Loading...
2009, 02-23 Permit App: 09000365 Pool CoverProject Ntunber: 09000365 Inv: 1 Application Date: 2/23/2009 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Parcel Number: 45324.0921 Block: Lot: SiteAddress: 10107 E 42ND CT Owner: Name: GEORGE, CHRIS A & DONNA M Address: 10107 E 42ND CT Location:: CSV SPOKANE VALLEY, WA 99206 Zoning: R-1 SF Res Estate District Water District: 101 SPO CO WATER DIST#3B Hold: j_ Area: .00 Acres Width: 0 Depth: 0 Right Of Way (ft): 0 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Review Information: Review Building Plan Review Released By: Originally Released: 2/19/2009 By: RGUERRY Landuse/Zoning/HE Conditions Released By: Originally Released: 2/23/2009 By: Mharnois Permits: Operator: jmm Printed By: jmm Print Date: 2/23/2009 Project Number: 09000365 Inv: I Application Date: 2/23/2009 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit — Building Permit - - Contractor: OWNER Firm: OWNER Payment Summary • ., Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $820.91 $820.91 $233.26 $587.65 $820.91 $820.91 $233.26 $587.65 Disclaimer. Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 2/23/2009 Phone: (000) 000-0000 This Application: Total Project: Description Grp Type Notes Sg Ft Valuation Sq Ft Valuation GARAGE U-1 VB POOL 2,304 $43,776.00 2,304 $43,776.00 COVER Totals: 2,304 $43,776.00 2,304 $43,776.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $583.15 WSBCC SURCHARGE 1 SELECT $4.50 SF PLNS RVW < 7999 SQ FT 1 SELECT $233.26 Permit Total Fees: $820.91 Notes:.r....�. ;....�. .r,... Payment Summary • ., Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $820.91 $820.91 $233.26 $587.65 $820.91 $820.91 $233.26 $587.65 Disclaimer. Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 2/23/2009 Permit Center Scm of 11703 E Sprague Ava:-Smt�'B ro� PERMIT NUMBER: pokane Spokane Val }�l� 9 06 ' - ` v�LLEY PERMIT FEE: Valley (509)688-0036 F:509)688-0037 49;00J www.spokanevalley.40 18 2009 Community Development ERMIT CE Residential Constructio% �,1N,vr!!Construction 'Accessory Bldg Permit Application ❑ Addition/Remodel ❑ Deck ❑ Other: SITE ADDRESS: �O \ "C C --V ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Building Owner: Name: Address: `0 1 0� City: <G SlaeLjA_ Zip: Phone: 9 1 -7�5- Fax: Contact Person Name: rk—N V Phone: � C " \ CI) Contractor: Name: Address: TOT E SPACE: City: State: Zip: Phone: Fax: Contractor Lic No: Exp Date: City Business Lic. No: ®oO 00 Describe the scope of work in detail: Cost of Project: $ Proposed Use: **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT JE S� DI N # OF STORIES: TOT E SPACE: MAIN FLOOR To SQ. FTG: 2 FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: ' � IMPERVIOUS SURFACE AREA: FINISHED BASEMENT SQ. FTG: GARAGE SQ. FTG: `1L DECKICOV. PATIO SQ. FTG: I 30% SLOPES ON I PROPERTY: # OF BEDROOMS: CO S U TION TYPE: HEAT SOURCE: SEWER OR SEPTIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) P ns or additional information may be required to be submitted, and subsequently approved before this application can b r essed. SIGNATURE: DATE: Method of Payment. ❑ Cash heck ❑ Mastercard ❑ VISA Bankcard #: Expires: VIN#: Authorized Signature: REVISED 2/15/07 RESIDENTIAL CHECK LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. ❑ SITE PLAN ❑ Property lines and dimensions ❑ Setbacks to property lines ❑ Direction arrow pointing North and orientation to streets ❑ Distance between buildings ❑ Proposed/existing buildings (footprint and dimensions) ❑ Right of way/easement location & sizes ❑ Utilities, septic tank/drain field locations and distances ❑ Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) ❑ Elevations (Front/Rear/Sides) with roof peak and wall height including basement: ❑ Foundation Plan (crawlspace, basement or slab on grade): ❑ Footing sizes and locations ❑ Supporting wood cripple walls or beams ❑ Perimeter concrete foundation wall sizes ❑ Thickened concrete pads supporting ❑ Crawlspace ventilation beams or girder trusses ❑ Floor Plan of each level (finished or unfinished) with dimensions: ❑ Floor Joist direction, size and spacing ❑ Window and door location and sizes ❑ Header, beam or concrete lintel sizes ❑ Window well locations if applicable ❑ Brace wall panel locations ❑ Room usage labels ❑ Water heater and furnace locations ❑ Smoke detector locations ❑ Exhaust fan locations ❑ Attic and crawl space access locations ❑ Deck or concrete patio sizes and locations ❑ Fire Wall construction ❑ Roof Plan: ❑ Engineered truss direction and spacing ❑ Rafter and over frame direction, size and spacing ❑ Wall Section Detail including: Roof ❑ Ridge, eave and valley lines ❑ Beam and girder size and location tans ❑ Slope/ roofing material/ underlayment/ ice dam protection ❑ Truss or rafter size, spacing & connection ❑ Sheathing size and type ❑ Attic insulation/ air space baffle/ ventilation ❑ Joist size and spacing ❑ Size of ceiling gypsum wall b and Wall ❑ Height/ top plate/ stud size and spacing/ sole plate ❑ Exterior sheathing size and type Floor ❑ Joist size and spacing Foundation Wall ❑ Concrete or Masonry unit width ❑ Earth to wood separation distance Footing ❑ Size Radon ❑ Passive system with Emil vapor barrier Miscellaneous Construction Details ❑ Deck: ❑ Floor plan/ side view/ dimensions ❑ Floor Joist/ decking direction, size and spacing ❑ Siding/ exterior house wrap/ anchor bolts ❑ Insulation, vapor barrier, gypsum wall board ❑ Sheathing or concrete floor size/ insulation ❑ Footing bottom to finished ground level depth ❑ Horizontal & vertical reinforcement if any ❑ Reinforcement if any ❑ Active system with 6 mil vapor barrier ❑ Footings/ post/ and,beam size and locations 0 Stairway tread rise & run and nosing 0 Handrail / Guard height & spacing 0000*4 .,;oOValley PERMIT CENTER 11703 E. Sprague Ave., Suite B-3 Spokane Valley, WA 99206 509-688-0036; Fax 509-688-0037 www.spokanevalle�org Affidavit in Lieu of General Contractor Registration State of Washington County of Spokane Pv state as follows: (Print name as signed) I have made application for a building permit from the City of Spokane Valley, Washington. 2. I understand that state law requires that all building construction contractors be registered with the State of Washington. The exceptions to this requirement are stated under RCW 18.27.090, a copy of which is printed on the reverse side of this affidavit. 3. I understand that prior to issuance of a building permit for work that is to be done by any contractor, the City of Spokane Valley must verify either that the contractor is registered by the State of Washington, or that one of the exemptions stated under RCW 18.27.090 applies. 4. In order to provide verification to the City of Spokane Valley of my compliance with this requirement, I hereby attest that after reading the exemptions from the registration requirement of RCW 18.27.090, I consider the work authorized under this building permit to be exempt under No. , and will therefore, not be performed by a registered contractor. I understand that I may be waiving certain rights that I might otherwise have under state law in any decision to engage an unregistered contractor to perform construction work. &a- aL 4 el e_ ___ . PLICANT' S SIGNA October 15, 2007 Page 1 of 2 PACommunity Development\Forms\Building Forms Si ed and swom to before me this Day of e5 , 20P4. Ot1111lItItt11i1tiQIIIIIIII1111111111111111IIu ,/ i %;C(C1!-✓t ���r � �PC� tu✓ — Not Public _ mw State of Washington _ Notary' Name rint) � =ADAM ROBERT LEONARD_14 MY CoMMI ry IO 201 EXPIRES _ Notary's Signature OIIIIIiII1111111111111111111tI1111111111111111C1 NOTARY PUBLic in and for the State of Washington, residing at Sx- � County My Commission expires: 0 �y ' October 15, 2007 Page 1 of 2 PACommunity Development\Forms\Building Forms Revised Code of Washington 18.27.090 Exemptions. The registration provisions of this chapter do not apply to: 1) 2) 3) 4) 5) 6) 7) 8) 9) 10) An authorized representative of the United States government, the state of Washington, or any incorporated city, town, county, township, irrigation district, reclamation district, or other municipal or political corporation or subdivision of this state; Officers of a court when they are acting within the scope of their office; Public utilities operating under the regulations of the utilities and transportation commission in construction, maintenance, or development work incidental to their own business; Any construction, repair, or operation incidental to the discovering or producing of petroleum or gas, or the drilling, testing, abandoning, or other operation of any petroleum or gas well or any surface or underground mine or mineral deposit when performed by an owner or lessee; The sale or installation of any finished products, materials, or articles of merchandise that are not actually fabricated into and do not become a permanent fixed part of a structure; Any construction, alteration, improvement, or repair of personal property performed by the registered or legal owner, or by a mobile/manufactured home retail dealer or manufacturer licensed under chapter 46.70 RCW who shall warranty service and repairs under chapter 46.70 RCW; Any construction, alteration, improvement, or repair carried on within the limits and boundaries of any site or reservation under the legal jurisdiction of the federal government; Any person who only furnished materials, supplies, or equipment without fabricating them into, or consuming them in the performance of the work of the contractor; Any work or operation on one undertaking or project by one or more contracts, the aggregate contract price of which for labor and materials and all other items is less than five hundred dollars, such work or operations being considered as of a casual, minor, or inconsequential nature. The exemption prescribed in this subsection does not apply in any instance wherein the work or construction is only a part of a larger or major operation, whether undertaken by the same or a different contractor, or in which a division of the operation is made into contracts of amounts less than five hundred dollars for the purpose of evasion of this chapter or otherwise. The exemption prescribed in this subsection does not apply to a person who advertises or puts out any sign or card or other device which might indicate to the public that he or she is a contractor, or that he or she is qualified to engage in the business of contractor; Any construction or operation incidental to the construction and repair of irrigation and drainage ditches of regularly constituted irrigation districts or reclamation districts; or to farming, dairying, agriculture, viticulture, horticulture, or stock or poultry raising; or to clearing or other work upon land in rural districts for fire prevention purposes; except when any of the above work is performed by a registered contractor; 11) An owner who contracts for a project with a registered contractor, except that this exemption shall not deprive the owner of the protections of this chapter against registered and unregistered contractors. The exemption prescribed in this subsection does not apply to a person who performs the activities of a contractor for the purpose of leasing or selling improved property he or she has owned for less than twelve months; 12) Any person working on his or her own property, whether occupied by him or her or not, and any person working on his or her personal residence, whether owned by him or her or not but this exemption shall not apply to any person otherwise covered by this chapter who constructs an improvement on his or her own property with the intention and for the purpose of selling the improved property; 13) Owners of commercial properties who use their own employees to do maintenance, repair, and alteration work in or upon their own properties; 14) A licensed architect or civil or professional engineer acting solely in his or her professional capacity, an electrician licensed under the laws of the state of Washington, or a plumber licensed under the laws of the state of Washington or licensed by a political subdivision of the state of Washington while operating within the boundaries of such political subdivision. The exemption provided in this subsection is applicable only when the licensee is operating within the scope of his or her license; 15) Any person who engages in the activities herein regulated as an employee of a registered contractor with wages as his or her sole compensation or as an employee with wages as his or her sole compensation; 16) Contractors on highway projects who have been prequalified as required by RCW 47.28.070, with the department of transportation to perform highway construction, reconstruction, or maintenance work; 17) A mobile/manufactured home dealer or manufacturer who subcontracts the installation, set-up, or repair work to actively registered contractors. This exemption only applies to the installation, set-up, or repair of the mobile/manufactured homes that were manufactured or sold by the mobile/manufactured home dealer or manufacturer; 18) An entity who holds a valid electrical contractor's license under chapter 19.28 RCW that employs a certified journeyman electrician, a certified residential specialty electrician, on awAI"MjM4N4jIiee meeting the requirements t bf t:hjLyAWI 9J28 RSV to perform plumbing u%> IdAb* 1AD ib4llj directly, and imraitouse dd pr� g j�ind replacement of a o�Yl inall household utxliza �+1im&d electric power STRr""A Yy8TeFsuperviNed �r iiiections. An electrical trainee must by a certified electrician while performing plumbing work. October 15, 2007 Page 2 of 2 PACommunity Development\Forms\Building Forms Spokane ,,;00W1ey- 11707 E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206 509.921.1000 ♦ Fax: 509.921.1008 ♦ cityha[L@spokanevalley.org Memorandum To: Frank Smith From: Karen Kendall, Assistant Planner CC: CSV Building Address File Chris and Donna George; 10107 E 42nd Court; Spokane Valley, WA Date: February 18, 2009 Re: Revisions to site plan for proposed 48'x 48' attached garage located at 10107 East 42nd Court (project #: 09-000365). The following is a request for the site plan to be updated to meet the minimum requirements for review. I've included a marked up site plan in red of all requested changes. See attached. 1. North Arrow 2. Lot dimensions and square footage. 3. Actual setbacks. The setback shown from the street (42nd Court) to the front of the residence is incorrect. 4. Show and label the location of the five (5) foot utility easement that extends the length of the rear (north) property line. 5. Indicate if the structure will be attached to the residence as stated on permit. The Assessor's Office shows a 427 lean to that connects the residence to the existing detached garage totaling 2,250 square feet. 6. Update the square footage calculation of the proposed structure. The proposed 48' x 48' structure equals 2,304 square feet, not 2,204 square feet as shown. 7. It was verbally mentioned the proposed building is being repaired from structural damage as the roof collapsed. If this is true, then include a note stating the actual scope of work. Brand new construction, repair and/or replacement. It appears the proposed attached structure is increasing in size from 2,250 to 2,304 square feet not including the 427 square foot lean to. All these requested changes shall be located on a new site plan and the marked up site plan I completed will not be acceptable as a submittal. Site Address: 10107 E 42ND CT Parcel Number: 45324.0921 Zoning: R-1 Fire District: FD 01 Project Transmittal City of Spokane Valley Community Development Department 11703 E. Sprague Ave, Suite B3 Spokane Valley, WA 99206 Phone: 509.688.0036 Newproject Preuous pre -app meeting Plan ressions El Transmittal Date: Wednesday, February 18, 2009 Project Number: 09000365 Water District: SPO CO WATER DIST#313 Applicant: GEORGE, CHRIS A & DONNA M 10107 E 42ND CT SPOKANE VALLEY, WA 99206 (509) 939-1275 e-mail: Contact: GEORGE, CHRIS A & DONNA M 10107 E 42ND CT SPOKANE VALLEY, WA 99206 (509) 939-1275 e-mail: Contractor: OWNER ( ) - 0 Project 48 X 48 POOL COVER Description: Owner: GEORGE, CHRIS A & DONNA M 10107 E 42ND CT SPOKANE VALLEY, WA 99206 e-mail: Occupant: e-mail: Arch /Engineer. e-mail: Please send all plan review and project comments via e-mail to the highlighted individuals. Job Truss Truss Type Qty Ply,TRUSSES OVER POOL 090282 AG GABLE 1 Job Reference (optional) PRO -BUILD, SPOKANE,WA., TONY CARON 7.050 s May 22 2008 MiTek Industries, Inc. Mon Feb 09 15:11:56 2009 Page 1 F1-6-9 6.5-10 I 12-7-12 18.9-14 25-0-0 I 31.2-2 37-4-4 I 43.6-6 50-0-0 151-6.0 1.6-0 6-5-10 6-2-2 6-2-2 6-2-2 6.2-2 6-2-2 6-2-2 6-5-10 1-6-0 Scale =1 14 3x9 = — 5x14 Mr18H= 7x10 = 5x9 11 4.00 12 7 4x4 6 2.00 12 ^� 5x14 Mr18H- 7x10 = 9x12 Mr18Hzz 12 13 24 3x9 = 9 6-5-10 12-7-12 18-9-14 25-0-0 31.2-2 37-4-4 43-6-6 60-0-0 6-5-10 6-2.2 6.2-2 6-2-2 6-2-2 6-2.2 6-2-2 6-5-10 ;ts (X,Y): [2:0-4-5,0-4-8],[5:0-2-0,0-0-4],[7:0-4-12,0-2-8],[9:0-2-0,0-0-4],[12:0-4-5,0-4-8],[14:0-4-8,0-1-1],[15:0-5-0,0-2-12],[16:0-7-0,0-0-4],[19:0-9-0,0-3-9], [22:0-7-0,0-0-4), [23:0-5-0,0-2-12], [24:0-4-8,0-1-1], [25:0-1-12,0-1-0], [28:0-1-12,0-1-0], [33:0-2-0,0-1-0], [39:0-1-15,0-2-12], [47:0-1-12,0-1-0], [50:0-1-12 LOADING (psf) SPACING 2-0-0 CSI TCLL 30.0 Plates Increase 1.15 TC 0.65 (Roof Snow --30.0) Lumber Increase 1.15 BC 0.66 TCDL 7.0 Rep Stress Incr YES WB 0.75 BCLL 0.0 Code IRC2006/TPI2002 (Matrix) BCDL 10.0 0.98 24 n/a LUMBER 6-19,8-19 TOP CHORD 2 X 6 HF 180OF 1.6E REACTIONS (Ib/size) BOT CHORD 2 X 4 HF 240OF 2.0E WEBS 2 X 4 DF Stud/Std 'Except' 2456/0-5-8 W7,WCL2,WCR2: 2 X 4 HF 180OF 1.6E 24 = - EV1,EV2: 2 X 6 DF 240OF 2.0E OTHERS 2 X 4 DF Stud/Std in (loc) BRACING Ud PLATES GRIP TOP CHORD -0.99 19 >603 Structural wood sheathing directly applied or 2-10-2 oc purlins, except end verticals. BOT CHORD Vert(TL) -1.84 18-19 Rigid ceiling directly applied or 10-0-0 oc bracing. MT18H 185/148 WEBS 0.98 24 n/a 1 Row at midpt 6-19,8-19 REACTIONS (Ib/size) 14 = 2456/0-5-8 24 = - 2456/0-5-8 Max Horz 14 = -79(LC 8) Max Uplift 14 = -33(LC 5) 24 = -33(LC 6) FORCES (lb) - Maximum Compression/Maximum Tension TOP CHORD 1-2 = 0/73 2-3 = -6851/0 3-4 = -7797/0 4-5 = -7731/0 5-65 = -7227/0 6-65 = -7149/0 6-7 = -6169/0 7-8 = -6169/0 8-66 = -7149/0 9-66 = -7227/0 9-10 = -7731/0 10-11 = -7797/0 11-12 = -6851/0 12-13 = 0/73 2-14 = -2511/73 12-24 = -2511/63 BOT CHORD 14-15 = -35/1056 15-16 = 0/6472 16-17 = 0/6486 17-18 = 0/7471 18-19 = 0/6887 19-20 = 0/6887 20-21 = 0/7471 21-22 = 0/6486 22-23 = 0/6472 23-24 = 0/1056 WEBS 3-15 = -716/70 3-17 = 0/1009 5-17 = -172/87 5-18 = -623/68 6-18 = 0/403 6-19 = -1496/79 7-19 = 0/3343 8-19 = -1496/83 8-20 = 0/403 9-20 = -623/75 9-21 = -172/87 11-21 = 0/1009 11-23 = -716/65 2-15 = 0/5345 12-23 = 0/5345 DEFL in (loc) I/deft Ud PLATES GRIP Vert(LL) -0.99 19 >603 240 MT20 185/148 Vert(TL) -1.84 18-19 >323 180 MT18H 185/148 Horz(TL) 0.98 24 n/a n/a Weight: 314 Ib NOTES 1) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see MiTek "Standard Gable End Detail" 2) TCLL: ASCE 7-05; Pf=30.0 psf (flat roof snow); Category 11; Exp B; Partially Exp.; Ct= 1 3) Unbalanced snow loads have been considered for this design. 4) This truss has been designed for greater of min roof live load of 16.0 psf or 2.00 times flat roof load of 30.0 psf on overhangs non -concurrent with other live loads. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurren with any other live loads. 6) All plates are MT20 plates unless otherwise indicated. 7) All plates are 2x4 MT20 unless otherwise indicated. 8) Gable studs spaced at 2-0-0 oc. 9) ` This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 10) Bearing at joint(s) 14, 24 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 11) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 33 Ib uplift at joint 14 and 33 Ib uplift at joint 24. 12) This truss is designed in accordance with the 2006 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job Truss Truss Type 7x12 MT18H= Qty in (loc) Ply TRUSSES OVER POOL 090282 A SCISSORS 18 9x18 MT18H= 17 3x6 - 25 12 13 1 >603 15 16 3x6 = 22 3x6 = 23 (Roof Snow --30.0) Lumber Increase 1.15 2.00 F12 5x14 MT18H WB= Job Reference o tional PRO -BUILD, SPOKANE,WA., TONY CARON 14 5x14 MT18H WB= 7.050 s May 22 2008 MiTek Industries, Inc. Mon Feb 09 15:11:53 2009 Page 1 rl:" 6-6-10 12-7.12 18-9-14 25-0-0 31-2-2 374.4 1 43-6-6 60-0-0 "6 1 1.6-0 6-5-10 6-2-2 6-2-2 6-2-2 6-2-2 6-2-2 6-2-2 6-6-10 1-6-0 12-7-12 18-9-14 25.0-0 31-2-2 37-4-4 1 43-6.6 60-0-0 Scale =1:90. 5x9 11 4.00 12 7 4x4 4x4 6 78 4x4 % 25 W6 W8 26 4x4 5x7 � 9 5x7 5 4x4 % 4 W4 W10 10 4x4 3 11 7x12 MT18H= W2 W12 7x12 MT18H= DEFL in (loc) 19 Ud PLATES GRIP TCLL 30.0 1 2 18 9x18 MT18H= 17 3x6 - 20 3x6 =21 12 13 e >603 15 16 3x6 = 22 3x6 = 23 (Roof Snow --30.0) Lumber Increase 1.15 2.00 F12 5x14 MT18H WB= -1.84 18-19 >323 14 5x14 MT18H WB= TCDL 7.0 24 YES 3x9 - 7x10 = 7x10 = 3x9 = n/a 6-5-10 12-7-12 18-9-14 25.0-0 31-2-2 37-4-4 1 43-6.6 60-0-0 9-26 = -7227/0 6-5-10 6-2-2 6-2-2 6-2-2 6-2-2 6-2-2 6-2-2 6-6-10 LOADING (psf) SPACING 2-0-0 CSI DEFL in (loc) I/defl Ud PLATES GRIP TCLL 30.0 Plates Increase 1.15 TC 0.65 Vert(LL) -0.99 19 >603 240 MT20 185/148 (Roof Snow --30.0) Lumber Increase 1.15 BC 0.66 Vert(TL) -1.84 18-19 >323 180 MT18H 185/148 TCDL 7.0 Rep Stress Incr YES WB 0.75 Horz(TL) 0.98 24 n/a n/a 4-5 = -7731/0 BCLL +0.0 Code IRC20061TPI2002 (Matrix) 9-26 = -7227/0 9-10 = -7731/0 10-11 = -7797/0 11-12 = -6851/0 12-13 = 0/73 2-14 = -2511/73 Weight: 255 Ib LUMBER TOP CHORD 2 X 6 HF 180OF 1.6E BOT CHORD 2 X 4 HF 240OF 2.0E WEBS 2 X 4 DF Stud/Std 'Except' W7,WCL2,WCR2: 2 X4 HF 180OF 1.6E EV1,EV2: 2 X 6 DF 240OF 2.0E BRACING TOP CHORD Structural wood sheathing directly applied or 2-10-2 oc purlins, except end verticals. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 6-19,8-19 REACTIONS (Ib/size) 14 = 2456/0-5-8 24 = 2456/0-5-8 Max Horz 14 = -79(LC 8) Max Uplift 14 = -33(LC 5) 24 = -33(LC 6) FORCES (lb) - Maximum Compression/Maximum Tension TOP CHORD 1-2 = 0/73 2-3 = -6851/0 3-4 = -7797/0 4-5 = -7731/0 5-25 = -7227/0 6-25 = -7149/0 6-7 = -6169/0 7-8 = -6169/0 8-26 = -7149/0 9-26 = -7227/0 9-10 = -7731/0 10-11 = -7797/0 11-12 = -6851/0 12-13 = 0/73 2-14 = -2511/73 12-24 = -2511/63 BOT CHORD 14-15 = -35/1056 15-16 = 0/6472 16-17 = 0/6486 17-18 = 0/7471 18-19 = 0/6887 19-20 = 0/6887 20-21 = 0/7471 21-22 = 0/6486 22-23 = 0/6472 23-24 = 0/1056 WEBS 3-15 = -716170 3-17 = 0/1009 5-17 = -172/87 5-18 = -623/68 6-18 = 0/403 6-19 = -1496/79 7-19 = 0/3343 8-19 = -1496/83 8-20 = 0/403 9-20 = -623/75 9-21 = -172/87 11-21 = 0/1009 11-23 = -716/65 2-15 = 0/5345 12-23 = 0/5345 NOTES 1) Wind: ASCE 7-05; 90mph; TCDL=4.2psf; BCDL=6.Opsf; h=25ft; Cat. II; Exp B; enclosed; MWFRS (low-rise); cantilever left and right exposed ; Lumber DOL=1.33 plate grip DOL=1.33 2) TCLL: ASCE 7-05; Pf=30.0 psf (flat roof snow); Category II; Exp B; Partially Exp.; Ct= 1 3) Unbalanced snow loads have been considered for this design. 4) This truss has been designed for greater of min roof live load of 16.0 psf or 2.00 times flat roof load of 30.0 psf on overhangs non -concurrent with other live loads. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurren with any other live loads. 6) All plates are MT20 plates unless otherwise indicated. 7) ' This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 8) Bearing at joint(s) 14, 24 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 9) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 33 Ib uplift at joint 14 and 33 Ib uplift at joint 24. 10) This truss is designed in accordance with the 2006 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard AG 50'0"0 w 090282.EFM 2/9/2009 15:15 Rec: vt^ d.,- c5 u\- -�.A-,-- X-) C \- `'lam Altar r o-,... A c �o v v� o�a�•s v� �' \oN. ���� M���r� lv:� 103 • Gsu�er��� • �- • • • pe j coil-e}ndwoo s,AGGUIBuA , 11�3 ��S C � L l8 L86 'ON - I c co 14 i 30\At CwXTq6%,%wgoal • 3 �♦ ped uoil-e}nduaoo s,aaaui6ul „M3ll®3bf1SL A � lP Llc'6 'oN At I J a ad, 4 0 &40 co pUd uoi}elnduaoo s,aaaui6ul U31103VI5C �� Acow.e. UJ%N.\* Al cow.au. %Akww ?\%kqL ped uoia-elndwoo s,aaoulbul �3-�l®3b'.O.SC � L l8 L�6 'ON r� r` Ft'e►�y, V low (0 y cove Ap Ped uoil-eIndwoo s,aaauibui1l13"IJ.®3VIS C6- I G l2 LC6 'ON k Skp%C,V,-. rse*-wa. '*4b �e �s ss khW •w. rev. h*Jr 6• ap —*V49("�Y� v -t , 4��j o � , 1 tr-> 20 09 Zi Tr -11 7- m r--4- z 0-6 Oft*A fewom I tklfy� r__".4 . ----"7rj-eg 01.00.z cot-tU - 8 soq 'PP tr4 u '1 -di 4k'1 ,s--6-1.40--L cua, si t-Nereetcq\--1 -! : 2009 CS'17-C--(i--,frt-otm * 1 27L'4 2_7,04 0 . SP664 VALLEY DEPART ENTOF -+NcICICt\ta CytialrJ ----- COIAMUNIT1 i ELOPMENT ----- --. d 11-0 '--- 4 9' r\45, 1t -1,k -1• (fki ./r- e ccelva'' ----- I „--- Lt*-11 , 4:4;11 V i sc. • - -.5-, w ...,...... , e okj 4 fret Ati-t 7 ' 2)/ ey .11) I ' . . . 4 Cri ...... Ai 0 AISv. tfil -Fr 0 511' c go, 0 N . PLANNING DEPT. APPR ED ' ' ' \la/7a' . •. .ela DATE: c>:-'7910 /42-bid (---1- ,..... ,_)2_001 001:11A 1 •Iii I g s 4:757 ______. xia., anif4 000 CITYSp6koane ,,;OoValley ° For City Use Only PLUS Project Number Project Address , l 11703 E Sprague Ave Suite B-3 ♦ Spokane Vattey WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07