Loading...
2008, 04-10 Permit App: 08001253 Garage AdditionProject Number: 08001253 Inv: I Application Date: 4/10/2008 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: 44 VOW Permit Use: ADD TO GARAGE Contact: HOMES APPEAL INC Address: PO BOX 966 C - S - Z: LIBERTY LAKE WA 99019 Setbacks: Front Left: Right: Rear: Phone: (509) 220-2673 Group Name: Site Information: Project Name: Plat Key: 001393 Name: KOKOMO TOWNSITE (FEES) District: Sout Parcel Number: 45283.5523 Block: Lot: SiteAddress: 11212 E 31ST AVE Owner: Name: CUBR, SUE ANNE DOOLITTLE Address: PO BOX 141286 Location:: CSV SPOKANE, WA 99214-1286 Zoning: R-3 SF Res District Water District: 007 MODEL Hold: ❑ Area: 9,750 Sq Ft Width: 0 Depth: 0 Right Of Way (ft): 0 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Review Information: I> Review Building Plan Review Released By. Originally Released: 4/9/2008 By: tmelbourn Landuse/Zoning/HE Conditions Released By _ Originally Released: 4/8/2008 By: tschmidt Permits: Operator: JD Printed By: jmm Print Date: 4/10/2008 Project Number: 08001253 Inv: I Application Date: 4/10/2008 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Building Permit Contractor: HOMES APPEAL INC Firm: HOMES APPEAL INC Address: PO BOX 966 Phone: (509) 220-2653 LIBERTY LAKE WA 99019 Description Grp Type Notes RES ADD R-3 VB Item Description RESIDENTIAL PERMIT FEE WSBC SURCHARGE SF PLNS RVW < 7999 SQ FT Total Project: Sa Ft Valuation 600 $56,994.00 600 $56,994.00 Fee Amount $692.75 $4.50 $277.10 $974.35 Notes: Payment Summary Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $974.35 $974.35 $0.00 $974.35 $974.35 $974.35 $0.00 $974.35 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: jmm Print Date: 4/10/2008 This Application: Sg Ft Valuation 600 $56,994.00 Totals: 600 $56,994.00 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Permit Total Fees: Total Project: Sa Ft Valuation 600 $56,994.00 600 $56,994.00 Fee Amount $692.75 $4.50 $277.10 $974.35 Notes: Payment Summary Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $974.35 $974.35 $0.00 $974.35 $974.35 $974.35 $0.00 $974.35 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: jmm Print Date: 4/10/2008 w Spokane j17alley Community Development Yermrt Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 w ww. spokaneval ley. ori PERMIT NUMBER: PERMIT FEE: Residential Construction ❑ New Construction ❑ Accessory Bldg Permit Application Addition/Remodel ❑ Deck Other: SITE ADDRESS: !!- 11 ASSESSORS PARCEL NO: ?;`yLEGAL DESCRIPTION: Building Owner: Name: Address`. City: State: Zip: Phone: _4 Fax: Contact Person Name: Phone: - 3 Describe the scope of work in detail: Proposed Use: Contractor: Name: /77G Address: City: �� State: Zip 1,9 Phone: � 3 Fax: Contractor Lic No: Exp D te: City Business Lic. No: Cost of Project: $ **************The followin2 MUST be complete: (write N/A if nota licable)********************** HEIGHT TO PEAK: DIMENSIONS: # OF STORIES:/ TOTAL HAB TABLE SPACE: �14 '30 MAIN FLOOR TO SQ. 2 FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE FTG: � • AREA: FINISHED BASEMENT GARAGE SQ. FTG: DECKICOV. PATIO SQ. FTG: 30% SLOPES ON SQ. FTG: 4�vosr PROPERTY: # OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: SEWER OR SEPTIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. SIGNATURE: DATE: 7-0 Method of Payment: ❑ Cash ❑ Check Bankcard #: Authorized Signature: REVISED 2/15/07 ❑ Mastercard ❑ VISA Expires: VIN#: 00 SCITYokane 11703 E Sprague Ave Suite B-3♦ Spokane Valley WA 99206 p♦ 509.688.0036 ♦ Fax: 509.688.0037 ,,;oAValley Completed Building and Mechanical Application with: Accurate address, Parcel Number and/or Legal Description, description of work, owner and contractor information, signature and date. Three (3) sets of plans including Site Plan, elevations, floor plans, foundation plans with details, roof plan, framing plans and details. Show the height of any proposed buildings or accessory structures. Floor plan for each floor: Dimension to scale(minimum 1/8") and label each room (including sq footage of house and garage on plans) show each level of existing house and square footage of any additions. Egress windows: Provide at least one window or exterior door approved for emergency escape or rescue from basement and in every room for sleeping. MFloor framing details: Joist type, size, spacing and installation details. 171 Roof framing plan and details Furnace and hot water heater location All header locations: type, size and connections Foundation plan F1 Insulation information ❑X Decks and Stairway details All braced wall panel types: show locations and details of installation, including engineered design Smoke detector locations 22" x 30" attic access location 18" x 24" crawl space access One-hour separation detail: between house and garage Spo�ka e� jUalley For City Use Only PLUS Project Number _ ; `� Project Address �- 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is i The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Proiect Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07 w 0 3to , 305523 y� PLANNING DEPT PROVED By DATE: 50 7- 25 1 2 c Lz11e . c ARCEL INFORMATION Help New Parcel Search Summary Sketch EventlNotices Maps Parcel Photos Print Summary w/No Graphs New -Sales Search Modify Parcel Search Seg /_Merge Taxes Permits Interactive Map All Data As Of: 03/28!2008 Parcel Number: 45283.5523 OWNER INFORMATION pwnedNarne ddress 1[Address 2 City Istate Vip lcountry CUBR, SUE ANNE DOOUTTLE jP0 BOX 141286 144 SPOKANE IWA 99214-1286 TAXPAYER INFOR�'IATION axpayedmame ddmss 1 LAddress 2 lCity Istate Imp1country CUBR, SUE ANNE DOOUTfLE PO BOX 141286 SPOKANE A 14-1286 -------- -- SITE ADDRESS INFORMATION f Parcelddress ity band Sae DescriptionIII Description ax Yea ax Code Area Status Type Non -Voted 01.18 144 2008 County General Cons Futures Real 11212E 31ST AVE SPOKANE ,750.00 re Feet Single Unit 2008 0144 Active TAX STATISTICS Tax ID Year Levy Name Levy Type Levy Rate 144 2008 County General Non -Voted 01.18 144 2008 County General Cons Futures Non -Voted 00.04 144 2008 County Lierary General Non -Voted, 00.45 144 2008 Fire District 01 Non -Voted 01.50 144 2008 Spokarte Valley Non -Voted 01.49 144 2008 State School Non -Voted 01.93 144 2008 Frre District 01 Special Voted 01.38 144 2008 SD356 Cen Valley Bpi Voted 01.48 144 2008 PMW Cen Valley General Voted 02.62 0"18: 1 1 1 1 12.08084896 CHARACTERISTICS Is there an error in the data? Click here to tell your appraisers. Half I Full /f/ 3' Y' 1 �;s�,� ���� yam- ,✓��- __ L✓, -�6w R602.10.4 Brace Wall Panel min. 48 in.— 96 in. R602.10.6.1 Alternate Brace Wall Panel min.28in.-42in. R602.10.6.2 Alternate Brace Wall Panel min. I 6in.-24in. Engineered Shear Wall Bracing Minimum depth for frost protection in the City of Spokane Valley is 24 inches measured from the bottom of the footing to finish grade. Grade slope away from building a minimum 6 inches in first 10 feet. �x� CONCRETE TO COMPLY TO IRC TABLE 404.1.1 (1) �►/ls a2�/'oC FOUNDATION WALLS - 3000 # PSI SLABS, GARAGES, CARPORTS & PORCHES - 3500 # PSI ALL FOOTINGS MUST BE CONTINUOUS 36" �,�' Gam✓ LANDING required on both sides of exit doors with min. size of 3 ft. measured in direction of travel by 3 ft. or width of door if greater, and not lower than 1 '/2 in. below threshold. Landing required at other exterior doors is a minimum size of 3 ft travel distance by width of door, and not lower than 73/4 in. below threshold provided the door does not swing over the landing. 5� Zo01 91' F -r A41 TG4 EsctS rc NG evil) I S. -4:f 4-A27144 Axr zF V Er CHyqTHING P -/CI 171C/APf-1 6,'/ 1 ve / 34..,47,,0-, Kiri, .gent portion Attic 1 entilation t per every *00 Sq Ft of with at test 50 f area. e e upper by 22' x 30' w,ctif v -ia 1 CEILING: ''/2' GWB allowed if perpendicular to rafters or trusses 24" oc and no water based texture used — otherwise 5/8" GWB. // 4.7cseri ✓��b AlthitiGR67� Anchor Bolts- Min. '/2"x 9" with 7" concrete embedment at 6' o.c. and 12" from ends of sill plates. /6" ,30N felt for ice dam protection To 2-4 '00517)6 ALA - 6,1 w Mt N 1MtcM 7��"Sg4T$ MJ Water -Resistive Barrier required under siding PROVIDE DIAGRAM'S AND ENGINEERING LAYOUTS FOR ROOF TRUSSES„IBEAMS AND FLOOR SYSTEMS PRIOR TO FRAMING INSPECTIONS CITY COPY THIS BUILDING SUBJECT TO FIELD INSPECTION CORRECTIONS Sp -M.^1 RE1/IEWED FOR Pr C MPLIANCE SPOKANE VALLEY 1301 DIPG DIVISION N` c^