Loading...
16-091.13 Meridian Construction: City Hall lie c IS Architects West Inc. SPOKANE VALLEY CITY HALL ??0 Archilochus Architecture • Landscape Architecture C HA N G E ORDER-013 r 441� , Y Issue Date: 5/26/2017 `Rt teat 'kg' 1 ar r .1C rr {(t iatnry PROJECT OWNER CONTRACTOR DISTRIBUTION X Spokane Valley City Hall City of Spokane Valley Meridian Construction Doug Powell a X 10210 E.Sprague 11707 E.Sprague Ave. 12310 E Mirabeau Parkway Mark D'Agostino X Spokane Valley,WA 99206 Suite 106 Suite 100 Steve Roth X Spokane Valley,WA 99206 Spokane Valley,WA 99216 Jim Paras X CONTRACT FOR: GENERAL CONSTRUCTION Todd Ottmar X CONTRACT DATE: 5-20-2016 You are hereby directed to make the following changes in the contract: REFERENCE DESCRIPTION AMOUNT COP-088R1 Site Sculptures $23,526.16 PR-029 R2 COP-092 Fir Tree Removal $1,732.03 COP-094 Added Gate Scope $1,951.12 RFI-122 TOTAL $27,209.31 The Original Contract Sum was: $9,742,700.00 Net Change by Previously Authorized Chime Orders: $153,658.48 The Contract Sum prior to this Change Order was: $9,896,358.48 The Contract Sum will be increased by this Change Order in the amount of: $27,209.31 The new Contract Sum including this Change Order will be: $9,923,567.79 The Contract time will be unchanged/Changed by: 0 days The Date of Substantial Completion as of the date of this Change Order therefore Is: 8/31/2017 ARCHITECT CONTRACTOR OWNER REPRESENTATIVE Architects West,Inc. Meridian Construction City of Spokane Valley 210 E.Lakeside Ave. 12310 E.Mirabeau Parkway,Ste 100 11707 E.Sprague Ave.,Suite 106 Coeur d'Alene,ID 83814 Spokane Valley,WA 99216 Spokane Valley,WA 99206 SIGNATURE: SIGNATURE: SIGNATURE: 14.katit,„„,DATE: 5/26/2017 DATE: /e...ict 1 DATE: /c1 f ('(? 1509—SPOKANE VALLEY CITY HALL CHANGE ORDER-013 —5/26/2017 Page 1 of 1 210 East Lakeside Avenue I Coeur d'Alene,Idaho 83814 I ph 208-667-9402 I fx 208-667-6103 I www.architectswest.com 1