Ella N 915 Storage Bldg for Sporting Good Equipment
~\A
3 •
~ t
BLDG.PERNUT #•ar-FILE#~~~~~.~-- _
Date tt~ ~eviei~,
Taate Received
r
Project Name '1 No. Lots NQ. Acres
~
ADDRE5 42M?~6 ~ FARCEIr #
s-t- r
Spomoes Name _ _ Pbon@ # 43~- S4'a
Addcess Work #
~
I?ate cbMd3tibns m~:led
Contact~Person Phone #
FLOO►D ZONIS Yes NrQ -
Engineer / Survey,Ws / Arcb,i#ect's Name _ •
Water Addres~
~ewer
SchQol _
Plannm,'g Contact Person _ Pbone #
Date Submitted. Description Initi",
J i~l 5~-tA
w n
~ ~ ~ ~ ~ ~ ~ ~ ~ 1~--~,.~~ ~ d~~'~ ► lx xtA
Ir
~
,
. ~
- i~aupt~a
PROJECT INFORMATIOW. !
~
, ~o.T. 4 : = r..a "oCOM L.,lPF .
A. I. Name of Project: e-LL. 4,N hwu 4! IS L. Date : M aR, • 14- ~1 `1 `l 1
2. Street Address : t`I.~.'L r-, ~ L.L f+~-t~.
' 3. Legal Oescription: •
(Name) _ (Address) (Phone)
5. Owner: LeA..`y' F.- D-ro O. G.
,
6. Englneer:
7. Consultant:
8. Cont ractor: LqA..rec.- O P,41, 14. FS RD b.p-w ;rrV ►L r-~•1~ ~ : ~ ~
~ 'b' v ~ t ~ t_A.1~.1 35. L~ u
9. Contact Person• .
10. New Remo e Ad i ti on A1 terati on
11. Existing lot/bu ing use: 0 l c E M FL.-~ .
12. Proposed use(s ):-Of~lt~/N! Number of d*F99 g uni ts:
1 3. O c c u p a n p l G r o u p. A E I H R M 14. Construction Type qui • II I UL-Hrp
E:L, l,p• A► liLNT ~ I I I 1•Hr. 7111 N
. . V 1-Nr. .N.
.
Auto Fi re Exti ngui shi ng System -tsiC?
Actual Constructton ?ype: 1~j 1,~
15. Allowable Height.
16. Al l owable Area :_~,~1 '
17. Bui 1 di ng Nei ght (8oth in ee ~ and number of stori es Feet Stor1 es
18. Basement floor area and occupant 1oad: Floor Area OccupantTad
19. Ground floor area and occupant load: Floor Area Occupant Load
20. Floor area of each story above ground floor and occupant load (List each story ,
individually): '>e~e yw • A I
21. Total fl oor area, incfudln9 basents and occupie' roofs :
22. Yaluation:
8. ZOrIING INFORMAYION •
1. List dates of hearings during which arwy of the following were granted:
Zone change to construct a specific plan:
Special Permit (list): .
Variance (1 i st
NLY Agreement:
2. Special R+egulations: Aote any ohe foMow#ng permits, approvais or restric- ,
tions: •
Design Zones: '
Shoml 1 ne/Ri verfront D# strict: .
Hei ght Distri ct:
Ary hazard areas Mrport.'Me, F-loody:
Any previous enviroiuaental declarations on pro~ect:
3. Use Zone of'lot (s
4. Use Zones of adJacent lots: North South East Wst
5. Lot area (square feet): 6. Percent of lot covered by u ngsn:
•,7. Area of 1 ot covered by hard surfaci ng of ar~y ic~ n~:
8. Parking and loading stalls: Required: ProvM:
Barri er Free Park1 ng : Requi red: Provi ded:
9. Setbacks and Yards:
Front, Side r _ Rear
.
.
. '
S P O K A N E C O U N T Y
DEPARTMENT OF BUILDINGS ~ A D1V[SION OF THE PUBLIC WORKS DEPARTMENT
JAMES L. MANSON. C B O, DIRECTOR DENNIS M SCOTT A E, DtRECTOR
RFCEI'VED '
MAR 2 2 1991
j SPOKANE COUrI3Y ENGINEER
TO: Pam Heeter, Health District '
Ren Jeffrey, Division of Buildinqs
Lorne Lakshas, Planninq Department
Bob Turner, Division of Engineerinq & Roads
Clyde Wisenor, Ffre District No. 1
FROM:43ToYn Davis, Code ComFliance Coordinator
Division of Buildings
DATE: March 21, 1991
RE: March 20, 1991 Pre-Application Conference
North 225 Ella, Buildinqs A& B,
Enclosed is your copy of the minutes to the referenced meeting.
Should you have any questions or need additional information,
please feel free to contact me.
TLD:rmd
cc: Ms. Judy Ashely-Henjwn, Design Source
Mr. Clay Conrad, Garco Construction
Mr. John Morrow, Pinnacle Realty Inc.
Ms. Mabel Caine, Air Pollution Control Authority
Mr. Dennis Scott, Public Works Department
CODE ENFORCEMENT DIV1SlON
WEST 1303 BROADWAY * SPOKANE, WASHINGTON 99260-0550 0 (509) 456-3675
FAX (509) 4564703
r ,
IIXNQT$i8
PRI-APPLICATION CONFZRBNC$
NORTB 225 ELLA BQILDZNGB A& 8
WOR INTERIOIt jtSlriODEI.
MARCS 20, 1991
CALL To ORDERs The meeting was called to order at approximately
11:00 a_.Ya. by the Division of Buildinqs Code Compliance Coordinator,
Tom Davfs, with the following in attendance.
PERMIT REBISW PARTICIPANTSs
Robin Domitrovich, Division of Buildinqs
Pam Heeter, Health District
Ken Jeffrey, Division of Buildinqs
Lorne Lakshas,, Planning Department ~
Bob Turner, Division,of Engineering & Roads
Clyde Wisenor, Fire District No. 1
APPLICANTBs
Judy Ashley-Henjum, Design Source, W. 2,16 Pacific
Spokane, WA 99206 (509) 455-8740
Clay Conrad, Garco Construction, E. 4114 Broadway
Spokane, WA 99202 (509) 535-4688
John Morrow, Pinnacle Realty Inc., S. 9 Washington, Suite 701
Spokane, WA 99204 (509) 747-7777
SCOPEI°PROJ$CT OESCRIPTIONe
I. General Overview - The owner Output Technology Corporation
(OTC) is proposing a major interior remodel of Bufldinqs A& 8-.
Buildinq A_will be an administrative buildinq. Build'ing B will be
used for offfces, manufacturing, and storaqe.
BMMMARY OF DEPARTMENTAL RSQIIIREMLNTB e
1. Planning Department (456-2205)
A. Discussion/Requirements
1. Please submit a revised eite plan identifyfng what
each area of the buildinq will be used for. _
2. Parking as illustrated on, the site plan is adequate.
A minimum,of 200 parking spaces are required, 218 spaces
are shown,.
- 1 -
t ~
3. Since the property is an unplatted parcel, a
certificate of exemption is required to be obtained. A
form for obtaining the certificate was given to the
applicant during the meetinq.
B. Permit Release Requirements
1. Please submit a revised site plan identffying what
each area of the buildinq will be used for.
2. A certi f icate of exemptf on is required to be obtaf ned
for the subject property.
II. Divieion of Enqineering & Roads (456-3600)
A. Discussion/Requirement
1. There are no exterior improvements to the site,
therefore, the Division of Enqineerinq & Roads has no
requirements.
B. Permit Release Requirements
1. The Division of Engineering & Roads will release their
portion of the buildinq permit once it has been applied
for.
III. Health District (456-6040)
A. Discussion/Requirements
1. If it is indicated that there will be an increase in
sewage flow above the capacity of the existinq sewage
disposal systems, it will be necessary to apply for a
permit to install a new on site sewage disposal system.
Please indicate the anticipated number of employees so
that it can be determined if the existing systems will be
adequate.
2. Please submit a critical materials list to the
Division of Buildings for review. a
3. If it is determined that the proposed fs a critical
materials user the owner will be required to Bign a
Samplinq Agreement. The agreement allows the Health
District to sample the effluent of the septic tank on an
annual basis. All cost for sample retrieval and analysis ,
shall be paid by the owner.
- 2 -
.
4. Any processed waste qenerated by the project will be
under the juriediction of the Department of Ecoloqy. The
Health District must receive notification of approval from
the Department of Ecoloqy as to the method of handlfnq
wastes, prior to grantinq any approvals.
5. The exf stinq drainf ield lines located to the south of
the shop buildinq are being driven over. Vehicle traffic
over drainfields is prohibited therefore, this area is
required to be barricaded.
B. Permit Release Requirements
1. Please verify if the existinq on site sewaqe disposal
systems are adequate for the proposal. Zf the systems are
not adequate a permit to install a new system shall be
applied for.
2. If it is determined that the proposed is a critical
materials user, the owner will be required to sign a
Sampling Agreement.
IV. Fire District No. 1(928-2462)
A. Discussion/Requirements
1. Clyde Wisenor visited the proposed prior to the
Pre-Application Conference and found that the existing
sprinkler system is not working. If the applicant plans
to abandon the sprinkler system, the sprinkler siamese
located outside of the building shall be removed.
2. A lock (Knox) box entry system for fire department
personnel access is required to be installed on both
buildings. Forms for obtaining the boxes were given to
the applicant.
3. Access to the fire hydrant located on the south west
corner of the property shall be maintained, free of
rubbish.
4. Please submit floor plans for fire department records.
V. Division of Buildings (456-3675)
A. Discussion/Requirements
1. Plan review has been completed on preliminary plans
by Ren Jeffrey.
- 3 -
• `1
• 2. The proposed shall comply with the minimum
requireiaents of the Washington State Regulations for
Barrier Free Facilities.
3. Please submit a critical materials list to the
Division of Bufldinqs for review.
4. Ken Jeffrey would like to set up a time to meet with
the applicant and Clyde Wisenor at the existinq location
of OTC and then visit the proposed site. The visits would
clarify the uses withfn the structure and will clarify
what areas will need to be classified as H or B
Occupancies. Ken will also verify tbe integrity of the
existinq area separation walls in the proposed buildings.
8. Permit Release Requirements
1. Two complete revised sets of plans addressing the
items discussed durinq and after the meetinq needs to be
submitted for revfew and approval.
APPLICANT'8 COMM$NTBIACRNOWLEDG8M8NT:
The applicant acknowledqed that all comments/requirements were
understood and had no further questions at this time regardinq
permit requirements.
CORR$CTIONBs
To minutes or chanqes from what appears in the minutes, we should be
notified within one day of your receipt of these minutes.
To site plaas as required by any or all of the above-listed
departments shall be submitted ta the Division of Buildings who will
then distribute accordinqly to those departments.
ADJOVRNrMLNT: There being no further business, Tom Davis thanked the
applicant and the departments for their participation and reminded
all that he should be contacted if there are any unforeseen problems
which may arise.
The meeting was adjourned at approximately 11:30 a.m.
Copies of Minutes to: All participants
File - North 225 Ella Road Suildinqa A& B
Major Interior Remodel
NoTE TO AkPLIgAM: Some time aqo the County recognized the need to
streamline the building permit system and accordingly initiated
- 4 -
b
these Pre-Construction Conferences. Comments so far would indicate
these conferences are successful and do enhance the permit system.
As a recent participant, we would appreciate any comments you miqht
have to further improve the process or, should you have any
questions or concerns reqarding your conf~erence, please contact
either Jim Manson, Division of Buildings Director, at 456-1675 or
Dennis Scott, Publfc Works Director, at 456-3600.
Sincerely,
James L. Manson, Director
,
- 5 -
<
~ a'i •
!4a , rt~.
~ o ~
COU... Aoa t~
r' ~ ~~e y. .~r g ' ~ 1~ ~ ~ ~,f
~rT 1 ^
L
11-10N
_D
j1p l J
tr
~ , o ~ 4
4'`ti
t
~ 1 ~ •
~ , 1K t~ W ~
00 1RE 1btAP I
-70, ►
- • •
Com1 t. R .
` z, ~~zd= r ~ FXCEPT AREAS COCf'
~
% KY4.1RFACf.
f~ •.s t r''•~2 t_4l (!jt'.,j'~,, ~M,~i1
! ~ ~s • ~ ti
'.b~~ v ~ ~ ~
. ~ ~ n+ v
_
s ~
9~60
d ' Z)k.
r ~F3 ' ~
c
~ ~ r~, 1 ~ ~ , . Q~f •
- ~ ~ , ~5 ~
~ ~ t3 t
~ ~ -
~ E ~ ~ ~~"~•~~~~"~~~:.s _
~wh c ► a~
_ _ _ _ • , ~
2~✓ ~3.... 344 004
~ ' fs-`~ 1 A . a A~ ya~,~' ; ~ ~
3 c b~ .•y ~ ~ ~ r-- E -
~IL,~`t
~ ` . ~ ~ Z z a - '~~L ~ ~ l~ r
X ¢
.
314 /g , ~ ~~.~t ~ • 1
G ~ y
Q fd s J~,Sl3
.
1 IS.. JC ~,e~°'•~~► ` ~3 ~ p~• " ~ `
. .z..r •m ~~y~ k 73 ~ / _ j c, f ,.~~t
~ ~ 4'' `r~~• y' : > ~ Fp~ ~ ~ ~ •
' ~ f, I r.~-r'~~ , ►'l pR ~ ~E ~
i
. • ~
~
R
a ~
r
~
..c ~ - ~ ♦ t" ..1 ~r . ~ ~ x 3
~ - - s _ - -r ~ ~ ' `7 ^y.,f~'✓ ..~0.'' a~ ~ t
I ' ` ~ - T i _ .t . ; _ • 9 . ° ~ _ o ,
° .E r - ` ' .
~ _ - . ~ _ _ tiF
~ ~ ~ g ~►y~ ' ►N ER AT/QNAL
, .i-sJ i ._r--
, 7'
w
` - - -
° _ ~ -
r
1 ,
ZONE A
20 i
Ah
R P p• _ r w ~ g
i UP / . q ~ Z C 60~.
to
l~ ~ r .rl a _
1,
ptLK 3 ` ~
tt ~ "j J
A nYON
~-~ti ~ •
1.~ go ' ~ a ►
~ ►
ZONE
~
1 ► ~ ~ , -r . . ~ - 4
~ ~yLT
~
~ 1r
Y
t W
v ~ k 0F
4 ~.IAn ~
zn
I c "l ~
► g ~ r ' ~r~~ J1~- 1 ► ci
t
~ Pa
J1 ~ I &
T PaUL
1 ~ s
1~ - ..,,,1 pCIFIC ti ~ r : tica p0"0 ~ "wau►cEE
pN MIL ~eYE
Q~ ~ ~ r- ~ Y "'~D15NM
CK(CAIS I
~9 _ _ _ ~ - ~ _ -
~ Z
'1 /1~~
(~!W"'
cwk
av
a
i . ~ ~ • r
_ ' ORI►N A1VE i ~ .
:r ~ ~ (
r' 1
.4 • , i ~ ~
C"il IC1
19
- ~ 9 i 1 ♦ 1` ~
L
r-~ ► ~
x oo° ~ ,
d ~
14
, ~ ~ ~ w ► , ~
C~ C.
. ~
o l, Zo #s W. $
zON
~ '
p a V r
a Il ~ ~ ~ SE
RECEIVvt ;
NOTICE OF TRANSM TTA ~1'[MR 8
,
SPQIU~:NE 4C, s ~ *
- .
ADDRESS ~I ~<r CLU 0-rPFA61t?) PARCEL # lF51/~
PROJECT PROJECT # TT5,-ArPL
DESCRIP.
owNER PHOhE5 #
CONTACT
, .
TYPE OF CONFERENCE
/Pre-Apptication Pre-ConstnucUon Other DATE
~
TIME: ~ ~ -4CO AU
DOCUMENTS CIRCULATED
DATED REVISED
APPUCATION ✓
SITE PLAN
ORAINAGE PLAN • • -LANDSCAPE PLAN
Othet: ~
_ . ,
Other.
a ,
AiDdITI0I4AL INF'ORIVIATI4N ~ " .
CiRCULATED TQ CIRCULATED 8Y
DATE
Air Pollution Ubtities ~
Engineering ~ Fire District # ~
Health Districtv**- Uberty Lake Sewer Questfons? Contaci Jeff Forry or
Planning Other.
Spokane County
DEPARTMENT OF BUILDING AND SAFETY
1Nest 1303 Broadway Spokane, WA 99260
(509) 456-3675 (office) or (509) 456-4703 (fax)
~
PROJECT NUMBER= 93005594 APPLICATION DATE= 07/08/93 PAGE= 01
THIS IS NOT A PERMIT
PENALTIES WILL BE ASSESSED FOR COMMENCING WORK WITHOUT A PERMIT
SITE STREET= 915 N ELLA RD PARCEL#= 45182.9147
ADDRESS= SPOKANE WA 99212
PERMIT USE= STORAGE BUILDING FOR SPORTING GOOD EQUIPMENT
PLAT#= 999999 PLAT NAME= RANGE
BLOCKa LOT= ZONEg UR-3.5 DIST#= E
AREA= 00000000 F/A= F WIDTH= DEPTH= R/W=
# OF BLDGS= 1 # DWELLINGS= WATER DIST a SPOKANE SUBURHAN
OWNER= WEST VALLEY SCHOOL DIST 363 PHONE= 509 922 5465
STREET= 2805 N ARGONNE RD
ADDRESS= SPOKANE WA 99212 CONTACT NAME= TIM DORWIN PHONE NUMBER= 509 926 1883 ~
BUILDING SETBACKS: FRONT= NA LEFT= 66 RIGHT= NA REAR= 5
REVIEW INFORMATION **rt*~****,t***rt*,t*************
DEPARTMENT REVIEW REQUIREMENT
BUILDING REVIEW COORDINATOR - J SHATTO
COMMENTS:
BUILDING PLAN REVIEW REQUIRED
COMMENTS:
ENGINEER SITE DRAINAGE TO BE R VIEWED
.
COMMENTS : ZQCQ
~
HEALTHDIST INCREASE IN LOT COVERAGE
COMMENTS:
PLANNING SITE PLAN REVIEW REQUIRED
7161q3
. ,
COMMENTS:
.
*********,t~~***********~******* BUILDING PERMIT
CONTR.ACTOR= OWNER PHONE=
NEW= X REMODELa ADDITION= CHANGE OF USE=
DWELL UNITS= OCCUP. LD= BLDG HGT= 14 STORIES= 1
BLDG W X D= 20 X 36 SQ FT= 720 SPRINKLER= N
l
~
~
_
.
~
_
~ ~ ' s:
_ ~
- s
,
Y'
+1 " -
. . .
w
w p~~~
I ~ _
.w~ 4 -
_
°~rpNa
a
t.,~ -
. . ~
~
vs._ .
~ s
a
• kr_~
'1~~ ;t
r_" ~S , ~
. • r.
~
3j
, ~ , • ~
' ,
~ ,:'~-?P~-~
. Y~~