Loading...
2010, 09-29 Permit App: 10002971 Residence • Project Number: 10002971 Inv: 1 Application Date: 9/29/2010 Page 1 of 3 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: SFR W/ATT GAR Contact: GARCO CONSTRUCTION Address: 4114 E BROADWAY AVE C-S-Z: SPOKANE WA 99202 Setbacks:Front Left: Right: Rear: Phone: (509)535-4688 Group Name: Site Information: Project Name: Plat Key: Name: Range District: Sout Parcel Number: 45342.3514 Block: Lot: SiteAddress: 13008 E 39TH LN Owner:Name: CCS FOUNDATION Address: 501 RIVERPOINT BLVD Location::CSV SPOKANE WA 9217 Zoning: R-3 SF Res District Water District: 011 MODERN Hold: ❑ Area: 8,953 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review In ormation: ::: . Review Building Plan Review Released By: Originally Released: 9/28/2010 By: tmelbourn Landuse/Zoning/HE Conditions Released By: Originally Released: 9/20/2010 By: MPALANIU Sewer Review Released By: Permits: rc , n,a.._ rvm„ .:w. 4V.,..... ,444 .. . -. : . -... .a . a...,, , Operator: JD Printed By: JD Print Date: 9/29/2010 • Project Number: 10002971 Inv: 1 Application Date: 9/29/2010 Page 2 of 3 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Building Permit Contractor: GARCO CONSTRUCTION Firm: GARCO CONSTRUCTION Address: P.O.BOX 2946 Phone: (509)535-4688 SPOKANE,WA 99220-2946 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation 1&2 FAMILY R-3 VB 1,539 $152,284.05 1,539 $152,284.05 BASEMENT U R-3 VB 1,539 $23,085.00 1,539 $23,085.00 COV DECK R-3 VB 216 $3,240.00 216 $3,240.00 DECK OPEN R-3 VB 213 $3,195.00 213 $3,195.00 GAR WOOD U-1 VB 557 $10,583.00 557 $10,583.00 Totals: 4,064 $192,387.05 4,064 $192,387.05 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $1,514.55 WSBCC SURCHARGE 1 SELECT $4.50 SF PLNS RVW<7999 SQ FT 1 SELECT $605.82 Permit Total Fees: $2,124.87 Mechanical Permit Contractor: GARCO CONSTRUCTION Firm: GARCO CONSTRUCTION Address: P.O.BOX 2946 Phone: (509)535-4688 SPOKANE,WA 99220-2946 Item Description Units Unit Desc Fee Amount DUCT WORK SYSTEM 1 NUMBER OF $11.00 GAS WATER HEATER 1 NUMBER OF $11.00 GAS APPLIANCE<=100,000BTU 1 NUMBER OF $13.00 GAS PIPING 4 #OF UNITS $4.00 AIR CONDITIONER:4-15 TONS 1 NUMBER OF $21.00 VENTILATING FANS 1 DUCT 6 NUMBER OF $66.00 CLOTHES DRYER 1 NUMBER OF $10.00 RANGE 1 NUMBER OF $10.00 GAS LOG OR GAS INSERT 1 NUMBER OF $11.00 Permit Total Fees: $157.00 Operator: JD Printed By: JD Print Date: 9/29/2010 • Project Number: 10002971 Inv: 1 Application Date: 9/29/2010 Page 3 of 3 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Plumbing Permit Contractor: GARCO CONSTRUCTION Firm: GARCO CONSTRUCTION Address: P.O.BOX 2946 Phone: (509)535-4688 SPOKANE,WA 99220-2946 Item Description Units Unit Desc Fee Amount TOILETSBIDETS 2 NUMBER OF $12.00 SINKS 5 NUMBER OF $30.00 SHOWERS 2 NUMBER OF $12.00 TUBS 2 NUMBER OF $12.00 DISH WASHERS 1 NUMBER OF $6.00 GARBAGE DISPOSAL 1 NUMBER OF $6.00 CLOTHES WASHER 1 NUMBER OF $6.00 FLOOR DRAINS 1 NUMBER OF $6.00 INTERCEPTORS 1 NUMBER OF $6.00 Permit Total Fees: $96.00 Pa ment Summa _ Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $2,124.87 $2,124.87 $603.58 $1,521.29 Mechanical Permit $157.00 $157.00 $0.00 $157.00 Plumbing Permit $96.00 $96.00 $0.00 $96.00 $2,377.87 $2,377.87 $603.58 $1,774.29 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: JD Print Date: 9/29/2010 Community Development Department (Staff Use Only) Permit Center clT1 c / 11703 East Sprague Avenue,Suite B-3 PERMIT NUMBER: i ©--Z°`ly Spokane Valley,WA 99206 Spokane Tel: (509) 688-0036 PERMIT FEE: Valley Fax: (509)688-0037 J" ill lc_..ter:; solkC ne-a.E`..4ti k RESIDENTIAL CONSTRUCTION PERMIT APPLICATION ,(NEW CONSTRUCTION ❑ ADDITION/REMODEL ❑ ACCESSORY BUILDING ❑ DECK ❑ OTHER SITE ADDRESS: 13oo$ 5-, '3qkL- J e• ASSESSORS PARCEL NO.:ys-4)-1-2.3S I Li LEGAL DESCRIPTION: BUILDING OWNER NAME: Cocfnivlus>>lty C\\coy S 43.c. Af� N -Ac� olovk NAME: GGS v-0..t.ngt6.41/4 t.v‘ i "Tnn.4 W.1\42_/_ `GXc a�1.ke_ vreckoQ.., ADDRESS: 50X cisxs.lCt' f.`I\.� gab WA. P, 0. X 4000 CITY: s 0\cD,h2. STATE: W ZIP:lei 2,1-/ - 6OOo PHONE: 14 s L — 51 „S FAX: CELL: CONTACT NAME: tet 11.E CTFk-T ET (Se.e. =r5.\-c-i4e--.cL) ikg PHONE: S 33 --n 9 9 FAX: 53 3-7 2-t SD CELL: g CG_- I l 31 CONTRACTOR NAME: C�AV-U l_c9 NSTR.jAe. 'C 1 ON MAILING ADDRESS: p. O, Sox ',°19 b CITY: S 0�re--- STATE: LA) 1"I ZIP:: 117 2,0 PHONE: 5 ^ W dgs FAX: 35--' 15B4 CELL: PAt / rnA,n?SS'79I Z CONTRACTOR LICENSE No.: EXPIRES: CITY BUSINESS LICENSE NO.: DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE: ****YOU MUST COMPLETE THE FOLLOWING**** MARK N A IF NOT APPLICABLE Height to Peak: 2- Upper Dimensions:i ,If 2( Ave: 5.r/ No.of Stories: Total SpaceHab�i�table I, FL Main Floor SQ FT• Upper Floor SQ FT: Unfinished Basement SQ Finished Basement jr ./SQ ' *2 /5"39 FT: - ./Jr39 FT: am Garage SQ FT' Cvs4_ • SQ Impervious Surface 30%Slopes on , 57 ( veredPo ^�?,t.k Area: 515'0 Property: CD No.of Bedrojoms: J ruction ype:- Heat Source: Sewer or Septic: TOTAL COST OF PROJECT: $ DISCLAIMER the dwellingis/will The permitted verifies,acknowledges and agrees by their signature that: 1)if this permit is for construction or on a dwelling, / be served by potable water. 2)Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws,codes or ordinarlc* 6) Plans or additional information may be required to be submitted and subsequently approved before this application can be processed. \ llllf \/ `._.... Effective October 28, 2007 Page ib€2 - ---� P:\Community Development\02 Administration\03 Forms-Official Versions\Permit Center\Residential Construction Permit App 10.28.07.doc New project 0 Project Previous pre-app meeting S1\ CITE' o poiiane Transmittal Plan revisions 0 City of Spokane Valley Transmittal Date: 400°Valley Community Development Monday,September 20,2010 Department 11703 E.Sprague Ave,Suite B3 Spokane Valley,WA 99206 Phone:509.688.0036 Site Address: 13008 E 39TH LN Project Number: 10002971 Parcel Number: 45342.3514 Zoning: R-3 Water District: MODERN Fire District: FD 01 Applicant: GARCO CONSTRUCTION Owner: CCS FOUNDATION 4114 E BROADWAY AVE 501 RIVERPOINT BLVD SPOKANE WA 99202 SPOKANE WA 9217 (509) 535-4688 e-mail: e-mail: Contact: GARCO CONSTRUCTION Occupant: 4114 E BROADWAY AVE e-mail: SPOKANE WA 99202 (509) 535-4688 0 G, ��E �1 w/ E D e-mail: _ �w.z Contractor: GARCO CONSTRUCTION Arch/Engineer: c,... if) �- �i' P.O. BOX 2946 1---)) SPOKANE. WA 99220-2946 (509) 535-4688 -0 U ti L `nN e-mail: Project SFR W/ATT GAR Description: Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATION PLANE z---- Please send a"C plan review and project comments via e-mail to the ,ihighlighted individuals. This transmittal is being circulated along with the indicated documents for your review. Timely review of the information is important. Please notify the Project Coordinator as well as the applicant and/or contact of any major deficiencies. If the documents meet with your approval please notify the Project Coordinator as soon as possible such that we may include your sign-off on the permit application. Project Coordinator DAVIS, JENNA Phone: Fax: (509)688-0037 Site Address: 13008 E 39TH LN Project Number: 10002971 Parcel Number: 45342.3514 Zoning: R-3 Water District: MODERN Fire District: FD 01 Applicant: GARCO CONSTRUCTION Owner: CCS FOUNDATION 4114 E BROADWAY AVE 501 RIVERPOINT BLVD SPOKANE WA 99202 SPOKANE WA 9217 (509) 535-4688 e-mail: e-mail: Contact: GARCO CONSTRUCTION Occupant: 4114 E BROADWAY AVE e-mail: SPOKANE WA 99202 (509) 535-4688 e-mail: Contractor: GARCO CONSTRUCTION Arch/Engineer: P.O. BOX 2946 SPOKANE, WA 99220-2946 (509) 535-4688 e-mail: Project SFR W/ATT GAR Description: Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATION PLANE This transmittal is being circulated along with the indicated documents for your review. Timely review of the information is important. Please notify the Project Coordinator as well as the applicant and/or contact of any major deficiencies. If the documents meet with your approval please notify the Project Coordinator as soon as possible such that we may include your sign-off on the permit application. Project Coordinator DAVIS, JENNA Phone: Fax: (509)688-0037 Please send all plan review and project comments via e-mail to the highlighted individuals. •Site Address: 13008 E 39TH LN Project Number: 10002971 Parcel Number: 45342.3514 Zoning: R-3 Water District: MODERN Fire District: FD 01 Applicant: GARCO CONSTRUCTION Owner: CCS FOUNDATION 4114 E BROADWAY AVE 501 RIVERPOINT BLVD SPOKANE WA 99202 SPOKANE WA 9217 (509) 535-4688 e-mail: e-mail: Contact: GARCO CONSTRUCTION Occupant: 4114 E BROADWAY AVE e-mail: SPOKANE WA 99202 (509) 535-4688 e-mail: Contractor: GARCO CONSTRUCTION Arch/Engineer: P.O. BOX 2946 SPOKANE, WA 99220-2946 (509) 535-4688 e-mail: Project SFR W/ATT GAR Description: Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATION PLANE This transmittal is being circulated along with the indicated documents for your review. Timely review of the information is important. Please notify the Project Coordinator as well as the applicant and/or contact of any major deficiencies. If the documents meet with your approval please notify the Project Coordinator as soon as possible such that we may include your sign-off on the permit application. Project Coordinator DAVIS, JENNA Phone: Fax: (509)688-0037 Please send all plan review and project comments via e-mail to the highlighted individuals. /� Permit Center Sln�e 11703 E Sprague Ave,Suite B-3 PERMIT NUMBER: Val Valley,WA 99206 .000 Val ley (509)688-0036 FAX:(509)688-0037 PERMIT FEE: Community Development permitcenteraspokanevalley.ore Mechanical Permit Application Commercial XResidential SITE ADDRESS: '3 dO g 34' Y" J Building Owner/ MK4. ��ege.s "� O \P dr� J►� h Name.�D� t'i♦ \ -M' [ S)' t'�CoR Phone:y3 q �$ i 2.5 Fax.‘4341-"" �� S Address:So r \VQt"Q�v\T Q'V e1�. 1�'0 60oo City: SQa`W.+ne_ State:W Zip1�7-goon Contractor / Phone: Fax: Name: ecn AG -.roh ,535^ 688 S3 S— 13 8 Address: 47 O Cao ZQ Li City: keStatewk Zrp91 License No: City Business Lie: `` Contact/Project Manager: ` Name: l,�h GJ�,�R=S Phone: 2 6 . ( I #UNITS FURNACES&SUSPENDED HEATERS-INSTALLATION OR RELOCATION Up to&including 100,000 BTU FURNACES&SUSPENDED HEATERS-INSTALLATION OR RELOCATION Over 100,000 BTU DUCT WORK SYSTEM t HEAT PUMP/AIR CONDITIONER 0-3 TON AIR CONDITIONER Over 3-15 TON AIR CONDITIONER Over 15-30 TON AIR CONDITIONER Over 30-50 TON AIR CONDITIONER Over 50 TON GAS WATER HEATER GAS PIPING SYSTEM(each outlet) H GAS LOG,FIREPLACE,&GAS INSERT APPLIANCE VENTS INSTALLATION,RELOCATION,REPLACEMENT REPAIRS OR ADDITIONS BOILER,COMPRESSORS,ABSORPTIONS SYSTEM 0 to 3 hp-100,000 BTU or less BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 3-15 hp—100,001 to 500,000 BTU BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 15—30 hp -500,001 to 1,000,000 BTU BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 30 hp—1,000,001 to 1,750,000 BTU BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 50 hp—over 1,750,000 BTU AIR HANDLER(DOES NOT include ducting) Each unit up to 10,000 cfm,including ducts AIR HANDLER(DOES NOT include ducting) Each unit over 10,000 cfm EVAPORATIVE COOLERS(other than portables) VENTILATION AND EXHAUST Each fan connected to a singe duct VENTILATION AND EXHAUST Each ventilation system VENTILATION AND EXHAUST Each hood served by mechanical exhaust INCINERATORS Installation or relocation of residential INCINERATORS Installation or relocation of commercial APPLIANCES Range,Clothes Washer Z UNLISTED APPLIANCES Under 400,000 BTU UNLISTED APPLIANCES Over 400,000 BTU HOOD Type I HOOD Type II L P STORAGE TANK WOOD OR PELLET STOVE INSERT WOOD STOVE SYSTEM—FREE STANDING EXPIRES: VIN: DCASH 0 CHECK 0 VISA 0 MC CARD#: SIGNATURE P:\Community Development\02 Administration\03 Forms-Official Versions\Permit Center\Mechanical Permit Application 04-03-09 dg.doc Permit Center 11703 E Sprague Ave,Suite B-3 PERMIT NUMBER: 1SQlIC Spokane Valley,WA 99206 . 00Val ey. (509)688-0036 FAX:(509)688-0037 PERMIT FEE: permitcenterr tspokanevalley.ora Community Development Plumbing Permit Application I I Commercial residential -500 SITE ADDRESS: ' 1$ 3R}1`' A-4 tZ Building Ownereiv,wtto\`e1c S -�• ��� �Du . N � ( Name.r-- b Y\tk �A.GeCc-- hone:y 2 sq_ ` 5- Fax:L434- Si 3S' Address:5-0 R\JGcPdIT O� e3\.,d �a 6000 City: 5�d�C1e State Zip:q `R ego Contractor Contractor CO In.,. `V h Name: ((�� �1 Phone: C'3S� 84,6$v Fax: 535- j3 S t1 Address: p, �JOr� aei 4 b City: 5Ae_ State:W v°\ Zip:et ej zze License No: City Busines Lic: Contact/Project Manager: Name: l/Z1,ex `TL\ S CLe,1 Phone: 6t, Hsi #OF UNITS PLUMBING FIXTURE ON A TRAP TOILETS 2 URINALS TUBS z SHOWERS(per trap) 2 Lav/Basins,Bar,Floor,Kitchen,Laundry,Utility,Janitor,Photo,X-ray,Food, SINKS Prep/Culinary Meat DISHWASHER , CLOTHES WASHER { GARBAGE DISPOSAL WATER SOFTNER D FLOOR DRAIN Area,Case,Coil,Trench,Condensate t ROOF DRAIN/OVERFLOW DRAINS 0 FOUNTAIN,DRINKING O WATER PIPING/DRAIN-IN WASTE Installation,Alterations,Repair,Reversals WATER USING DEVICE Ice and/or Coffee maker,hose bib,steamer proofer,carbonator,swamp cooler PRIVATE SEWAGE DISPOSAL SYSTEM WATER HEATER If Gas,See Mechanical INDUSTRIAL WASTE PRETREATEMENT INCEPTORS Including traps,vents except kitchen type grease interceptors functioning as fixture traps REPAIR OR ALTERATION Water piping,drainage or vent piping ATMOSPHERIC TYPE VACUUM BREAKER BACK FLOW PROTECTIVE DEVICE Other than atmospheric type vacuum breakers MEDICAL GAS INCEPTORS ❑CASH ❑CHECK ❑VISA ❑MC EXPIRES: Card# VIN: SIGNATURE: P:\Community Development\02 Administration\03 Forms-Official Versions\Permit Center\Plumbing Permit Application 04-03-09 dg.doc • 41( . Signature k7 Date: ?- /0 Method of payment: ❑ Cash ❑ Check ❑ Visa ❑ Mastercard Bankcard #: EXP: VIN#: �, �/Authorized Signature: j..__Iv!. Effective October 28, 2007 Page 2 of 2 P:\Community Development\02 Administration\03 Forms-Official Versions\Permit Center\Residential Construction Permit App 10.28.07.doc • For City Use Only PLUS Project Number j 9S � CITY OF porate Project Address 44.000 1 a e11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 ,t 509.688.0036 • Fax: 509.688.0037 • permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is 'l� The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not t:ae date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone,fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE-APPLICANT PINK-BUILDING FILE REV 9