Loading...
2011, 03-07 Permit App: 11000500 Residence Project Number: 11000500 Inv: 1 Application Date: 3/7/2011 Page 1 of 3 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: NEW SFR-SEWER Contact: BIG SKY HOMES&DEVELOPMENT Address: PO BOX 147 C-S-Z: SPOKANE VALLEY WA 99016 Setbacks:Front Left: Right: Rear: Phone: (509)294-4375 Group Name: Project Name: Site Information: Plat Key: Name: Range District: Sout Parcel Number: 45342.3414 Block: Lot: SiteAddress: 13019 E 39TH LN Owner:Name: PAKIBA II,LLC Address: PO BOX 1060 Location::CSV OTIS ORCHARDS,WA 99027-1060 Zoning: R-3 SF Res District Water District: 011 MODERN Hold: ❑ Area: 7,618 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Building Plan Review Released By: Originally Released: 3/4/2011 By: tmelbourn Landuse/Zoning/HE Conditions Released By: Originally Released: 3/7/2011 By: mharnois Sewer Review Released By: Originally Released: 3/3/2011 By: JLMain Permits: U , Operator: jmm Printed By: jmm Print Date: 3/7/2011 Project Number: 11000500 Inv: 1 Application Date: 3/7/2011 Page 2 of 3 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Building Permit Contractor: BIG SKY HOMES& Firm: BIG SKY HOMES&DEVELOPMN Address: Po Box 147 Phone: (509)294-4375 GREENACRES WA 99016 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Su Ft Valuation 1&2 FAMILY R-3 VB 826 $83,384.70 826 $83,384.70 2ND FLOOR R-3 VB 1,109 $82,298.89 1,109 $82,298.89 BASEMENT F R-3 VB 829 $16,580.00 829 $16,580.00 GAR WOOD U-1 VB 509 $9,671.00 509 $9,671.00 Totals: 3,273 $191,934.59 3,273 $191,934.59 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $1,508.95 WSBCC SURCHARGE 1 SELECT $4.50 SF PLNS RVW<7999 SQ FT 1 SELECT $603.58 SFR/DUP SITE PLN REVIEW 1 SELECT $50.00 Permit Total Fees: $2,167.03 Mechanical Permit Contractor: BIG SKY HOMES& Firm: BIG SKY HOMES&DEVELOPMN Address: Po Box 147 Phone: (509)294-4375 GREENACRES WA 99016 Item Description Units Unit Desc Fee Amount DUCT WORK SYSTEM 1 NUMBER OF $11.00 GAS WATER HEATER 1 NUMBER OF $11.00 GAS PIPING 2 #OF UNITS $2.00 VENTILATION SYSTEM 4 NUMBER OF $52.00 Permit Total Fees: $76.00 Operator: jmm Printed By: jmm Print Date: 3/7/2011 Project Number: 11000500 Inv: 1 Application Date: 3/7/2011 Page 3 of 3 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Plumbing Permit Contractor: BIG SKY HOMES& Firm: BIG SKY HOMES&DEVELOPMN Address: Po Box 147 Phone: (509)294-4375 GREENACRES WA 99016 Item Description Units Unit Desc Fee Amount TOILETSBIDETS 3 NUMBER OF $18.00 SINKS 5 NUMBER OF $30.00 TUBS 3 NUMBER OF $18.00 DISH WASHERS 1 NUMBER OF $6.00 GARBAGE DISPOSAL 1 NUMBER OF $6.00 CLOTHES WASHER 1 NUMBER OF $6.00 FLOOR DRAINS 1 NUMBER OF $6.00 Permit Total Fees: $90.00 Payment Summary: _ Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $2,167.03 $2,167.03 $505.02 $1,662.01 Mechanical Permit $76.00 $76.00 $0.00 $76.00 Plumbing Permit $90.00 $90.00 $0.00 $90.00 $2,333.03 $2,333.03 $505.02 $1,828.01 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 3/7/2011 Community Dev-opmentpep Irtro. r ye v ..'' ( •tall Use Only) Permit Center r <�4 ' CITY OF 11703 East Spra e Ave�►l��SO�Q E `� PERMIT UMBER: Spokane Valley, A 992 i' Spokane Tel: (509) 688-00 WO, 1 r,,, f1�t PERMIT F E: Talley Fax: (509) 688-00:7 _ ef•'�a _ 0�-�. 4.jsermitcenter• sso , 0 Name_----`_ RESIDENTIAL CONSTRU a " •na► ' ERMIT APPLICATION ❑■ NEW CONSTRUCTION ❑ ADDITION/REMODEL ❑ ACCESSORY BUILDING ❑ DECK ❑ OTHER SITE ADDRESS: (S°6 -5'R ASSESSORS PARCEL NO.: LEGAL DESCRIPTION: BUILDING OWNER NAME: Big Sky Homes and Development NAME:Travis Paske ADDRESS: PO Box 147 CITY: Spokane Valley STATE: WA ZIP: 99016 PHONE:294-4375 FAx: 8932985 CELL: CONTACT NAME: Big Sky Homes and Development PHONE: 294-4375 FAx: 8932985 CELL: CONTRACTOR NAME: Big Sky Homes and Development MAILING ADDRESS: cm: Spokane Valley STATE: WA ZIP: 99016 PHONE: 294-4375 FAX: 8932985 CELL: CONTRACTOR LICENSE No.: BIGSKSH898BC EXPIRES: 12/29/12 CITY BUSINESS LICENSE NO.: BIGSKSH DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE: Residential,New Construction Residential,New Construction ****YOU MUST COMPLETE THE FOLLOWING**** MARK N/A IF NOT APPLICABLE Height to Peak:201 Dimensions:44x26 No.of Stories:2 Total Habitable2_(g3J Space: Main Floor SQ FT: Upper Floor SQ FT: Unfinished Basement SQ Finished Basement SQ eZ 119e. //d 9 FT: -iiatli.. FT:829 Garage SQ FT: Deck/Covered Patio SQ Impervious Surface 30%Slopes on 5D(� 8 seFT: Area: Property: / No. of Bedrooms:4 Construction Type: LI-4.4D_.. eat HSource:Gas Furnace r Septic: fce( TOTAL COST OF PROJECT: $ $95,000 DISCLAIMER The permitted verifies,acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling,the dwelling is/will be served by potable water. 2)Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional infor io ay be required to be submitted and subsequently approved before this application can be processed. ( I5V Effectiveober 28, 2007 Page 1 of 2 P:\Community Development\02 Administration\03 Forms- Official Versions\Permit Center\Residential Construction Permit App 10.28.07.doc Permit Center stideneNn.... 11703E Sprague Ave,Suite B-3 PERMIT NUMBER: Spokane Valley,WA 99206 4000 Valley icy (509)688-0036 FAX:(509)688-0037 PERMIT FEE: Community Development permitcentercispokanevaliev.org Mechanical Permit Application ❑ Commercial ❑■ Residential SITE ADDRESS: ' c)149 -`t Building Owner NameBig Sky Homes and Development Phone:723-8873 Fax: 8932985 Address:PO Box 147 City:Spokane Valley State:WA zip:99016 Contractor Namesig Sky Homes and Development Phone: 723-8873 Fax: 8932985 Address:PO Box 147 City: Spokane Valley State:WA Zip: 99016 License No: BIGSKSH898BC City Business Lic:BIGSKSH898BC Contact/Project Manager: Name: Jim Matteson Phone: 723-8873 #UNITS FURNACES&SUSPENDED HEATERS-INSTALLATION OR RELOCATION Up to&including 100,000 BTU FURNACES&SUSPENDED HEATERS-INSTALLATION OR RELOCATION Over 100,000 BTU DUCT WORK SYSTEM HEAT PUMP/AIR CONDITIONER 0-3 TON AIR CONDITIONER Over 3-15 TON AIR CONDITIONER Over 15-30 TON AIR CONDITIONER Over 30-50 TON AIR CONDITIONER Over 50 TON GAS WATER HEATER GAS PIPING SYSTEM(each outlet) a • GAS LOG,FIREPLACE,&GAS INSERT 1d APPLIANCE VENTS INSTALLATION,RELOCATION,REPLACEMENT REPAIRS OR ADDITIONS BOILER,COMPRESSORS,ABSORPTIONS SYSTEM 0 to 3 hp-100,000 BTU or less BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 3-15 hp-100,001 to 500,000 BTU BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 15-30 hp -500,001 to 1,000,000 BTU BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 30 hp-1,000,001 to 1,750,000 BTU BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 50 hp-over 1,750,000 BTU AIR HANDLER(DOES NOT include ducting) Each unit up to 10,000 cfm,including ducts AIR HANDLER(DOES NOT include ducting) Each unit over 10,000 cfm EVAPORATIVE COOLERS(other than portables) VENTILATION AND EXHAUST Each fan connected to a singe duct 4 VENTILATION AND EXHAUST Each ventilation system VENTILATION AND EXHAUST Each hood served by mechanical exhaust INCINERATORS Installation or relocation of residential INCINERATORS Installation or relocation of commercial APPLIANCES Range,Clothes Washer UNLISTED APPLIANCES Under 400,000 BTU UNLISTED APPLIANCES Over 400,000 BTU HOOD Type I HOOD Type II L P STORAGE TANK WOOD OR PELLET STOVE INSERT WOOD STOVE SYSTEM-FREE STANDING EXPIRES: VIN: OCASH ❑CHECK 0 VISA ❑MC CARD#: SIGNATURE P:\Community Development\02 Administration\03 Forms-Official Versions\Permit Center\Mechanical Permit Application 04-03-09 dg.doc Permit Center 11703 E Sprague Ave,Suite B-3 Spoka`n7e Spokane Valley,WA 99206 PERMIT NUMBER: tl_no � Va 4lley` (509)688-0036 FAX:(509)688-0037 Community Development permitcenter@spokanevalley.org PERMIT FEE: D-7 Mechanical Permit Application I I Commercial [Residential SITE ADDRESS: 1,3O l £ 3 ` Building Owner �((. Name: jNok. { � Phone: Fax: Address: p� Q�k. � � City: Sy�� State: Zip: qq' ` (co Contractor Contractor `� Stc..0t 1 cL‘Z.- Name: Phone: Fax: Address: Pa g�x ��� City: S kigu— State: Zip: Qibt License No:` &t � 1 1 g G City Business Lic: Contact/Project Manager: t� — Name: S (7 Phone: ` #UNITS FURNACES&SUSPENDED HEATERS-INSTALLATION OR RELOCATION Up to&including 100,000 BTU FURNACES&SUSPENDED HEATERS-INSTALLATION OR RELOCATION Over 100,000 BTU DUCT WORK SYSTEM HEAT PUMP/AIR CONDITIONER 0-3 TON AIR CONDITIONER Over 3-15 TON AIR CONDITIONER Over 15-30 TON AIR CONDITIONER Over 30-50 TON AIR CONDITIONER Over 50 TON GAS WATER HEATER GAS PIPING SYSTEM(each outlet) 7 GAS LOG,FIREPLACE,&GAS INSERT APPLIANCE VENTS INSTALLATION,RELOCATION,REPLACEMENT REPAIRS OR ADDITIONS BOILER,COMPRESSORS,ABSORPTIONS SYSTEM 0 to 3 hp-100,000 BTU or less BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 3-15 hp—100,001 to 500,000 BTU BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 15—30 hp -500,001 to 1,000,000 BTU BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 30 hp—1,000,001 to 1,750,000 BTU BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 50 hp—over 1,750,000 BTU AIR HANDLER(DOES NOT include ducting) Each unit up to 10,000 cfm,including ducts AIR HANDLER(DOES NOT include ducting) Each unit over 10,000 cfm EVAPORATIVE COOLERS(other than portables) VENTILATION AND EXHAUST Each fan connected to a singe duct VENTILATION AND EXHAUST Each ventilation system VENTILATION AND EXHAUST Each hood served by mechanical exhaust INCINERATORS Installation or relocation of residential INCINERATORS Installation or relocation of commercial APPLIANCES Range,Clothes Washer UNLISTED APPLIANCES Under 400,000 BTU UNLISTED APPLIANCES Over 400,000 BTU HOOD Type I HOOD Type II L P STORAGE TANK • WOOD OR PELLET STOVE INSERT WOOD STOVE SYSTEM—FREE STANDING EXPIRES: VIN: ❑CASH ❑CHECK ❑VISA ❑MC CARD#: SIGNATURE http://www.spokanevalley.org/uploads/Community Development/Documents/Forms/Building/MechanicatPermitApplication040309.doc Permit Center Spo"""1""\*" 11703 E Sprague Ave,Suite B-3 PERMIT NUMBER: l�LliC Spokane Valley,WA 99206 #Valley. (509)688-0036 FAX:(509)688-0037 PERMIT FEE: permitcenter@spokanevalley.org Community Development Plumbing Permit Application ElCommercial n Residential SITE ADDRESS: cic` Building Owner Name: Big Sky Homes and Development Phone: 723_8873 Fax: 893-2985 Address: PO Box 147 City: State: Zip: Contractor Name: 723-8873 Phone: 723-8873 Fax: 893-2985 Address: p0 box 147 City: Spokane Valley State: Wa Zip: 99016 License No: BIGSKSH898BC City Business Lie: Contact/Project Manager: Name: Bid Sky Homes and Development Phone: 723-8873 #OF UNITS PLUMBING FIXTURE ON A TRAP TOILETS 3 URINALS TUBS 3 SHOWERS(per trap) Lav/Basins,Bar,Floor,Kitchen,Laundry,Utility,Janitor,Photo,X-ray,Food, 5 SINKS Prep/Culinary Meat DISHWASHER 1 CLOTHES WASHER 1 GARBAGE DISPOSAL 1 WATER SOFTNER FLOOR DRAIN Area,Case,Coil,Trench,Condensate 1 ROOF DRAIN/OVERFLOW DRAINS FOUNTAIN,DRINKING WATER PIPING/DRAIN-IN WASTE Installation,Alterations,Repair,Reversals WATER USING DEVICE Ice and/or Coffee maker,hose bib,steamer proofer,carbonator,swamp cooler PRIVATE SEWAGE DISPOSAL SYSTEM WATER HEATER If Gas,See Mechanical INDUSTRIAL WASTE PRETREATEMENT INCEPTORS Including traps,vents except kitchen type grease interceptors functioning as fixture traps REPAIR OR ALTERATION Water piping,drainage or vent piping ATMOSPHERIC TYPE VACUUM BREAKER BACK FLOW PROTECTIVE DEVICE Other than atmospheric type vacuum breakers MEDICAL GAS INCEPTORS ❑CASH 0 CHECK 0 VISA 0 MC EXPIRES: Card# VIN: SIGNATURE: P:\Community Development\02 Administration\03 Forms-Official Versions\Permit Center\Plumbing Permit Application 04-03-09 dg.doc • a Community Development Department (Staff Use Only) Permit Center CITYlr ri 11703 East Sprague Avenue, Suite B-3 PERMIT NUMBER: j� Spokane Valley, WA 99206 Valley" Tel: (509) 668888-0036 PERMIT FEE: 4000Fax: (509) 0037 permitcenter@wokanevallev.orq APPROACH PERMIT APPLICATION PROJECT ADDRESS: i ll at e...-- Salmi La--t_ START DATE: -36 oft L ANTICIPATED COMPLETION DATE: f.R..It j t2 BUILDING OWNER NAME: Big Sky Homes and Development MAILING ADDRESS: PO Box 147 CITY: Spokane Valley STATE: WA zip: 99016 CONTACT PERSON NAME: Jim Matteson PHONE: 723-8873 FAX: 893-2985 CELL: CONTRACTOR NAME: Big Sky Homes and Development MAILING ADDRESS: PO Box 147 CITY: Spokane Valley STATE: WA zip: 99016 PHONE: 723-8873 FAX: 893-2985 CELL: CONTRACTOR LICENSE No.: BIGSKSH898B� EXPIRES: 12/29/12 CITY BUSINESS LICENSE NO.: PROJECT DESCRIPTION (Please Provide Site Sketch) • Residential Driveway ❑ Commercial/Industrial Driveway 0 Existing Curb &Gutter ❑ Rural Road Section ❑ Culvert Installation ❑ Sidewalk Repair/Construction ❑ Other Conditions: Bond/Insurance certification must be on file with the City. DISCLAIMER The permitted verifies,acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling,the dwelling is/will be served by potable water. 2)Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved before this application can be processed. Signature Date: Method of payment: ❑ Cash El Check ❑ Visa ❑ Mastercard Bankcard #: EXP: VIN# Authorized Signature: Effective October 28, 2007 Page 1 of 1 P:\Community Development\02 Administration\03 Forms- Official Versions\Permit Center\Approach Permit 10.28.07.doc LI{ 1 S yq LeD4 \ 4 '- 2 ` t p{y A jw.,- `Ito i G zp sc. Ie- E _` : 1:------/ 3Sti:to -----\ e 112,,,, /11' °is), 1 , flti- i Y .. a?3. Y N \\P''' i i 1 7.0 0 0 \ . i I kt P jjJ i / / Vi \ t i7 K.6; \� S)---Ni i 4-, �' :. J I RECEIVED CSV PERMIT CENTER MRR32" 3 / P A) . Project# ,3c--: A Submittal #' 1 APPROVED BY _ilii For City Use Only, PLUS Project Number 1 - a SC' SCITY pokane Project Address dojo. V ® al le y11703E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or peurtit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone,fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE—APPLICANT PINK—BUILDING FILE REV 9/07