Loading...
1994, 07-06 Permit: 94006255 Sewer SPOKANE COUNTY DEPARTMENT OF BUILDINGS WEST 1026 BROADWAY • SPOKANE,WA 99260-0050 (509)456-3675 1 SITE INFORMATION PROJECT INFORMATION SITE ADDRESS: 11307 E 42ND CT PROJECT NUMBER: 94006255 ISSUE DATE: 07/06/94 SPOKANE WA 99206 PERMIT USE: DRYLINE SEWER CONNECTION (94S-762) PARCEL NUMBER: 45333.1515 APPLICANT: ROBERT A. LONG EXCAV SUBDIVISION: FOREST MEADOW 2ND ADD PHONE: 509 924 4782 LOT: 15 BLOCK: 1 ZONE: UR-3.5 ADDRESS: 9415 S SANDS RD VALLEYFORD WA 99036 INSPECTOR: DAVE SILVA CONTACT: KEVIN FOLSOM PHONE: 509 924 4782 WATER DIST: SETBACKS -> FRONT: NA LEFT: NA RIGHT: NA REAR: NA OWNER: ASVESTAS CONSTRUCTION CO 1 LENDER NAME: PHONE: 509 924 1081 PHONE: ADDRESS: PO BOX 14244 ADDRESS: SPOKANE WA 99214 PERMTT0 SEWER PERMIT CONTRACTOR ROBERT A LONG LICENSE #: LONGRA*246R0 SEWER CONNECTION 1 PROCESSING FEE 10.00 TOTAL PERMIT FEE $50.00 PAYMENT SUMMARY NoTES PAYMENT DATE RECEIPT# PAYMENT AMOUNT ***FOR SEWER STUB AS-BUILT INFORMATION AND INSPECTIONS, CALL THE COUNTY UTILITIES DEPARTMENT AT 456-3604*** 07/06/94 00007532 $50.00 CONTRACTOR OR APPLICANT IS f OCA AND CONFIRM THE TOTAL FEES AMOUNT PAID AMOUNT OWING ELEVATION AND POSITION OF ';` • PRI ANY OTHER EXCAVATION $50.00 $50.00 $.00 TO LOCATE BURIED CABLES, GAS PIPING, "ATINES, ECT. ° CALL BEFORE YOU DIG (456-8000) SEWER STUBS ARE TO BE CHECKED PRIOR TO CONNECTION TO INSURE THAT THEY ARE CLEAR AND UNOBSTRUCTED TO THE SEWER MAIN ********* CALL FOR INSPECTION PRIOR TO COVER ********** ISSUED PERMIT BY: CAROL BRADBURN ********* 24 HOUR NOTICE REQUIRED ********** NLDTILE it is the responsibility of the permittee, not Spokane County,to see to it that the use described on the front of this permit complies with applicable codes and requirements and that required inspections are requested. Failure to request required inspections and obtain the necessary approvals prior to progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the owner's/permittee's expense. At a minimum, the following inspections ARE REQUIRED by County Code: 1. FOOTING - when forms and reinforcement are in place and prior to placement of concrete. NOTE: This inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning regulations.Typically, side and rear yard setbacks are measured from property lines,while setbacks for yards abutting streets are measured from the property line or the center line of the roadway right-of-way, whichever provides the greater setback from the center line of the roadway right-of-way. Curb lines and fence lines are not necessarily indicative of property lines. In some residential areas, the County can own as much as 20 feet of right-of-way between your property and the actual improved street/curb. The responsibility to comply with applicable setback provisions lies solely with the permittee—neither Spokane County nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. 2. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete. (Blocking for a manufactured home is required to be inspected prior to the installation of skirting.) 3. FRAMING - after all framing, bracing and blocking is in place, and prior to concealing. 4. INSULATION - prior to the installation of drywall. 5. PLUMBING - after rough-in, before covering, and final. 6. MECHANICAL - rough-in of piping, before covering, metal chimneys before concealment, and final. 7. FINAL - when complete and prior to occupancy and/or use. Please provide 24 hours notice. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants,fire department access, on-site drainage("208 swales"), road improvements, parking,and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. In addition to the above any plumbing or mechanical systems or materials which would be concealed by framing, drywall, concrete, etc., must be inspected prior to cover. Check with the department for "special inspections" in conjunction with commercial projects. CALL 456-3675 FOR INSPECTIONS. TO INSURE PROMPT SERVICE, PLEASE GIVE 24 HOUR NOTICE. YOUR INSPECTOR IS UNDER CERTAIN CIRCUMSTANCES, PARTS OF YOUR PROJECT MAY REQUIRE INSPECTIONS FROM OTHER AGENCIES: • Road cuts for utilities or drives, County Engineer's Office • Sewer connection, County Utilities Department 456-3600 456-3604 or State Department of Transportation or City Public Works Department 456-3000 625-6300 • On-site waste disposal system, Spokane County Health District • Electrical wiring, State Department of Labor and Industries 324-1560 324-2640 • Construction in a flood plain, County Engineer's Office 456-3600 EXPIRATION Unless otherwise noted, this permit will be considered null and void by limitation of the work authorized by the permit if not commenced or is stopped for a period of 180 days, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration. At a minimum an inspection should be requested at least once every 180 days to assure the validity of the permit. A permit may be renewed within one year of the date of expiration for one-half the original fee, subject to certain limitations—please call us if you have any questions. MISTAKES? If you think we've made an error in processing this permit or in conducting inspections pertaining to it, or find erroneous information in the permit, please bring it to our attention immediately by filing a written request for correction within 10 working days of discovery. All such requests should be directed to the Department of Buildings at the address found on the face of this permit. I certify that I have examined this permit/application, state that the information contained in it and submitted by me or my agent to compile said permit/application is true and correct, and authorize Spokane County to proceed with processing. In addition, I have read and understand the INSPECTION REQUIREMENTS/NOTICE provisions included herein and agree to comply with same. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. I understand that the issuance of this permit/application and any subsequent inspection approvals or Certificates of Occupancy shall not be construed to give authority to violate or cancel the provisions of any state or local law regulating construction, or as a warranty of conformance with the provisions of any state or local laws regulating construction. SIGNATURE OF APPLICATIO 1/ t OWNER OR AGENT �e.ALLI moi DATE 6 _ _ , :� Spokane County #y:. .. 3 Department of Building & Safety a--iii--4‘.;;a ilk:=;;`3, +; 11. JAMES L.MANSON,DIRECTOR ON-SITE SEWAGE DISPOSAL SYSTEM INFORMATIONAL REVIEW FORM For Single Family Residences TO Spokane County Environmental Health Division FROM: Spokane County Department of Building and Safety DATE : „v<D. -. , 190 RE On Site Sewage Disposal System REF : Describe Proposal : y--L,(24- f V-0-_-rJ- + d) , ►----0----- Property Owner - C. RN Road Name : `� �i� Parcel Number 5 - Street Address : • ( 1 3 p , fir Legal Description : F ,Q ' A. c/1�IZZ-�.�)•1T g v.I`l SIGNED : --- te- g1/, Z0-0%• Date: .•21. 'o Proposed 0 ne4rar Authorized Representative p esentative 1 . An initial review of the above-referenced property has been conducted by the Spokane County Planning Department and the following items are noted . An in-depth review of the property will again be made at the time a building permit is applied for. , Requirements reviewed for property as of the date set forth hereinabove . Yes/No/N .A Dedicatory Language within Plat ,- Subject Property is Legally Divided Certificate of Exemption Required Use Authorized Under Zoning Ordinance Setbacks Met in Zoning Ordinance Shorelines Permit Required Variance Required for Following Purposes : 1 Planning Department : 4P, aMIA..AL:4_4vi / Date : Z x'-90 On-Site Sewage System Review Form Page 2 of 2 2 . An initial review of the subject property has been conducted by the Spokane County Engineer' s Office and the following items are noted . An in-depth final review of the property will again be made at the time the building permit is applied for. SPECIAL REQUIREMENTS : Maintained County Road Frontage X Approach Permit Required Flood Zone Variance Requirements Other: Engineer ' s Offic- : �� �`� f C ' Date : 3 . The Spokane County Department of Building and Safety has advised the property owner/representative that at such time a structure or building is to be placed/constructed on the property , a building permit will be required . J/ Building and Safety Departmenq: _0 sate :y NOTE: The review by the various departments as provided for herein is solely for the purpose of advising the Spokane County Health District of the subject property ' s compliance with various codes and regulations . The issuance of a permit by the Spokane County Health District for the installation of an on-site sewage disposal system is not to be considered as a vesting of a right by the owner/rep- resentative to obtain a building permit for the property. At the time that a building permit is applied for, the subject property must comply with all applicable federal , state or local laws , ordinances or regulations with the exception of those relating to the issuance of a permit for the septic tank/drain field on-site sewage disposal system by the Spokane County Health District , pursuant to this form. Accordingly, although as of the date of this document the subject property may meet certain federal , state or local laws , ordinances or regulations , in the event such items change between the date of this document and the application for a building permit , the ow- ner/ representative will be responsible for meeting such regulations on the date of the application for the building permit .