2007, 11-15 Permit App: 07004493 GarageProject Number: 07004493 Inv: I Application Date: 11/15/2007 Page 1 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Proiect Information:
Permit Use: 18 X 24 GARAGE Contact: ZIEGWIED CONSTRUCTION
Address: 3923 E WOOLARD CT
C - S - Z: COLBERT, WA 9 9005
Setbacks: Front Left: Right: Rear: Phone: (509) 995-1168
Group Name:
Site Information:
Project Name:
Plat Key: 004158 Name: MIDILOME 04TH ADD District: Sout
Parcel Number: 45331.2814 Block:
SiteAddress: 12121 E 34TH AVE
Location:: CSV
Zoning: UR3.5
Water District:
Area: .00 Acres Width: 97
Nbr of Bldgs: 1 Nbr of Dwellings: 1
Lot:
Owner: Name: DORNAL, ART & A SUE
Address: 7808 E WOODVIEW DR
SPOKANE, WA 99212
Hold: ❑
Depth: 160 Right Of Way (ft): 60
Review Information:.Wo:
Review
Building Plan Review
Originally Released:
Landuse/Zoning/HE Conditions
Originally Released
11/9/2007 By: tmelbourn
11/14/2007 By: mpalaniuk
Permits:,::. a: �....
Operator: JD Printed By: jmm Print Date: 11/15/2007
Project Number: 07004493 Inv: I Application Date: 11/15/2007
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Building Permit
Contractor: ZIEGWIED CONSTRUCTION Firm: CHAD ZIEGWIED/ZIEGWIED CO
Address: 3923 E WOOLARD CT Phone: (509) 995-1168
COLBERT, WA 99005
Building Characteristics
Building Height 0
Description Grp Type Notes
GARAGE U-1 VB
Item Description
RESIDENTIAL PERMIT FEE
ACCESSORY PLANS REVIEW
WSBC SURCHARGE
Total Project:
Sg Ft Valuation
444 $8,436.00
444 $8,436.00
Fee Amount
$167.25
$41.81
$4.50
$213.56
Notes: ��m „ , .
Page 2 of 2
Payment Summary:
.<., _ .. .mom mF .:.
Permit Tyne Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $213.56 $213.56 $0.00 $213.56
$213.56 $213.56 $0.00 $213.56
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: jmm Print Date: 11/15/2007
This Application:
Sa Ft Valuation
444 $8,436.00
Totals:
444 $8,436.00
Units
Unit Desc
1
SELECT
1
SELECT
1
SELECT
Permit Total Fees:
Total Project:
Sg Ft Valuation
444 $8,436.00
444 $8,436.00
Fee Amount
$167.25
$41.81
$4.50
$213.56
Notes: ��m „ , .
Page 2 of 2
Payment Summary:
.<., _ .. .mom mF .:.
Permit Tyne Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $213.56 $213.56 $0.00 $213.56
$213.56 $213.56 $0.00 $213.56
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: jmm Print Date: 11/15/2007
Permit Center
S�m ane OF 11703 E Sprague Ave, Suite B-3 PERMIT NUMBER: 1
pokane SpokValley, WA 99206
Valley -(509)688-0036 FAX: (509)688-0037 PERMIT FEE:
www.spokanevalley.org
Community Development
Residential Construction ❑ New Construction XLAccessory Bldg
Permit Application ❑ Addition/Remodel ❑ Deck
❑ Other:
SITE ADDRESS: 1 Z 2 L 3, `2' A sl t S p m )_�C,,� f -V A I-Arzy , w I-) 11l:� 21O
ASSESSORS PARCEL NO: L15331 .2 S\ Lk LEGAL DESCRIPTION: Yn \ p \"Vyxr, -J"lj 61, Ur V4 6lki
Building Owner:•
Name:
Address: Z ��
CityS State: . Zip:
r—Phone:Fax:$q3^Ill \,7S
Contact Person
Name: (�
Phone: y - Cocrl
Describe the scope of work in detail:
Proposed
Contractor:' %
DIMENSIONS:
# OF STORIES:
TOTAL HABITABLE SPACE:
Name:
18jkft X 2-M
12 'C',
Address:
City:�
;_
Zip: 1�_
State:e_�e,
1116 Y
IMPERVIOUS SURFACE
Phone:
Fax/;
}4�
Contractor Lic No:
Exp Date:
tai A
City Business Lic. No:'
FINISHED BASEMENT
GARAGE SQ. FTG:
Cost of Project: $ 24,00 0
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK:
DIMENSIONS:
# OF STORIES:
TOTAL HABITABLE SPACE:
18jkft X 2-M
lv
MAIN FLOOR TO SQ.
2 FLOOR SQ. FTG:
UNFIN BASEMENT SQ. FTG:
IMPERVIOUS SURFACE
FTG:
AREA:
tai A
N
FINISHED BASEMENT
GARAGE SQ. FTG:
DECK/COV. PATIO SQ. FTG:
30% SLOPES ON
SQ. FTG:
gie 4 y 4 4
UI
PROPERTY: V,,31 p
# OF BEDROOMS:
CONSTRUCTION TYPE:
HEAT SOURCE:
SEWER OR SEPTIC?
tv N
F e
1N h
N 1 (:4
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
SIGNATURE
Method of Payment:
❑ Cash
Bankcard #:
Authorized Signature:
REVISED 211 W07
❑ Check ❑ Mastercard
Expires:
DATE: 1 1/ C� 4a�. l 2 0 0-7
❑ VISA
VIN#:
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ cityhallCa)spokanevalley.org
Residential Plan Submittal Minimums
❑ Completed Building & Mechanical application with: Accurate address, Parcel
Number and/or Legal Description, description of work, owner and contractor
information, signature, and date.
❑ Two sets of plans including Site Plan, elevations, floor plans, foundation plans
With details, roof plan, framing plans & details.
❑ Show the height of any proposed buildings or accessory structures.
❑ Floor plan for each floor: Dimension to scale (minimum 1/8") and label each
Room (including sq. footage of house and garage on plans) Show each
level of existing house and square footage of any additions.
❑ All braced wall panel types: show locations and details of installation, including
engineered design.
❑ Egress windows: Provide at least one window or exterior door approved for
Emergency escape or rescue from a basement and in every room for sleeping.
❑ Smoke detector locations
❑ 22" X 30" attic access location
❑ 18" X 24" crawl space access:
❑ One-hour separation detail: between house and garage
❑ Floor framing details: Joist type, size, spacing and installation details
❑ Roof framing plan and details
❑ Furnace and hot water heater location.
❑ All header locations: type, size, and connections
❑ Foundation plan
❑ Insulation information
Site Address: 12121 E 34TH AVE
Parcel Number. 45331.2814
Zoning: UR3.5
Fire District: FD 01
Project
Transmittal
City of Spokane Valley
Community Development
Department
11703 E. Sprague Ave, Suite B3
Spokane Valley, WA 99206
Phone: 509.688.0036
Water District:
Applicant: ZIEGWIED CONSTRUCTION
3923 E WOOLARD CT
COLBERT, WA 9 9005
(509) 995-1168
e-mail:
Contact: ZIEGWIED CONSTRUCTION
3923 E WOOLARD CT
COLBERT, WA 9 9005
(509) 995-1168
e-mail:
Contractor: ZIEGWIED CONSTRUCTION
3923 E WOOLARD CT
COLBERT, WA 99005
(509) 995-1168
Project 18 X 24 GARAGE
Description:
New project
Previous pre -app meeting ❑
Plan revisions El
Transmittal Date:
Thursday, November 08, 2007
Project Number: 07004493
Owner: DORNAL, ART & A SUE
7808 E WOODVIEW DR
SPOKANE, WA 99212
e-mail:
Occupant:
e-mail:
Arch / Engineer:
e-mail:
FE
D)
IR
t^iii 0 2001
D'
DDDRM, C
'
Please send all plan review and project comments via e-mail to the
highlighted individuals.
Site Address: 12121 E 34TH AVE
Parcel Number. 45331.2814
Zoning: UR3.5
Fire District: FD 01
Project
Transmittal
City of Spokane Valley
Community Development
Department
11703 E. Sprague Ave, Suite B3
Spokane Valley, WA 99206
Phone: 509.688.0036
Water District:
Applicant: ZIEGWIED CONSTRUCTION
3923 E WOOLARD CT
COLBERT, WA 9 9005
(509) 995-1168
e-mail:
Contact: ZIEGWIED CONSTRUCTION
3923 E WOOLARD CT
COLBERT, WA 9 9005
(509) 995-1168
e-mail:
Contractor: ZIEGWIED CONSTRUCTION
3923 E WOOLARD CT
COLBERT, WA 99005
(509) 995-1168
Project 18 X 24 GARAGE
Description:
New project E]
Previous pre -app meeting El
Plan revisions
Transmittal Date:
Thursday, November 08, 2007
Project Number: 07004493
Owner: DORNAL, ART & A SUE
7808 E WOODVIEW DR
SPOKANE, WA 99212
e-mail:
Occupant:
e-mail:
Arch / Engineer.,
e-mail:
u uD.
�NIM' 0 200
D
MOdDH tM��J
Please send all plan review and project comments via e-mail to the
highlighted individuals.
CEry of
SPOKANE VALLEY BUILDING DEPARTMENT
' 117 G7 E. Spragua Atienw_ �1 Do', Spokar. Vali.y, lFti'eshington a?2Q5 - Te15Q9-Q68-DQ3S - Fa: 50? -E33 -Q037
Following is a typizal c ^_s section for a resida_nllal garag_. It mey not represent the p,-opesed project If you are using EZs dalml
as a polon of your plan su5mittal, pierse =mpiete the requested info-ma5cin in the boxes provided on both sues of iris sheet
Ths rompl:ted sh_ek a13ng v�riti any ad36on31 intorra6on ne_ds tD be submitted wI yo u apli�5an and be on site at tie time
of 4^spec5on.
PROTECTION AND OPENINGS SETWEEW
NOTE:
DWELLINGS AND PRNATE GARAGES SHALL HAVE:
Moonal wall bracing required on
Each comJ and every 25 feet of %slL
1) MATERIALS APPROVED FOR 014E HOUR FIRE
Walls within 3 feet of a property fine or
RESISTFVE CONSTRUMON ON THE GARAGE SIDE:
vlthin 6 feet of a dweMng must be 1 hour
' SW TYPE W GYP BOARD (!', SITABLE SPACE ABOVE)
ratad. (5V type W gypsum sheathing
` 112' GYP BOAP.D (RESIDENCEIATTIC, FLOORICEILING)
on both sides of wa4 Openings are not
2) OPE 114GS BETWEEN GARAGE AND PZSIDE14CE
Pam ilted in these malls. Garages over
SHALL BE EQUIPPED WITH SOLID WOOD DOOR, SOLID OR
3,0DD sq. R require p,-otec5on when
HOIJEYCOla CORE STEEL DOORS NOT LESS THAI) 1 31S', ,. , .. cias r,tt an 20 ethp tFtie property fire.
1.
" �; �) t._p`a1�,fiet's
OR 2D IAlNUTE FIRE RATED DOORS. � { � i �,IJy" R. , J
t rrczy��e mciu e3.
ALTERIJATE FOUNDATION FOR
ACCESSORY BUILDINGS FROM
40D $Q. FT. TO 3DDD SO. FT.
SECTION A -A
I 24 MIN.
a4 EBAR
(2jR'
'MIN.
"MIN.
BSA
laq 140000 - a I JAW �!C?I T fit i�ilt�R
TER SIZE MD SPACING
ROOFING MATERIAL r" y
IS"ROOFING PAPER
11 N
ROOF
SHEATHING
DOUBLE TOP PLATE
S91-9 Bu)mm BET'WEEN.TRUSS,�$. WALL HEIGHT /C
,tt (4
1�re WALL SHEATHING
O.C.
SIDING
PRESSURE TREATED
SOLE PLATE
1 �3-1/2' CONCRETE SLAB
6' MIN. '
A.. 1p
®I ANCHOR BOLTS
24' MIN. 6' MIN. 12W MIN.
• • (7' INTO CONCRETE)
'
TO. C. OR APPROVED
6'X12' ANCHOR INSTALLED
FOOTING PER 14MUFACTURER.
WALL CONSTRUCTION
TABLE 8602.10.6
"IKII l me %A/nIrUC AMn Tlr_nnWM FnPrP:q OF ALTERNATE BRACED WALL PANELS
SEISMIC DESIGN
CATEGORY AND
WINDSPEED
TIE -DOWN
FORCE (lb)
HEIGHT OF BRACED WALL PANEL
Sheathed Width
8 ft.
2'- 4"
9 ft.
2'. 8"
10 ft.
2'- 8"
ft.
3'' - 2"
ft.
3'' - 6"
SDC A, B, and C
R602.10.6.1, Item 1
1800
1800
1800
2000
2200
Windspeed < 110
mph
8602.10.6.1, Item 2
3000
3000
3000
3300
3600
SDC Do, D, and
Dz Windspeed <
R602.10.6.1, Item 1
Sheathed Width
2'. 8"
2'. 8"
2'- 8"
Note a Note a
1800
1800
1800
— —
110 mph
8602.10.6.1, Item 2
1 3000
3000
3000
— —
For SI: 1 inch = 25.4 mm, 1 foot = 304.8 mm.
a. Not permitted because maximum height is 10 feet.
EXTENT OF HEADER _
DOUBLE PORTAL FRAME (TWO BRACED WALL PANELS)
EXTENT OF HEADER I
SINGLE PORTAL FRAME (ONE BRACED WALL PANEL)
(' • MIN. 3" X 11.25" NET HEADER
qTAL 6'TO 18'FASTEN TOP PLATE TO HEADER WITH TWO TYPICAL Pj4
ROWS OF 16D SINKER NAILS AT 3' O.C. TYP. 1000 LB FRAtv1E .;
STRAP CONSTRUCTION �•{
`,•i '{ 1000 LB STRAP OPPOSITE SHEATHING FOR A PANEL SPLICE
..j Li. (IF NEEDED), PANEL
i
FASTEN SHEATHING TO HEADER WITH 8D COMMON OR I •!
•i•! EDGES SHALL BE ;
GALVANIZED BOX NAILS IN 3" GRID PATTERN AS SHOWN AND
MAX. Lj !.j• 3.O.C. IN ALL FRAMING (STUDS, BLOCKING, AND SILLS) TYP. BLOCKED, AND OCCUR .L
HEIGHT {.! •j. WITHIN 24" OF MID -
.l. HEIGHT. ONE ROW OF
{ I•j �- MIN. WIDTH = 16' FOR ONE STORY STRUCTURES TYP. SHEATHING -TO
MIN. WIDTH= 24' FOR USE IN THE FIRST OF TWO FRAMING NAILING IS �!
.i ! !• STORY STRUCTURES REQUIRED.
.;•! ' IF 2X4 BLOCKING IS "!
MIN. 2x4 FRAMING MIN.
!•' E I USED, THE 2X4'S MUST
3/8'M THICKNESS WOOD DOUBLE BE NAILED TOGETHER
{. STRUCTURAL PANEL SHEATHING 2x4 POST WITH 3 16D SINKERS
• MIN. 4200 LB TIE -DOWN DEVICE (EMBEDDED INTO
{' CONCRETE AND NAILED INTO FRAMING) i MIN. 1000 LB
�• I TIE DOWN
8602.10.6.2v�t� t -T
SEE( SECTION 1 DEVICE I !
i c
FIGURE R602.10.6.2
ALTERNATE BRACED WALL PANEL ADJACENT TO A DOOR OR WINDOW OPENING
140 2006 INTERNATIONAL RESIDENTIAL CODE°
S•1321 (3-99)
FOUNDATION PLAN
PLEASE COMPLETE THE F0LL0W14G INFORMATION AND ADD ON THE DRAWING BELOW.
BUILDING DIMENSIONS:
GARAGE OPENING AND HEADER SIZE �J X C;Z X IL-1-
INDICATE
Z
INDICATE THE LOCATION AND SIZE OF ALL WINDOWS AND DOORS ON THE PLAN.
[ CONCRETE TO COMPLY -,","TO IRC IBLE 404.1.1 (1)
FOUNDATIONVALLS - 3000 -1 PSI rp, jA r
i
SLABS, 'GARAGES, CARPOR `
& PORCHES - 3500 # P I
L-ENTIN�GS MUST BE CO .INtini IS i
Fw
�;. o
I 1 [ t) MATERIALS APPROVED F R ONE HOUR FIRE RESISTIVE �_�
x I [ CONSTRUCTION ON THE GA AGE SIDE:
❑ 5/8" TYPE "X" GYP BOARD (HABITABLE SPACE ABOVE) OR
®1/2"GYP BOARD (RESIDE CE;r1TTIC,FL0OR/CEiLRdGj
2) OPENINGS BETWEEN GAR F. AND RESIDENCE SHALL BE I -
E UIPPED WITH SOLID WOOD OOR. SOLID OR HONEYCOMB CORE
} STEEL DOORS NOT LESS THAI 1 3/8", OR 20 MINUTE FIRE RATED
1 I DOORS. [
[
�-� I—
Please note that while every effort is made to assure the accuracy of the information contained in this brochure is
not warranted for accuracy. This document is not intended to address all aspects or regulatory requirements for a
project and should serve as a starting point for your investigation. For detailed information on a particular project,
permik or code rmquimment refer direciiyy to applicable file and/or code/regulatory documents or contact the
appropriate division.
8602.10.4 Brace Wall Panel min. 48 in!— 96 in.
IZ602.10.6.1 Alternate Brace Wall Panel min.28in.-42in.
?,602.10.6.2 Alternate Brace Wall Panel min. I 6in. -24in.
Engineered Shear Wall Bracing
Lor ►y 1 ocKt, Mitttop+ K% pax> = 14)v73 r
5
\2 L�
I) LI
ic
ioca
co
1._ ..1.....'x..1.... 1:....►.. 3,4:1y t>\l�.........:
72114
scs
1
PLAT I+IG::ERPT. APPROVED
A
E.
1
r
PROVIDE DIAGRAMS AND
ENGINEERING LAYOUTS FOR
ROOF TRUSSES, BEAMS AND
FLOOR SYSTEMS PRIOR TO FRAMING
INSPECTIONS
CITY Coy
THIS BUILDING SUBJECT.
TO FIELD INSPECTION C 0ft6TIONS
REVIEWED FOR COLS CO PLIANCE
SPOKANE VALLEY" LDI DIVISION
-'M A f 0 %
For City Use Only
CITY.OF PLUS Project Number(. -ice
p
OlCane
Project Address J�71 F.—�
Valley11703 E Sprague Ave Suite B-3 ♦Spokane Valley WA 99206
491;000 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections.
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE —APPLICANT PINK — BUILDING FILE REV 9/07