2008, 04-10 Permit App: 08001253 Garage AdditionProject Number: 08001253 Inv: I Application Date: 4/10/2008 Page 1 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
44 VOW
Permit Use: ADD TO GARAGE
Contact: HOMES APPEAL INC
Address: PO BOX 966
C - S - Z: LIBERTY LAKE WA 99019
Setbacks: Front Left: Right: Rear:
Phone: (509) 220-2673
Group Name:
Site Information:
Project Name:
Plat Key: 001393 Name: KOKOMO TOWNSITE (FEES) District: Sout
Parcel Number: 45283.5523 Block:
Lot:
SiteAddress: 11212 E 31ST AVE
Owner: Name: CUBR, SUE ANNE DOOLITTLE
Address: PO BOX 141286
Location:: CSV
SPOKANE, WA 99214-1286
Zoning: R-3 SF Res District
Water District: 007 MODEL
Hold: ❑
Area: 9,750 Sq Ft Width: 0
Depth: 0 Right Of Way (ft): 0
Nbr of Bldgs: 1 Nbr of Dwellings: 1
Review Information:
I>
Review
Building Plan Review
Released By.
Originally Released:
4/9/2008 By: tmelbourn
Landuse/Zoning/HE Conditions
Released By _
Originally Released:
4/8/2008 By: tschmidt
Permits:
Operator: JD Printed By: jmm Print Date: 4/10/2008
Project Number: 08001253 Inv: I Application Date: 4/10/2008 Page 2 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Building Permit
Contractor: HOMES APPEAL INC Firm: HOMES APPEAL INC
Address: PO BOX 966 Phone: (509) 220-2653
LIBERTY LAKE WA 99019
Description Grp Type Notes
RES ADD R-3 VB
Item Description
RESIDENTIAL PERMIT FEE
WSBC SURCHARGE
SF PLNS RVW < 7999 SQ FT
Total Project:
Sa Ft Valuation
600 $56,994.00
600 $56,994.00
Fee Amount
$692.75
$4.50
$277.10
$974.35
Notes:
Payment Summary
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $974.35 $974.35 $0.00 $974.35
$974.35 $974.35 $0.00 $974.35
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: jmm Print Date: 4/10/2008
This Application:
Sg Ft Valuation
600 $56,994.00
Totals:
600 $56,994.00
Units
Unit Desc
1
SELECT
1
SELECT
1
SELECT
Permit Total Fees:
Total Project:
Sa Ft Valuation
600 $56,994.00
600 $56,994.00
Fee Amount
$692.75
$4.50
$277.10
$974.35
Notes:
Payment Summary
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $974.35 $974.35 $0.00 $974.35
$974.35 $974.35 $0.00 $974.35
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: jmm Print Date: 4/10/2008
w
Spokane
j17alley
Community Development
Yermrt Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037
w ww. spokaneval ley. ori
PERMIT NUMBER:
PERMIT FEE:
Residential Construction ❑ New Construction ❑ Accessory Bldg
Permit Application Addition/Remodel ❑ Deck
Other:
SITE ADDRESS: !!- 11
ASSESSORS PARCEL NO: ?;`yLEGAL DESCRIPTION:
Building Owner:
Name:
Address`.
City: State: Zip:
Phone: _4 Fax:
Contact Person
Name:
Phone: - 3
Describe the scope of work in detail:
Proposed Use:
Contractor:
Name:
/77G
Address:
City: �� State: Zip 1,9
Phone: � 3 Fax:
Contractor Lic No: Exp D te:
City Business Lic. No:
Cost of Project: $
**************The followin2 MUST be complete: (write N/A if nota licable)**********************
HEIGHT TO PEAK:
DIMENSIONS:
# OF STORIES:/
TOTAL HAB TABLE SPACE:
�14 '30
MAIN FLOOR TO SQ.
2 FLOOR SQ. FTG:
UNFIN BASEMENT SQ. FTG:
IMPERVIOUS SURFACE
FTG:
� •
AREA:
FINISHED BASEMENT
GARAGE SQ. FTG:
DECKICOV. PATIO SQ. FTG:
30% SLOPES ON
SQ. FTG:
4�vosr
PROPERTY:
# OF BEDROOMS:
CONSTRUCTION TYPE:
HEAT SOURCE:
SEWER OR SEPTIC?
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
SIGNATURE: DATE: 7-0
Method of Payment:
❑ Cash ❑ Check
Bankcard #:
Authorized Signature:
REVISED 2/15/07
❑ Mastercard ❑ VISA
Expires: VIN#:
00
SCITYokane 11703 E Sprague Ave Suite B-3♦ Spokane Valley WA 99206
p♦ 509.688.0036 ♦ Fax: 509.688.0037
,,;oAValley
Completed Building and Mechanical Application with: Accurate address, Parcel
Number and/or Legal Description, description of work, owner and contractor
information, signature and date.
Three (3) sets of plans including Site Plan, elevations, floor plans, foundation plans
with details, roof plan, framing plans and details.
Show the height of any proposed buildings or accessory structures.
Floor plan for each floor: Dimension to scale(minimum 1/8") and label each room
(including sq footage of house and garage on plans) show each level of existing
house and square footage of any additions.
Egress windows: Provide at least one window or exterior door approved for
emergency escape or rescue from basement and in every room for sleeping.
MFloor framing details: Joist type, size, spacing and installation details.
171 Roof framing plan and details
Furnace and hot water heater location
All header locations: type, size and connections
Foundation plan
F1 Insulation information
❑X Decks and Stairway details
All braced wall panel types: show locations and details of installation, including
engineered design
Smoke detector locations
22" x 30" attic access location
18" x 24" crawl space access
One-hour separation detail: between house and garage
Spo�ka e�
jUalley
For City Use Only
PLUS Project Number _ ; `�
Project Address �-
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is i
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Proiect Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE REV 9/07
w
0
3to ,
305523
y�
PLANNING DEPT PROVED
By
DATE:
50
7-
25 1 2
c Lz11e . c
ARCEL INFORMATION
Help New Parcel Search
Summary Sketch EventlNotices Maps Parcel
Photos
Print Summary w/No Graphs
New -Sales Search Modify Parcel Search
Seg /_Merge Taxes Permits Interactive Map
All Data As Of: 03/28!2008
Parcel Number: 45283.5523
OWNER INFORMATION
pwnedNarne
ddress 1[Address
2
City
Istate
Vip lcountry
CUBR, SUE ANNE DOOUTTLE
jP0 BOX 141286
144
SPOKANE
IWA
99214-1286
TAXPAYER INFOR�'IATION
axpayedmame ddmss 1 LAddress 2
lCity
Istate
Imp1country
CUBR, SUE ANNE DOOUTfLE PO BOX 141286
SPOKANE
A
14-1286
-------- --
SITE ADDRESS INFORMATION f
Parcelddress
ity band Sae DescriptionIII
Description
ax Yea ax Code Area
Status
Type
Non -Voted
01.18
144
2008 County General Cons Futures
Real 11212E 31ST AVE
SPOKANE ,750.00 re Feet
Single Unit
2008 0144
Active
TAX STATISTICS
Tax ID
Year Levy Name
Levy Type
Levy Rate
144
2008 County General
Non -Voted
01.18
144
2008 County General Cons Futures
Non -Voted
00.04
144
2008 County Lierary General
Non -Voted,
00.45
144
2008 Fire District 01
Non -Voted
01.50
144
2008 Spokarte Valley
Non -Voted
01.49
144
2008 State School
Non -Voted
01.93
144
2008 Frre District 01 Special
Voted
01.38
144
2008 SD356 Cen Valley Bpi
Voted
01.48
144
2008 PMW Cen Valley General
Voted
02.62
0"18:
1 1
1
1 12.08084896
CHARACTERISTICS
Is there an error in the data? Click here to tell your appraisers.
Half I Full
/f/
3'
Y'
1
�;s�,� ���� yam- ,✓��- __
L✓, -�6w
R602.10.4 Brace Wall Panel min. 48 in.— 96 in.
R602.10.6.1 Alternate Brace Wall Panel min.28in.-42in.
R602.10.6.2 Alternate Brace Wall Panel min. I 6in.-24in.
Engineered Shear Wall Bracing
Minimum depth for frost protection in the City of
Spokane Valley is 24 inches measured from the bottom
of the footing to finish grade. Grade slope away from
building a minimum 6 inches in first 10 feet.
�x�
CONCRETE TO COMPLY TO IRC TABLE 404.1.1 (1)
�►/ls a2�/'oC
FOUNDATION WALLS - 3000 # PSI
SLABS, GARAGES, CARPORTS
& PORCHES - 3500 # PSI
ALL FOOTINGS MUST BE CONTINUOUS
36"
�,�' Gam✓
LANDING required on both sides of exit doors with min. size of
3 ft. measured in direction of travel by 3 ft. or width of door if
greater, and not lower than 1 '/2 in. below threshold. Landing
required at other exterior doors is a minimum size of 3 ft travel
distance by width of door, and not lower than 73/4 in. below
threshold provided the door does not swing over the landing.
5�
Zo01
91'
F -r A41 TG4 EsctS rc NG
evil) I S. -4:f 4-A27144 Axr
zF V Er CHyqTHING
P -/CI 171C/APf-1
6,'/ 1 ve /
34..,47,,0-,
Kiri,
.gent
portion
Attic 1 entilation
t per every *00 Sq Ft of
with at test 50
f area.
e
e upper
by 22' x 30'
w,ctif v -ia 1
CEILING: ''/2' GWB allowed if
perpendicular to rafters or trusses
24" oc and no water based texture
used — otherwise 5/8" GWB.
// 4.7cseri ✓��b
AlthitiGR67�
Anchor Bolts- Min. '/2"x 9"
with 7" concrete embedment
at 6' o.c. and 12" from ends
of sill plates.
/6"
,30N felt for ice
dam protection
To 2-4 '00517)6
ALA -
6,1
w
Mt N 1MtcM
7��"Sg4T$ MJ
Water -Resistive
Barrier required
under siding
PROVIDE DIAGRAM'S AND
ENGINEERING LAYOUTS FOR
ROOF TRUSSES„IBEAMS AND
FLOOR SYSTEMS PRIOR TO FRAMING
INSPECTIONS
CITY COPY
THIS BUILDING SUBJECT
TO FIELD INSPECTION CORRECTIONS
Sp -M.^1
RE1/IEWED FOR Pr C MPLIANCE
SPOKANE VALLEY 1301 DIPG DIVISION
N` c^