Loading...
2009, 11-16 Permit App: 09003628 Residence Project Number: 09003628 Inv: I Application Date: 11/16/2009 Page 1 of 3 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Permit Use: NEW SFR-SEWER Contact: CLIFF SCHMITZ CONSTRUCTION Address: 16520 E.SECRETARIAT C-S-Z: VERADALE,WA 99037 Setbacks:Front Left: Right: Rear: Phone: (509)922-4297 Group Name: Project Name: Site Information: Plat Key: Name: Range District: Sout Parcel Number: 45342.3417 Block: Lot: SiteAddress: 13005 E 39TH LN Owner:Name: CLIFF SCHMITZ CONSTRUCTIO Address: 16520 E SECRETARIAT Location::CSV VERADALE,WA 99037 Zoning: R-3 SF Res District Water District: 007 MODEL Hold: ❑ Area: 8,125 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: � r; ��... _ �, _ ,�^ ... Review Building Plan Review Released By: Originally Released: 11/16/2009 By: tmelbourn Landuse/Zoning/IE Conditions Released By: Originally Released: 11/16/2009 By: mharnois Sewer ReviewI Released By: j Operator: jmm Printed By: jmm Print Date: 11/16/2009 Project Number: 09003628 Inv: 1 Application Date: 11/16/2009 Page 2 of 3 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Building Permit Contractor: CLIFF SCHMITZ Firm: CLIFF SCHMITZ CONSTRUCTIO Address: 16520 E SECRETARIAT Phone: (509)922-4297 VERADALE WA 99037 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation 1&2 FAMILY R-3 VB 961 $93,053.63 961 $93,053.63 2ND FLOOR R-3 VB 682 $50,931.76 682 $50,931.76 GARAGE U-1 VB 703 $13,357.00 703 $13,357.00 Totals: 2,346 $157,342.39 2,346 $157,342.39 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE I SELECT $1,318.55 WSBCC SURCHARGE 1 SELECT $4.50 SF PLNS RVW<7999 SQ FT 1 SELECT $527.42 Permit Total Fees: $1,850.47 Mechanical Permit Contractor: C&K PLUMBING Firm: C&K PLUMBING Address: 5231 W NAVAJO Phone: (509)489-3906 SPOKANE,WA 99208 Item Description Units Unit Desc Fee Amount GAS WATER HEATER 1 NUMBER OF $11.00 GAS APPLIANCE<=100,000BTU 1 NUMBER OF $13.00 GAS PIPING 2 #OF UNITS $2.00 HOOD-TYPE I 1 NUMBER OF $52.00 VENTILATION SYSTEM 4 NUMBER OF $52.00 Permit Total Fees: $130.00 Plumbing Permit Contractor: C&K PLUMBING Finn: C&K PLUMBING Address: 5231 W NAVAJO Phone: (509)489-3906 SPOKANE,WA 99208 Item Description Units Unit Desc Fee Amount TOILETSBIDETS 3 NUMBER OF $18.00 SINKS 5 NUMBER OF $30.00 TUBS 2 NUMBER OF $12.00 DISH WASHERS 1 NUMBER OF $6.00 GARBAGE DISPOSAL 1 NUMBER OF $6.00 CLOTHES WASHER 1 NUMBER OF $6.00 MISCELLANEOUS FIXTURES 3 NUMBER OF $18.00 Permit Total Fees: $96.00 Operator: jmm Printed By: jmm Print Date: 11/16/2009 • Project Number: 09003628 Inv: 1 Application Date: 11/16/2009 Page 3 of 3 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $1,850.47 $1,850.47 $471.47 $1,379.00 Mechanical Permit $130.00 $130.00 $0.00 $130.00 Plumbing Permit $96.00 $96.00 $0.00 $96.00 $2,076.47 $2,076.47 $471.47 $1,605.00 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 11/16/2009 , Permit Center PERMIT NUMBER: :v(� �TiY a 11703 E Sprague Ave,Suite B-3 Spokane Valley,WA 99206' ` PERMIT FEE: jley4 (509)688-0036 F : (509)688-0037 , k permitcenter@spo anevalley.org= Community Development I t. onstruct3on AccessoryBldg Residential Construction 4 �� � �'�, _ ❑ Permit Application =Yui , ' di" Az 'tlel n Deck __ �� Other:_.__- c:f°orrn at —_ SITE ADDRESS: D/ • V, Z ASSESSORS PARCEL NO: LEGAL DESCRIPTION: J� I" I /7 4 LK J P i AtaocK R 119% Building Owner: Contractor: Name: Name: b L t r F .S r I J I l i TZ. ST .Tho C.— Address: Address: n i 005- ,0 6,, 5 6 c iec Trcri 4 City: State: Zip: City: (�j Gil�r 1 lam - State: tAm Zip: 4,07' Phone: Fax: Phone: -50 S'- �Iq�77 _ SUS'-`3z%-SC-06 Contractor Lic No: Exp Date: Contact Person City Business Lic.No: Name: e,I..l p 1v S LI~(->'►'1 Mt- Phone: 4 C4(4–'7'7 33 Describe the scope of work in detail: Cost of Project: $ /,y0 ,—, oo ikJ eU ) s l 064 E_ Proposed Use: IZS I Uf',A Le **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: DIMENSIONS:3 #OF STORIES:S: TOTAL.� HABITABLE'`3SPACE: .�� 9T MAIN FLOOR TO SQ. 2Nu FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: AREA:IMPERVIOUS SURFACE FTG: FINISHED BASEMENT GARAGE SQ. F G: DECK/COV. PATIO SQ. FTG: 30% SLOPES ON SQ. FTG: u A_ 7a 3 - PROPERTY: - #OF BEDR OMS: CONSTRUCTION TYPE: HEAT SlOUnR�CE: SEWER SEPTIC? 3 The permitee verifies,acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) his City • Spokane Valley Permit is not a permit or approval for any violation of federal,state or local laws,codes or ordinan -s • .ns o :dditional information may be required to be submitted,and subsequently approved before this application cair n be -s:- SIGNATURE: ! DATE: ii_ 9-6 Method of Payment: 0 Cash 0 Che k 0 Mastercard ❑ VISA Bankcard#: Expires: VIN#: Authorized Signature: REVISED 2/15/07 CI ItC1 • crry 11703E Sprague Ave,Suite B-3 PERMIT NUMBER: ()Spokane ��` Spokane Valley,WA 99206 (509)688-0036 FAX:(509)688-0037 PERMIT FEE: permitcenter n,spokanevallev.orR Community Development Plumbing Permit Application 1:1Commercial RI Residential SITE ADDRESS: _ I J Dt) r. 341"4 Building Owner Name: Phone: Fax: Address: City: State: Zip: Contractor Name: l .C K ,D�� � ) nO 6 Phone: Fax: Address: City: State: Zip: License No: City Business Lic: Contact/Project Manager: Name: Phone: #OF UNITS PLUMBING FIXTURE ON A TRAP TOILETS 3 URINALS Z TUBS SHOWERS(per trap) Lay/Basins,Bar,Floor,Kitchen,Laundry,Utility,Janitor,Photo,X-ray,Food, SINKS Prep/Culinary Meat DISHWASHER CLOTHES WASHER GARBAGE DISPOSAL J WATER SOFTNER FLOOR DRAIN Area,Case,Coil,Trench,Condensate ROOF DRAIN/OVERFLOW DRAINS FOUNTAIN,DRINKING WATER PIPING/DRAIN-IN WASTE Installation,Alterations,Repair,Reversals WATER USING DEVICE Ice and/or Coffee maker,hose bib,steamer proofer,carbonator,swamp cooler 3 PRIVATE SEWAGE DISPOSAL SYSTEM WATER HEATER If Gas,See Mechanical INDUSTRIAL WASTE PRETREATEMENT INCEPTORS Including traps,vents except kitchen type grease interceptors functioning as fixture traps REPAIR OR ALTERATION Water piping,drainage or vent piping ATMOSPHERIC TYPE VACUUM BREAKER BACK FLOW PROTECTIVE DEVICE Other than atmospheric type vacuum breakers MEDICAL GAS INCEPTORS OCASH 0 CHECK 0 VISA 0 MC EXPIRES: Card# VIN: SIGNATURE: CURRENT FEES AVAILABLE AT:http:llwww.spokanevallev.ora/under the quick links for Forms,Master Fee Schedule. http://wwwspokanevalley.org/uploads/Community_Development/Documents/Forms/Building/PlumbingPermitApplication040309.doc tm���"��0 11703 E Sprague Ave,Suite B-3 PERMIT NUMBER: 1fAl1G Spokane Valley,WA 99206 (509)688-0036 FAX:(509)688-0037 PERMIT FEE: Community Development permitcenter@,spokanevalley.org Mechanical Permit Application (1 Commercial LI Residential SITE ADDRESS: 13065— e, 34 Building Owner Name: Phone: Fax: Address: City: State: Zip: Contractor C t. K PLW 1 6(►' Name: Phone: Fax: Address: City: State: Zip: License No: City Business Lic: Contact/Project Manager: Name: Phone: qqq_-2",3.3 #UNITS FURNACES&SUSPENDED HEATERS-INSTALLATION OR RELOCATION Up to&including 100,000 BTU FURNACES&SUSPENDED HEATERS-INSTALLATION OR RELOCATION Over 100,000 BTU DUCT WORK SYSTEM HEAT PUMP/AIR CONDITIONER 0-3 TON AIR CONDITIONER Over 3-15 TON AIR CONDITIONER Over 15-30 TON AIR CONDITIONER Over 30-50 TON AIR CONDITIONER Over 50 TON GAS WATER HEATER GAS PIPING SYSTEM(each outlet) Ai 2- GAS LOG,FIREPLACE,&GAS INSERT APPLIANCE VENTS INSTALLATION,RELOCATION,REPLACEMENT REPAIRS OR ADDITIONS BOILER,COMPRESSORS,ABSORPTIONS SYSTEM 0 to 3 hp-100,000 BTU or less BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 3-15 hp—100,001 to 500,000 BTU BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 15—30 hp -500,001 to 1,000,000 BTU BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 30 hp—1,000,001 to 1,750,000 BTU BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 50 hp—over 1,750,000 BTU AIR HANDLER(DOES NOT include ducting) Each unit up to 10,000 cfm,including ducts AIR HANDLER(DOES NOT include ducting) Each unit over 10,000 cfm EVAPORATIVE COOLERS(other than portables) VENTILATION AND EXHAUST Each fan connected to a singe duct VENTILATION AND EXHAUST Each ventilation system VENTILATION AND EXHAUST Each hood served by mechanical exhaust INCINERATORS Installation or relocation of residential INCINERATORS Installation or relocation of commercial APPLIANCES Range,Clothes Washer UNLISTED APPLIANCES Under 400,000 BTU UNLISTED APPLIANCES Over 400,000 BTU HOOD )&CL In t" tv\((, b Type I Ic HOOD Type II L P STORAGE TANK WOOD OR PELLET STOVE INSERT WOOD STOVE SYSTEM—FREE STANDING EXPIRES: VIN: ['CASH 0 CHECK ❑VISA ❑MC SIGNATURE CARD#: http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/MechanicalPermitApplication040309.doe jl 65.00• N 5,125 vitt s La i o 0 17 0 Bi-\c z _In in izo 0 II• 1305 E — cL7e- 6 A 39th ' 7` 35 • ••00 3914\ . .....—..... 0111111. LANE . spiegtmoetft _ i f'► _________, . _ S , rCV i3 ,, OVED 7sv,„ Is CENTER PLANNING DEPT' AppR , I } B DAT • '� For City Use On PLUS Project Number ) `. :> CITY OF • Project Address (,) `- . 3`7� Spokane a Q ° 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037♦ permitcenter®spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review > Submit complete, accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. > Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal.This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE-APPLICANT PINK-BUILDING FILE REV 9/07