2010, 08-13 Permit App: 10002466 Finish Basement v ;
Project Number: 10002466 Inv: 1 Application Date: 8/13/2010 Page 1 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: FINISH PORTION OF BASEMENT Contact: DALES MANITENANCE
Address: 11323 E DISHMAN MICA RD
C-S-Z: SPOKANE,WA.99206
Setbacks:Front Left: Right: Rear: Phone: (509)924-3438
Group Name:
Site Information: Project Name:
Plat Key: Name: Range District: Sout
Parcel Number: 45342.2205 Block: Lot:
SiteAddress: 12734 E 37TH LN Owner:Name: SCHMITZ,CLIFFORD M&MARG
Address: 16520 E SECRETARIAT LN
Location::CSV VERADALE,WA 99037-
Zoning: R-3 SF Res District
Water District: 007 MODEL Hold: ❑
Area: 9,057 Sq Ft Width: 40 Depth: 97 Right Of Way(ft): 30
Nbr of Bldgs: 1 Nbr of Dwellings: 1
Review Information:
Review
Building Plan Review Released By:
Originally Released: 8/12/2010 By: tmelbourn
Permits:
Building Permit
Contractor: DMI REMODELING Firm: DMI REMODELING
Address: 11323 E DISHMAN MICA Phone: (509)924-3438
SPOKANE VALLEY WA 99206
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation
BASEMENT R R-3 VB BU 0 $6,000.00 0 $6,000.00
Totals: 0 $6,000.00 0 $6,000.00
Item Description Units Unit Desc Fee Amount
RESIDENTIAL PERMIT FEE 1 SELECT $125.25
WSBCC SURCHARGE 1 SELECT $4.50
SF PLNS RVW<7999 SQ FT 1 SELECT $50.10
Permit Total Fees: $179.85
Operator: JD Printed By: JD Print Date: 8/13/2010
a
Project Number: 10002466 Inv: 1 Application Date: 8/13/2010 Page 2 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Notes:
Payment Summary:
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $179.85 $179.85 $50.10 $129.75
$179.85 $179.85 $50.10 $129.75
Disclaimer:
Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information
contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: JD Print Date: 8/13/2010
Scarr (Staff Use Only)
pokane PERMIT NUMBER:
Valley. PERMIT FEE:
CITY OF SPOKANE VALLEY
Community Development Department
Permit Center
11703 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Tel: (509) 688-0036
Fax: (509) 688-0037
permitcenterAspokanevalley.orq
RESIDENTIAL CONSTRUCTION PERMIT APPLICATION
Ej NEW CONSTRUCTION ADDITION/REMODEL EI ACCESSORY BUILDING
DECK LJ OTHER
SITE ADDRESS:12734 E. 37TH
ASSESSORS PARCEL NO.: LEGAL DESCRIPTION:
BUILDING OWNER NAME:
NAME:INGE KLEP
ADDRESS:12734 E. 37TH
CITY:SPOKANE VALLEY STATE:WA ZIP:99206
PHONE:509-924-3438 FAX:509-922-3192 CELL:
CONTACT NAME:WADE
PHONE:509-924-3438 FAx:509-922-3192 cELL:509-990-5529
CONTRACTOR NAME:DMI REMODELING
MAILING ADDRESS:1 1323 E. DISHMAN MICA RD
CITY:SPOKANE VALLEY STATE:WA ZIP:99206
PHONE:509-924-3438 FAx:509-922-3192 CELL:509-990-
5529
CONTRACTOR LICENSE No.:DMIRER*902D5 EXPIRES:02/28/2011 CITY BUSINESS
LICENSE No.:601 002 531
DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE:
FINISH BASEMENT FIR OUT WALLS,CEILING,WINDOW, DUCTWORK,ADD WALL&DOOR, HANG-TAPE-
TEXTURE DRYWALL IN REC RM&STAIRWAY. DRYWALL WRAPPED WINDOW&BEAM, PRE-FINSHED
CASING/BASE IN REC ROOM W/PRE-HUNG,PRE-FINISHED HOLLOW CORE DOOR. ELECTRICAL LABOR
WIRE NEW OUTLETS IN BASEMENT,ADD WATERSOFTENER CIRCUIT RELOCATE LIGHTS.
Effective October 28, 2007 Page 1 of 3
http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/Residential Construction Permit
App.1.doc
•
PROPOSED USE:
Effective October 28, 2007 Page 2 of 3
http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/Residential Construction Permit
App.1.doc
****YOU MUST COMPLETE THE FOLLOWING****
MARK N/A IF NOT APPLICABLE
Height to Peak:N/A Dimensions: No. of Stories:N/A Total Habitable
Space:
Main Floor SQ FT:N/A Upper Floor SQ Unfinished Basement Finished Basement
FT:N/A SQ FT:133 SQ FT:342 p (L
Garage SQ FT:N/A Deck/Covered Patio Impervious Surface 30% Slopes on
SQ FT:N/A Area: n j fl Property:N/A
No. of Bedrooms:0 Construction1 Heat Source:GFA Sewer or
Type: (`emit 1 W Septic:SEWER
TOTAL COST OF PROJECT: $6,000
DISCLAIMER
The permitted verifies,acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling,the dwelling is/will
be served by potable water. 2)Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory Is the property
owner or has permission to represent the property owner in this transaction. 4) All construction Is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may be required to be submitted and subsequently approved before this application can be processed.
Signature Date:
Method of payment: 0 Cash 0 Check 0 Visa 0 Mastercard
Bankcard #: EXP: VIN#:
Authorized Signature:
Effective October 28, 2007 Page 3 of 3
http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/Residential Construction Permit
App.1.doc
For City Use Only
SCITY OF :, iln PLUS Project Number
pokineProject Address
a Q
B
11703 E Sprague Ave Suite -3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is I 6
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re-submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure,you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone,fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re-
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre-construction meetings (if required)will be provided by
the Permit Specialist at that time.
WHITE—APPLICANT PINK—BUILDING FILE REV 9/07