current parking arrangement is not in
compliance with County code. It is not
0permissible to back out into the County right
of way. Therefore, the 10 most easterly parking
l~ stalls shall be abandoned and physical
restrictions, such as concrete bumper curbs,
~ shall be placed on Glen Rd. parallel to the
right of way. Parallel parking on Glen Rd. is
^ still permissible. A revised site plan shall be
submitted to reflect this change.
`
C) Utility Condition: Permittee is responsible for arranging
for all necessary utility adjustments or relocation as
required for completion of the improvement.
/
Page 2
D) The awner of the praperty or the authorized
representative must complete-and sign Spokane County
Engineers "Agreement to Pay Fees'R. This document must be
returned tv the County Engineers office. Flan review will
nat be completed until this document is executed. This
docume,nt is attached to these comrnents. Please return
the completed Agreement to your contact person at the
Engineers aepartrnent.
Only after alI the informatian and requirernents listed abave
are supplied or campleted and the necessary reuiew has been
accomplished will your building permit be released.
Your contact persan at the County Engineering Department may
be contacted at 456-3600. Your contact person is Robert Turner.
_ . . . . . . _ . . . . i , . - ' ~ - - - - . . ,
,
,
~
. , . , , , . - ~ _ - ~ ~ ~ - - • - - •
,
, _ _ . . - - ~ ~ =_e~. , . _ f-- - . . . . . - - , . . . . . . . ~ - - ~ -
. _ , . , : + , - _....y._ 4..._...~_ ~ . l-f-- • . f . ; . . . , . . . . . . - - - ; - . . . ~ -
, , . , . S, . _ , r~-• - . ~ . . . . , . . ~ ~ . , , . . , . . ~ ,
.
.
' 2,~ _ r_
_ , . . . . _ ~ . . . ..i ~ i I - ..I.. . . . . . . ; , . , . , - - •
.
~
~ - ~ I
. ~ _ . . , . . . . . . . .
- _ - - - - - - - - - - - - ~ -
, ~ , , • ,
I
,
~ ~ I II j ~ ~ ~ ; , , • ,
L ~ . , ' ' ~ ~ I - - ~ - ~ I •
- . • ~ _ ' _ . . - - - • . , - ,
. ,
' '+.F ~~~yl ~ ~ " - '__~'-"1_ __..I_ . ~ _ . . . G ' ' ~ _ "L , . " " ~ . . . , - _ '
_ _ ~N ~ I I
. - i}~~~~ a 1 ~ I r-~ ~ ~ --~~_.~..___.._._I.__ I * i- - ~ ~ ~ i - - ~ - - l I _ _I _ .I._~ . ,
~ , - - - - - ( i , , , ; ~ ; ; ~ ~
' _ _ ' ~ _ . i.. . ~ i ~ - - - - . L - - ~ - ~ - ~ - - - - - - - - ~ ~ - - - - - - - ~
. . . . . . ~ =z~ ~_-~~s.~.~~m~.-7 m-~-- ~ - ~ . - . . . . ~ ~ . , , ---i--
. _ ~ . ~ ~ ~ F ~ . . . _ _ a._a_.rl . ~ I . I.- • • ' 1 ' ~ ~ f ~
r' " • I _-~'s_~_ ..,I~-r-- I - - ' ! ' . . _ - ~ --I I----•
. . _ - - i , ~~~~f6~V-' ~ ~ i • - . ~ ~
i.-
-
I ~ ~ ~ ~ _,I i . ! - ~ . ~ - i'---' `I
. y. . i , . , k..- ` I"' '"_"T^r L I ---i---- ; ; ----~---~----'~.w~` i ' p - I ' ~ ~ . ..I J; . . J. E....
~ • ; - - ~ r . . l _ --~---,---I----. ~ . . . - ~ ~ - ~ - ~ _ . ~
, ~ ' ~ i i i i •
- I ; , - , . ; . . . _ . . . . . . . . , . . _ .
. ~P ~ ~ ~ / r ~ -f -y i _,....___.-I • I . • ' • - - ~ - - - I- I , . . , . . , . , , . , - - - ~ , ~ .
~ ~ i • I
. . , , . r _ - ~ _ . . - . , . - • - - - - ~ . . . . .
_ _ • .
. . . I i - -I- -I ~ I i ~ ~ ~ I , ~ I ,
, , _ ~ , . . ~ ' .~_..1 i---i ~ ~ ~ - ~ • - ' ' ' - ' ~ , . , ,
- . . . , 1 j , ~ , ,
~
- -,•----=-i- I - ~ •
f I I
~
- ~ - ~ - i f , I ~ • , • : , ~ . . . . , . . , . .
; ~ ~ , ' ,
~
CHANGE-OIIT EXG. 3-P0RT F1RF- • .
WTDRl~t~JTd 9-PORT CA2ADLj-[T'Y y PACIRC DESIGN GROLP P,S
WEST 835 M A
VE- .
SPOKANE, WA 99204
(509) 624-'IlM
" . " 66B
- . . ~ • . ' ~ 4G~00
' ' ' , ' ~GQnok
. - 448GQ
. .
' . , . ,
, ' r, i , , . • . . .
' . _ _ + . ! . , • ' • .
. 1 , . . . . e , " .
` ` , _ ~ ' . I , , • ' ' , ~ , ' ' ' ~ ,
_ . • Q . ' .I . ' . ' " ' . i -
P.P. ~ . . , . . . ^ . + ' . ` . , . -
r . • ~ , , . , . . ~ . . . . . _ , , PROJECT; .
, , , ~ . . .i . . . .
. , . ' ~ . I ~ . APPRo Ir~ ~Da~~lo~ ~
~ ATF SQ. F~C~TAC E
~ . . , . .
I
SPOKANE
I , L.OWEf2 L.F-VEI... 1440 5G1 FT. ADOMUh4 TO FELLaWSHIg HAI...L
MAfN L..EVEL: 1-440 SQ. Ff'. NtJRSERY iZ00M AI701'f1QM VALLEY
,
I ~
. - ~ UPPF-R L-FVl=-L• 14-40 SQ FT. 5lJI'iI]AY SGHOOL CL4,5SR00M
ANp 5taRAGE ROOM AEDD1790h{
i
- - - ~ ~rc~-r~.~ ADamar~~ 4 3zr~ s
. , - , ~ Q F-r.
.
[-x1sTIMG H/c , E. 10$14 BRAODWAY
~
taaMP 7-0 FZF-MnIt~ ~ SPOKANE, WR 99216
A~
~ - ~~~~~~GF- CALCUL+~~~(DN&
accESSBLF- °
.
. RoUTE aF ! . '
I
fiRAVEL. 135CXD 84 FT. N~.W A-5PHAL7 PARkINC''
.
I
150CD 5W. FT. TiEW ASPNALT CCMP. ROOFih4G
- . - - . - - W.J_; _ 46000 SQ. F=-r. 7Q7,4~ 1MpERVi~US Sk~F
- - . _ ~ - - • - - i~ AGE _
f I ; .
9500o 7[ 0.5 . .
, _ , • ( ~ ~
,l ~r~ 5.~ ' E • ,~2 . 525 GU. FT.
i,~:~ ~ ' • ~ • ~ . , •
t•~ ~~:u I , .
4.r~"ar.` .~.e i PROVDE 50' X fiC' TRIAMGUI.AR SWALF f=Q32 625
CU. F;T.
CAPA,GITT' 4JTTW TYPE 6 DR7LJELL.
A •l R+„ Y i , ; ~
a Y ti af •
" , . : •
. ' ' .
, . , ' . . . . . ' f~
~ ~ . • ' TO
. - , ~ • . e~, au. corort'°~lSa~.s w-w
~ . ~ ~oa. ~ ALL ca~
~o
. " S 5{~. Pl-~ ~ • T ~~vp.t-E. . • p~t~F~ . N ~ ~
f7RA~
wo~ ~
Y/ C 0sn'"(
r, ~ , , t , • 4 R~O~~•• " 0~. vaE si' ~
b~~ P~ ~ C~
oQT
i
` N
• ' . ' , : . _ _9`~ .
~c5y1 ' • ' . ~ e pATe
s
oe:T~a., gY'
. ~
~ , s~ doWs
OT~
.
0 ~ A7r ~
.
, ~ . ~
. V~
s~
~ .
GOL
. ~
~ qU
. u 8 , . SVI~p`
. a. .
. ~ ~
. ~ GA .
. ~ pS .
. ~ ,
A400 p,1ao
. . . , ti . ~ ,
.r , C .
~ , .
, . pLA
' . ► ~ , . , ~ 511-F .
ac . . ~ . ~ .
, , 'f ' • 11 . ,
. . ~ . 1 ~
. . ' • ...r . ` + . ~ . ` . .
. , . . ' . ~ . , . . .
, . ~ ~ . .
. ~ ~ . .
OJA ' '
RINTED
5r~.
P 1~ ~992
SE
t~
~ R
tri P~P p.S.s~ca
r~
`
I
i
l ~
1 . .
• . . r. +r~~ w+~i.r.~~ ~ ' r e..v~.i~ . ~ , . r,~n
gROADWAY ~ .
. AVENUE ~
. ~ I . ~ . ' . • . , ' ` ~ ~ ' . .
• . , . , ~ " ~ • ' . - ~ . _ ~
~ ' ~ ' ~ . .i • . ~ , • , ~
, ' , . ' . . ~ ^ ' . ~ ~ • . ~ ~ .
' , ~ , ' ' ' ~ , , . ' • ` ~ . ' . . ~ ~ '
• , , . • . . . , - . . ~ • , ' . . '
7C
• , ~ ~ .
, . ~
~ I . . . :y---- ~
~
. . I ,
• ~ ~ ~
~
. t
1EXISTING CHURCH ADM1P , r
I OFFiCE BU1LDi1`IG
,
~
- (
,
I ~
. , m' 1
. , - . . ~ ; • - - { - ~ .
. I i .
~-W EXiSTIMG BUILDIP
. : . • ' ~ . ~
. ~ .
. , . i~ .
' . Z:
Iull]
• . , . . W , ~ , , ' ~ ! ' . • ' . 02110M
, r ~ • ' 1- , ~ ~ ~ ~ ~
, _ . , , . , ~
. .er;;;.~ ~ , • , , . ~ . ' ~ , ' , ~ ' ' , , . ' i- • : • ,i : i . ~ 02t10 R
' ` ~ . ~ ~ , •
7
' ~ ; ~ - a . - ' 1~: - . . ' , • ' ' , , .i,~ ~ . - ~ ' 1 I , .r _ , ~r~ / ` I~ .
~5 ' " _ ~ ' . ~1 , . _ ~ ~ . ♦ ~ ^ ~'1 ~.•'7~ y _ ' ~ ~ ✓ Y' yfl r J' . . ;
~ ""4 ~ . . • ~ ..J~ ~4 y~~~ .I }~°y .{-,~r,~,
U,
. ' ~ ' ~ ~ - . ~ ' . , • ~ . , ' }~,r:s`~ ~~r~~~~:~.; ° ~ ~ '~Fx ~ ~ _ : i
/y~}`~' ~it~f f• 9Y /~`'f w '~4- `,4f5
- 'I , . , . i ~ , i , ' J 4 'L4 ti ~ ~ I F_i~~ ~ 1 ~r~ ~ • ` y ~ ~ . ~~F
~ . ~ . , ,I~'~v°i:~:. , !sr.r~~_ ~ r_- • - ~r ~ ~ ~
, . . 4 , 'T}~~~w„ '.•y - , f, .
,
, . - , , - ~ ~ , r• ' Crtfl6 F . °
.a. k I
rr ~~A u
~ 1 " ~ , ~ . . . ` ~~.a~ ~ ' ' ~ r + 1" = ~ . , ` . • ~ ~ • r~ ~
. ' ' . •.qy } `tR',~~^ •r~ ~ '6 ..1~ ♦~F ~ F ~x ~ ,
w y . , . • e{lvVl`n~ ~'~r4~'r_+.~~'Ya,~~IM ' - ~ ..~..x~_~ ~ ' _ .
~ , ~ " • ~ .1'~ . 'ds r~.h-~~.j~. 'Y , -r'....Y~...~ 4..z7_
- - ..1 . ~ - ~4 , ~ j ~ • ~ e: e ~ . w ~ - " ~ ~ ~
. . • , ' _ , • G . ~ a . ~
- - - - - - - - : - ' • . " - r ' - '
. ~ ' . ~ r { _ . • ~ ~ ~ Yr i ' V ti; ~ ~n IV ~ •
CD a~sao J. ~
E~:x{~f ~.~flG~.'~.tiaK
. ~ ' - ~ ' I• ' ~ • - ' ~ ' ,
~ H , . .
' • . . _ ~ ~ ' '
" ~ , . ~2~ C ~ • - '
~ . '
UL9NJ MIN1 B J ~ . s
~y
. . 1 . Vti~
, ~ ~ . ' . ' f ~ . • I ~ ~ '
~ _ . . • a i ~
' ' ' , . ~ . . ' ~ i . , ' ' . ' ` , j ~ I~"~
_ ' • I ~i. f . e-k,.
. . , . : t ' ' ii ....v~ _ _ , .
''t , , , , . _ . , i , - - - ~
, . [P~ • j~ . ~ ~ ; .
• - , ~ ~ . . , .
J
. , ~ ~q - . ~ k • J
L
' . , - • . , . . ~-°u~ ~ " . . ~ : ~ , E . ~ v~
. ~ ~ 47 ~
' - . r_
i . . , - ~ SL si ' - F , ~ • • ° . ~ ' - 17
, - . , • , . ~ ; • ; , AC , , , . .~Y , ,
< ~ Y
` , . . . , . : ` - : • 4 ~ . , ~ , . ~ . . , ~ - , - ~ _
~x, `~F . ~ ~ , ~ . , , _ . ..•Q.._ „
~ L. . ~ . i . Cq
`5~ L . + ' • . - ~ ~ I
~~~J ~ ~ ' * . . ~ f . i. . ~ - . _ ~ ~ 1 . . ~ - [ •
yLY~` 1 ' I , ~ . ~ I 11lI
, y~-~ A IT . • , . ' ~ ' . , . . . . , r ' ' , _ ~ . I , , ' ' ~ .
~ .t . r • ' 9 ~ ' ' ~ - ~ ~ - ~ _ n .a . ]
. ~ .~e ` . ~ . . . ' . . , . 1 + _ . . , . . . , ~ ; 1 i~ ~ ~ i ' 4 ~ ' • ' -
- li, ' i ~ 7• , ~ . . . ti W~ . • . ~ ' 4~ ~ i,: ~ , ~ ` . c
, 'aL ' ' . ' ' „ ~I• ' . ' , . , . • )Il,o`f +.4Slv7 II"7f~ 11y ~1 (l~r . , ~ ~ ° ' • ` '
~4• r ~ ~ i~• • - ~ ~ J , ' ' ~yra ~ X PHAL~
C~.
PARkING, 4.0T
- - ' , • , . . ' , • • ; • , , • ; . . . , ~ . ~ . ' ~ • ~
: . " ~ , . . ~ - • ' . , . , ~ 4 ,
r. • ' ~ ~ ' ' ' . • . . . ~ . - ~ T , ' , . , . ,n '
,1, 5 . ! ' 't ' • , - , . . , , ' . i~ . , ti~ ' ~ ' A ' - . ~ .
i . ~ .
y~ r~ y • ~ ~ • ~ ' . . 13 . , . • .
. , ' . ' ' I 1 r 5~ ~ • ' , . , ' , " ,
l, ~ ~ ~ . ~ . , ~ I . 1'~ • , ~ I ~ ~
I • i ~ ~ ~ . 4 . ~ , . - . ~
. ,
, , • . , , , ' . , , ,
A a
I i , ' • ,
. l;~ r. • ~ ~ .
zaa oRAiN swALE' I
~ • 1 ~ ~ ~ .
• . ~ ~ ' ~ I ,
< SLOF'E GRAt3E I
. . ' , ` ' ' • ~ ' ' ,
' • - ~ . . ,
, . ~ a . ~ . - , . _ ~ . .r . - . _ ~ . ~ . : _ ~
' , ~ ~ ~ . , , , ' , ~ T ~ ~ . . • ' . ,
' ' , , . _ . . , , , • , , , , ~ , _ , ,
~ D
REcErVE
ProJ'ect Transmittul JUL 10 2000
Division of Building and Code En forcement SPoo' COUIVTY ENGINEER
Tyaiisiriittal Date: Monday, .Iuly 10, 2004
Site Address: 10814 E BROADWAY AVE Project Number: 00005372
Parcel Number: 45163.0155 Zoning: UR-3.5 Fire District: FD 01
Permit Use: GRADING OF GRAVEL PARKING LOT WEST OF CHURCH (DONE 1997)
Applicant: SPOKANE VALLEY NAZARENE CH Owner: SPOKANE VALLEY NAZARENE CH
10814 E BROADWAY AVE 10814 E BROADWAY AVE
SPOKANE, WA 99206 SPOKANE, WA 99206
(50.9) 926-1545
Contact: FRANK LOHNER/SPO VAL NAZ CH Arch / Engineer: _
10814 E BROADWAY AVE
SPOKANE, WA 99206
(509) 926-1545
Contractor: OWNER
0 000000,00 000000
( ) - 0
Building Landuse Engineer Utilities Health Fire Dist Assessor
Comments: Coordinator Cfrazier
~
. Sf'ORECEIVED
' . KANE COUNTY
~ •
J UL 0 5 2000
SPOKANE COUNTY BUlLDING AND CODE ENFORCEMENT
~ AIR PaLlUTION BY:
q CLEARt~~~~R ~
S oc> .c A~v-= GONTROI AUTWORITY
WEST 1101 COLLEGE, SUITE 403 s SPOKANE, WA 99201 0(509) 477-4727 Fax (509) 477-6828
June 30, 2000
TO: Caroi Frazier, Spokane County Building and Code Enforcement
FROM: April Westby, SCAPCA P""
RE: RECOMMENDATION FOR PAVING WAIVER REQUEST #PW0116
Steve Wilson
Mailing Address: Valley Nazarene Church
10724 E. Broadway
Spokane, WA 99206
Site Address: 10724 E. Broadway
Spokane, WA 99206
Backqround
A paving waiver application was submitted to SCAPCA on June 27, 2000 by Steve Wilson on
behalf of Valley Nazarene Church. The application requests a waiver of certain paving
requirements pursuant to the Spokane County Zoning Code, Section 14.802.080, for a graveled
overflow parking lot located west of the church parking lot at 10724 E. Broadway, Spokane,
WA.
The main entrance to the church is off Broadway. There is a paved parking lot that serves the
majority of the parking needs for the church. The paving waiver request is for a 100 sq. ft.
overflow parking area to be used by approximately 25 cars on Sundays. The area is owned by
the neighbor directly west of the church. Access to the overflow lot is from the paved parking
lot at the church, so tracking onto Broadway should not be an issue. Valley Nazarene Church
has graveled the area to control dust. The overflow lot is gated and is locked when not in use.
Recommendation
SCAPCA prefers that all traveled surfaces be paved in Spokane County for the protection of the
airshed. Portions of Spokane County are designated as nonattainment, for the federal air
quality health standards for fine particulate. The proposed site is located inside of the PM,o
nonattainment area.
However, given the facts that the unpaved area will only be for overflow parking one day per
week, the lot is gated and locked when not in use, and the lot is accessed via a paved parking
lot, the issuance of a paving waiver should not have an adverse impact on air quality.
Therefore, SCAPCA recommends approval of this paving waiver. However, the approval is
contingent upon the following conditions:
Ps
~ r r'nnte' en Recyc;ed rawer
~
f , J 1. Any future expansions, changes in use / function, increases in activity, etc. (i.e. use of
unpaved areas for anything other than overflow parking lot for church) at the site will
require the paving waiver request to be re-evaluated by SCAPCA.
2. The unpaved areas must be graveled and properly maintained to keep the surfaces free
of dirt and mud. In order to fulfill this requirement, the gravel may need to be
periodically re-applied. In addition, an appropriate dust palliative (i.e. lignin sulfite or
equivalent) or water may be required to minimize dust.
3. The deposition of dirt and mud onto paved public roadways is prohibited. If tracking
does occur, immediate measures must be taken to clean these surfaces.
4. Measures must be taken to prevent particulate matter from becoming airborne
(SCAPCA Regulation I, Section 6.05). The deposition of particulate mafiter onto the
property of others or beyond the property line is prohibited.
5. If SCAPCA documents a violation of Regulation I, Section 6.04, "Odors and Nuisances,"
additional controls, which could include paving, may be required.
6. Failure to comply with any of the above conditions may result in additional controls,
which could include paving.
A paving waiver, in no way, exempts the facility from complying with SCAPCA regulations.
enc: Invoice
cc: Mr. Gary Nyberg, Spokane County Engineers
Mr. Steve Wilson, Valley Nazarene Church, 10724 E. Broadway, Spokane, WA 99206
~
,
SPOKANE COUNTY
L CLf~Jf1RiV` Ail1 ~ AIR POILUTION
- r. o K~ N E CONTROL AUThORITY
WEST 1101 COLLEGE, SUITE 403 • SPOKANE, WA 99201 •1,509) 477•47?.7 fax (509) 477-6S78
June 30, 2000
TO: Carol Frazier, Spokane County Building and Code Enforcement
FROM: April Westby, SCAPCA aA;l
RE: RECOMMENDATION FOR PAVING WAIVER REQUEST #PW0116
Steve Wilson
Mailing Address: Valley Nazarene Church
10724 E. Broadway
Spokane, WA 99206
Site Address: 10724 E. Broadway
Spokane, WA 99206
Backqround
A paving waiver application was submitted to SCAPCA on June 27, 2000 by Steve Wilson on
behalf of Valley Nazarene Church. The application requests a waiver of certain paving
requirements pursuant to the Spokane County Zoning Code, Section 14.802.080, for a graveled
overflow parking lot located west of the church parking lot at 10724 E. Broadway, Spokane,
WA.
The main entrance to the church is off Broadway. There is a paved parking lot that serves the
majority of the parking needs for the church. The paving waiver request is for a 100 sq. ft.
overflow parking area to be used by approximately 25 cars on Sundays. The area is owned by
the neighbor directly west of the church. Access to the overflow lot is from the paved parking
lot at the church, so tracking onto Broadway should not be an issue. Valley Nazarene Church
has graveled the area to control dust. The overflow lot is gated and is locked when not in use.
Recommendation
SCAPCA prefers that all traveled surfaces be paved in Spokane County for the protection of the
airshed. Portions of Spokane County are designated as nonattainment, for the federal air
quality health standards for fine particulate. The proposed site is located inside of the PM,o
nonattainment area.
However, given the facts that the unpaved area will only be for overflow parking one day per
week, the lot is gated and locked when not in use, and the lot is accessed via a paved parking
lot, the issuance of a paving waiver should not have an adverse impact on air quality.
Therefore, SCAPCA recommends approval of this paving waiver. However, the approval is
contingent upon the following conditions:
1. Any future expansions, changes in use / function, increases in activity, etc. (i.e. use of
unpaved areas for anything other than overflow parking lot for church) at the site will
require the paving waiver request to be re-evaluated by SCAPCA.
2. The unpaved areas must be graveled and properly maintained to keep the surfaces free
of dirt and mud. In order to fulfill this requirement, the gravel may need to be
periodically re-applied. In addition, an appropriate dust palliative (i.e. lignin sulfite or
equivalent) or water may be required to minimize dust.
3. The deposition of dirt and mud onto paved public roadways is prohibited. If tracking
does occur, immediate measures must be taken to clean these surfaces.
4. Measures must be taken to prevent particulate matter from becoming airborne
(SCAPCA Regulation I, Section 6.05). The deposition of particulate matter onto the
property of others or beyond the property line is prohibited.
5. If SCAPCA documents a violation of Regulation I, Section 6.04, "Odors and Nuisances,"
additional controls, which could include paving, may be required.
6. Failure to comply with any of the above conditions may result in additional controls,
which could include paving.
A paving waiver, in no way, exempts the facility from complying with SCAPCA regulations.
enc: Invoice
cc: Mr. Gary Nyberg, Spokane County Engineers
Mr. Steve Wilson, Valley Nazarene Church, 10724 E. Broadway, Spokane, WA 99206
,