2012, 11-02 Permit: SW-12002491 Sewer SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW-12002491 11/02/2012
Expiration Date:
Project Description: SEWER CONNECTION Primary Contact: ACME EXCVT&SEWER BORING CO
Project Name: WEST PONDEROSA Applicant: ACME EXCVT&SEWER BORING CO
Permit Type: SEWER Address: 6808 S.LINKE RD.
GREENACRES,WA 99016
Phone: (509)228-0691
Email:
SITE INFORMATION:
Site Address: 9623 E 43RD X1/4: Owner: CARPENTER LIVING TRUST
Parcel Number: 45323.0503 Address: PO BOX 405
CLARK FORK, ID 83811
Subdivision: PONDEROSA ACRES Phone:
7TH ADDITION
Assessor's Description: PONDEROSA ACRES 7TH ADD LT 3 BLK 3 Email:
Inspection Area:
Water District:Spokane Fire District:Spokane Valley Fire
County Water District#3
Zoning: Land Area:38997 Square Feet
Setbacks: Front Rear Left Right
RESIDENCE W/GARAGE 20 50 5 5
CONTRACTOR INFORMATION:
General Contractor
ACMEEES963LD
ACME EXCVT&SEWER BORING CO
6808 S. LINKE RD.
GREENACRES,WA 99016
(509)228-0691
DETAILS:
Class Type Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
$125.00
FEE DETAIL:
Processing-Utilities $25.94
Utilities Permit $125.00
Total Fee: $150.94
CONDITIONS:
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Date Printed:11/02/2012 09:14:18 Printed by:IIS APPPOOLWSP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW-12002491 11/02/2012
Expiration Date:
CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE.SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED.PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME.BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed:11/02/2012 09:14:18 Printed by:IIS APPPOOUASP.NET v4.0