Loading...
2008, 10-07 Permit App: 08003960 PoolProject Number: 08003960 Inv: I Application Date: 10/7/2008 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Parcel Number: 45341.1904 Block: 5 Lot: 4 SiteAddress: 13108 E 36TH AVE Owner: Name: CHARLES, LEIGH M & MATHIAS Address: 13108 E 36TH AVE Review Building Plan Review Originally Released: Landuse/Zoning/HE Conditions Released By: 10/7/2008 By: tmelbourn Released By: Originally Released: 10/7/2008 By: tschmidt Permits: Plumbing Permit Contractor: AARON'S POOLS Firm: AARON'S POOLS Address: 14904 E RICH Phone: (509) 218-1473 SPOKANE VALLEY WA 99216 Item Description Units Unit Desc Fee Amount MISCELLANEOUS FIXTURES 1 NUMBER OF $6.00 Permit Total Fees: $6.00 Operator: jmm Printed By: jmm Print Date: 10/7/2008 Project Number: 08003960 Inv: I Application Date: 10/7/2008 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Swimming Pool — Contractor: AARON'S POOLS Firm: AARON'S POOLS Address: 14904 E RICH Phone: (509) 218-1473 SPOKANE VALLEY WA 99216 Item Description Units Unit Desc Fee Amount SWIM POOL > 5000 GAL 1 SELECT $50.00 WSBCC SURCHARGE 1 SELECT $4.50 Permit Total Fees: $54.50 Notes:u.H,,, ww ;w .,aN ��..... ,. . PaymentSummary: 3 Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Plumbing Permit $6.00 $6.00 $0.00 $6.00 Swimming Pool $54.50 $54.50 $0.00 $54.50 $60.50 $60.50 $0.00 $60.50 Disclaimer. Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 10/7/2008 00 Spokane jVa1ky' Community Development Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 www.Mokanevalley.org Residential Construction OCT C J 2006 Permit Application SITE ADDRESS: /s/0 PERMIT NUMBEg - j� - PERMIT FEE: ❑ New Construction ❑ Addition/Remodel ❑ Other: ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Building Owner: Name: f Address`. 1-3 �. City: DI<c3M c State: Zip: 1 Phone/1 Fax: Contact Person Name: Phone: Describe the scope of work in detail: ❑ Accessory Bldg ❑ Deck Contractor: DIMENSIONS: Name: HABITABLE SPAC ' Address: 4� City: E, State: Zip: Phone: Fax: Contr or Lic No� n / Exp Date: City Business Lic. No: d/7q Cost of Project: $ Proposed Use: **************ThP fnllnwinu MTTST he complete: (write N/A if not aUplicable)********************** HEIGHT TO PEAK: _ DIMENSIONS: # OF STORIES: HABITABLE SPAC ' N t4TOTAL MAIN FLOOR TO SQ. 2 FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: ' IMPERVIOUS SURFACE AREA: FTG: d/7q *4 0 FINISHED BASEMENT GARAGE SQ. FTG -.,v.# DECK/COV. PATIO SQ. FTG, Z 30% SLOPES ON SQ. FTG:Tf-'��► PROPERTY: # OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: SEWER OR SEPTIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Cent 5) This Cit of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinapC ans or a i I information may be required to be submitted, and subsequently approved before this application can be pr ce sed. SIGNATURE: Method of Payment: Cash ❑ Check Bankcard #: Authorized Signature: REVISED 2/15/07 ❑ Mastercard ❑ VISA Expires: VIN#: RESIDENTIAL CHECK LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. ❑ SITE PLAN ❑ Property lines and dimensions ❑ Setbacks to property lines ❑ Direction arrow pointing North and orientation to streets ❑ Distance between buildings ❑ Proposed/existing buildings (footprint and dimensions) ❑ Right of way/easement location & sizes ❑ Utilities, septic tank/drain field locations and distances ❑ Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) ❑ Elevations (Front/Rear/Sides) with roof peak and wall height including basement: ❑ Foundation Plan (crawlspace, basement or slab on grade): ❑ Footing sizes and locations ❑ Supporting wood cripple walls or beams ❑ Perimeter concrete foundation wall sizes ❑ Thickened concrete pads supporting ❑ Crawlspace ventilation beams or girder trusses ❑ Floor Plan of each level (finished or unfinished) with dimensions: ❑ Floor Joist direction, size and spacing ❑ Window and door location and sizes ❑ Header, beam or concrete lintel sizes ❑ Window well locations if applicable ❑ Brace wall panel locations ❑ Room usage labels ❑ Water heater and furnace locations ❑ Smoke detector locations ❑ Exhaust fan locations ❑ Attic and crawl space access locations ❑ Deck or concrete patio sizes and locations ❑ Fire Wall construction ❑ Roof Plan: ❑ Engineered truss direction and spacing ❑ Rafter and over frame direction, size and spacing ❑ Wall Section Detail including: Roof ❑ Slope/ roofing material/ underlayment/ ice dam protection ❑ Sheathing size and type Ceiling ❑ Joist size and spacing Wall ❑ Height/ top plate/ stud size and spacing/ sole plate ❑ Exterior sheathing size and type Floor ❑ Joist size and spacing Foundation Wall ❑ Concrete or Masonry unit width ❑ Earth to wood separation distance Footing ❑ Size Radon ❑ Passive system with Emil vapor barrier Miscellaneous Construction Details ❑ Deck: ❑ Floor plan/ side view/ dimensions ❑ Floor Joist/ decking direction, size and spacing ❑ Stairway tread rise & run and nosing ❑ Ridge, eave and valley lines ❑ Beam and girder size and location ❑ Truss or rafter size, spacing & connection ❑ Attic insulation/ air space baffle/ ventilation ❑ Size of ceiling gypsum wall board ❑ Siding/ exterior house wrap/ anchor bolts ❑ Insulation, vapor barrier, gypsum wall board ❑ Sheathing or concrete floor size/ insulation ❑ Footing bottom to finished ground level depth ❑ Horizontal & vertical reinforcement if any ❑ Reinforcement if any ❑ Active system with 6 mil vapor barrier ❑ Footings/ post/ and beam size and locations ❑ Handrail / Guard height & spacing Permit Center S"`1SRne 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 PERMIT NUMBER: (509)688-0036 FAX: (509)688-0037 PERMIT FEE: Community Development www.snokanevallev.ors Plumbing Permit Application ❑ Commercial ❑ Residential SITE ADDRESS: Building Owner 5 NSTALLATION, ALTERATION, REPAIR, Name: et` C7 /, Phone: 63 _ Fax: Address: 3 D `FLs City: State: 4 Zip: Contractor REVERSALS X Name: S - Phone: S� 02 j N73 Fax: Address:At 1 City: �c�� State: Zip: �T>2 License No: C— City Busin s Lic: Contact TUBS Name: Phone: gel — ? 75 METHOD OF PAYMENT: ❑CASH ❑ CHECK ❑ VISA ❑ MC Card# AUTHORIZED SIGNATURE: REVISED 8/26/05 EXPIRES: VIN: I TOTAL PERMIT FEE DUE: I I DESCRIPTION OF WORK NSTALLATION, ALTERATION, REPAIR, # OF UNITS X COST - 1 TOILETS WATER CLOSET, BIDETS REVERSALS X $6.00 - 2 URINALS 15 SEWAGE EJECTOR X $6.00 = 3 TUBS X $6.00 - 4 SHOWERS PER TRAP BATH, STALL, ON-SITE BUILT X $6.00 - 5 SINKS LAVS/BASINS, BAR, FLOOR, KITCHEN, LAUNDRY, UTILITY, JANITOR, PHOTO, X-RAY, FOOD, PREP/CULINARY MEAT = X $6.00 = 6 DISHWASHER X $6.00 - 7 CLOTHES WASHER X $6.00 - 8 GARBAGE DISPOSAL VACUUM BREAKER, CHECK VALVE, X $6.00 = 9 WATER SOFTENER AND R.P.B.P.D. FOR: VATS, TANKS, X $6.00 - 10 ELECTRIC WATER HEATER NOTE: IF GAS, SEE MECHANICAL CROSS CONNECTION DEVICE X $6.00 = 1 FLOOR DRAINS AREA, CASE, COIL, TRENCH, CONDENSATE X $6.00 = 2 ROOF DRAINS/OVERFLOW DRAINS X $6.00 = METHOD OF PAYMENT: ❑CASH ❑ CHECK ❑ VISA ❑ MC Card# AUTHORIZED SIGNATURE: REVISED 8/26/05 EXPIRES: VIN: I TOTAL PERMIT FEE DUE: I I WATER PIPING/DRAIN-IN WASTE, NSTALLATION, ALTERATION, REPAIR, 14 VENT, PLUMBING, REVERSAL REVERSALS X $6.00 - 15 SEWAGE EJECTOR GRINDER, SUMP PUMP X $6.00 - ICE AN/OR COFFEE MAKER, HOSE BIB, 16 WATER USING DEVICE STEAMER X $6.00 = PROOFER, CARBONATOR, SWAMP COOLER VACUUM BREAKER, CHECK VALVE, AND R.P.B.P.D. FOR: VATS, TANKS, 17 CROSS CONNECTION DEVICE BOILERS X $6.00 - GREASE TRAP, SAND TRAP, 18 INTERCEPTORS CHEMICAL HOLDING TANK X $6.00 - 19 MEDICAL GAS(per outlet NITROUS, OXYGEN X $6.00 = 20 MISCELLANEOUS PLUMBING FIXTURE X $6.00 = 21 PRIVATE SEWAGE DISPOSAUSYS X $20.00 = 22 INDUSTRIAL WASTE INTERCEPTOR X $15.00 = METHOD OF PAYMENT: ❑CASH ❑ CHECK ❑ VISA ❑ MC Card# AUTHORIZED SIGNATURE: REVISED 8/26/05 EXPIRES: VIN: I TOTAL PERMIT FEE DUE: I I DI AAIAIIAIP- n\TA N I� Spoll�an� e Valley For City Usely PLUS Project Number 39 (o D Project Address /5/4)<? F -3&/ 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. 0110 Your application review TARGET DATE is / The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07